| 1 | Reinforced cement concrete work in walls (any thickness) , including attached pilasters, buttresses , plinth and sting courses , fillets , columns , pillars , piers , abutments , posts and struts etc. upto floor five level excluding cost of centering , shuttering , finishing and reinforcement - 1:1.5:3 (1 cement : 1.5 fine aggregate : 3 graded stone aggregate 20mm nominal size) |
| 2 | Brick work with common burnt clay F.P.S (non modular ) bricks of class designation 3.5 in superstructure above plinth level upto floor five level in all shapes and sizes in - cement mortar 1:4 ( 1 cement : 4 fine aggregate) |
| 3 | 12mm cement plaster of mix -1:4 ( 1 cement : 4 fine aggregate) |
| 4 | Finishing walls with textured exterior paint of required shade - New work (Two or more coats applied @ 3.28 ltr / 10 sqm ) over and including priming coat of exterior primer applied @ 2.20 kg / 10 sqm |
| 5 | Providing and applying white cement based putty of average thickness 1mm of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete |
| 6 | Removing dry or oil bound distemper, water proofing cement paint and the like by scrapping, sand papering and preparing the surface smooth including necessary repairs to scratches etc.complete |
| 7 | Raking out joints in lime or cement mortar and preparing the surface for repointing or replastering , including disposal of rubbish to the dumping ground all complete as per direction of Engineer-in-charge |
| 8 | Flush pointing with cement mortar 1:3 (1 cement : 3 fine aggregate) mixed with 2% of integral water proofing compound by weight of cement for flat tile bricks on top of mud phaska - with F.P.S. brick tiles |
| 9 | Providing and fixing double scaffolding system (cup lock type) on the exterior side, upto seven story height made with 40 mm dia .M.S.tube 1.5m centre to centre , horizontal & vertical tubes joining with cup & lock system with M.S.tubes, M.S.tube challies, M.S.clamps and M.S.staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after. The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required locations with essential safety features for the workmen etc.complete as approved. The elevational area of the scaffolding shall be measured for payment purpose. The payment will be made once irrespective of duration of scaffolding. (Note: This item to be used for maintenance work judicically, necessary deduction for scaffolding in the existing item to be done.) |
| 10 | Demolishing R.C.C work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer-incharge |
| 11 | Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction ofEngineer-in-charge.- in cement mortar |
| 12 | Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead |
| 13 | Chipping of unsound / weak concrete material from slabs , beams , columns etc. with manual Chisel and / or by standard power driven percussion type or of approved make including tapering of all edges , making square shoulders of cavities including cleaning the exposed concrete surface and reinforcement with wire brushes etc. and disposal of debris for all lead and lifts all complete as per direction of Engineer-incharge- 50 mm average thickness |
| 14 | Chipping of unsound / weak concrete material from slabs , beams , columns etc. with manual Chisel and / or by standard power driven percussion type or of approved make including tapering of all edges , making square shoulders of cavities including cleaning the exposed concrete surface and reinforcement with wire brushes etc. and disposal of debris for all lead and lifts all complete as per direction of Engineer-incharge - 25 mm average thickness |
| 15 | Cleaning of reinforcement from rust from the reinforcing bars to give it a total rust free steel surface by using alkaline chemical rust remover of approved make with paint brush and removing loose particles after 24 hours of its application with wire brush and thoroughly washing with water and allowing it to dry , all complete as per direction of the Engineer-in-chargeBars above 12mm diameter |
| 16 | Providing, mixing and applying bonding coat of approved adhesive on chipped portion of RCC as per specifications and direction of Engineer-In-charge complete in all respect. 26.31.1SBR Polymer (@10% of cement weight) modified cementitious bond coat @ 2.2 kg cement per sqm of surface area mixed with specified proportion of approved polymer |
| 17 | Providing , mixing and applying SBR polymer (of approved make ) modified Cement mortar in proportion of 1:4 (1 cement : 4 graded fine aggregate with polymer minimum 2% by wt.of cement used) as per specifications and direction. Note: Measurement and Payment : The Pre-meaurement of thickness shall be done just after the surface preparation is completed and payment under this item shall be made only after proper wet curing has been done and surface has been satisfactorily evaluated by sounding / tapping with a blunt metal instrument and / or the 75mm size cube crusing strength at the end of 28 days to be not less than 30 N / Sqmm) - 25 mm average thickness in two layers |
| 18 | Providing , mixing and applying SBR polymer (of approved make ) modified Cement mortar in proportion of 1:4 (1 cement : 4 graded fine aggregate with polymer minimum 2% by wt.of cement used) as per specifications and direction. Note: Measurement and Payment : The Pre-meaurement of thickness shall be done just after the surface preparation is completed and payment under this item shall be made only after proper wet curing has been done and surface has been satisfactorily evaluated by sounding / tapping with a blunt metal instrument and / or the 75mm size cube crusing strengthat the end of 28 days to be not less than 30 N / Sqmm) - 50 mm average thickness in two layers |