| 1 | Pakka Check Dam/ Anicut Jungle Clearance 30cm scrub removal. RDPR BSR-2025/IT-192 |
| 2 | Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect. WDR BSR-2023 1B/CH-5 |
| 3 | Cement concrece (1:4:8) well mixed & laid in position complete including curing and finishing etc. Complete.RDPR BSR-2025/IT-170A |
| 4 | Stone kharanja in cement mortar (1:6) including curing etc. complete. RDPR BSR-2025/IT-149B |
| 5 | R.R.Stone masonary in cement mortar (1:6) including curing & finishing etc. complete for foundation. RDPR BSR-2025/IT-166A |
| 6 | R.R.Stone masonary in cement mortar (1:6) including curing & finishing etc. complete for superstructure.RDPR BSR-2025/IT-166A |
| 7 | Cement concrete(1:2:4) well mixed and laid in position complete including curing and finishing.RDPR BSR-2025/IT-13A |
| 8 | 25MM thick cement plaster in cement sand mortar (1:4) including racking of joints smooth finishing and curing of etc. Complete RDPR BSR-2025/IT-76A |
| 9 | Earth backfill by murrum/black cotton soil I/c loading, unloading and lead of 3 Km. wrd BSR-2023/ch-5-IT-13 |
| 10 | Dry stone pitching to D\S of H.W.E. (L+R)RDPR BSR-2025/IT-167 |
| 11 | Tip Work at PCD head wall, RDPR BSR 2022/IT-79A |
| 12 | ts-lh-ch- e\"khu VsªDVj e; Ldszij }kjk feV~Vh [kqnkbZ dk;Z] [kksnh gqbZ feV~Vh ds Mxyksa dks rksMus (Breaking of clods) ?kkl ,oa dadj iRFkj dks vyx djuk (Sorting of Grass &pebbles) ,oa c.M dk lsD\"ku ¼dkV {ks=Qy esa½ izksQkbZy la/kkfjr djuk e; p |
| 13 | Applying enamel paint in 3 layers to give even shade To create an even surface on new/old work. Jaswantpura RDPR BSR 2024-Item - #82A |
| 14 | Lettering with black Japan paint of approved brand and manufacture. PWD BSR 2022 Item 12.62 (Including Less 10% Contractor profit.) |
| 15 | Sunken Pond Jungle Clerance removal of Scrubs and ruts GKN BSR 2025 Item 191 |
| 16 | डागबेलिंग करना 5 सेमी. से 7.5 सेमी. गहराई तक GKN-BSR-2025-- Jaswantpura-Item- #6(ब) |
| 17 | ts-lh-ch- e\"khu VsªDVj e; Ldszij }kjk feV~Vh [kqnkbZ dk;Z] [kksnh gqbZ feV~Vh ds Mxyksa dks rksMus (Breaking of clods) ?kkl ,oa dadj iRFkj dks vyx djuk (Sorting of Grass &pebbles) ,oa c.M dk lsD\"ku ¼dkV {ks=Qy esa½ izksQkbZy la/kkfjr djuk e; p |
| 18 | Display board with painting and Letttering |
| 19 | SSB Clearing of forest, including general cutting of vegetation and bushes. RDPR BSR 2025 Item 191 |
| 20 | Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m in dry or moist including dressing of excavated area, dewatering wherever required complete in all respect. Less 10% CP. WRD BSR 2023 CH v/1a |
| 21 | Add extra over ietm 1 to 8 for disposal of excavated material above initial lift of 1.5m and for every additional lift of 1.5m or part there of including loading and unloading wherever required. Less 10% CP. WRD BSR 2023 Ch v/11. Lift 1 |
| 22 | Refilling the excavated earth (excluding rock) in trenches, plinth side of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering including cost of water, loading and un-loading wherever required with cost of dewatering wherever required.Less 10% CP. WRD BSR 2023 ch v/13 |
| 23 | Supplying, laying & spreading of LDPE film of 250 micron on bed and sides including jointing etc. complete as per specifications including cost of LDPE film, overlapping, adhesive tape etc. with transportation charges upto work site complete. Less 10% CP. WRD BSR 2023 ch ix/39 |
| 24 | Display Board With Paiting and Lettering |
| 25 | Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m in dry or moist including dressing of excavated area, dewatering wherever required complete in all respect. Less 10% CP.WRD BSR 2023 CH v/1b. |
| 26 | Add extra over ietm 1 to 8 for disposal of excavated material above initial lift of 1.5m and for every additional lift of 1.5m or part there of including loading and unloading wherever required. Less 10% CP.Lift 2 Please Enable Macros to View BoQ information |