|
| 1 | Dismentling of brick work built in cement mortar or cement lime mortar including all quoins, arches,pillar, etc. but excluding ashlar facing, dressed stone work and precast concrete articles complete, all as specified and as directed by the Engineer-in-Charge. |
| 2 | Material and labour for brick work with sub class \"B\" old size bricks straight or curved on plan exceeding 6 metre mean radius built in cement mortar (1:6) complete, all as specified and as directed by the Engineer-in-Charge. |
| 3 | All as per serial item No. 02 here in befor but except bricks old serviceable bricks obtained from serial item No01aboveincluding removing motar, cleaning the bricks with water, complete all as specified and as directed by the Engineer-in-Charge. |
| 4 | Taking down cement or cement lime plaster of any description on brick or stone walls, etc. including racking out joints, hacking for key scrubbing down with water, etc. complete all as specified and as directed by the Engineer-in-Charge |
| 5 | Material and labour rendering 15 mm thick(in patches not exceeding 03 sqm each) on brick work or concrete wall surfaces in cement mortar 1:4including mixing water proofing compound @ 2% by weight of cement or as per manufacturer\"s instruction and finished fair and even without using extra cement complete all as specified and as directed by the Engineer-in-Charge. ( Note- The cost of providing WPCshall be measured paid for seperately) |
| 6 | Supply only integral water proofingcompound,complete all as specified and as directed. |
| 7 | Material and labour for rendering 15 mm thick on any faces of brick work or concrete wall surfaces in cement mortar (1:6) and finishing the surface even and smooth without using extra cement complete all as specified and as directed by the Engineer-in-Charge. |
| 8 | Material and labour for rendering 10 mm thick on fair faces of brick work or concrete ceilingsurfaces, chajjas, etc. in cement mortar 1:3 andfinishedeven and smoothwithout using extra cement complete all as specified and as directed by the Engineer-in-Charge. |
| 9 | Material and labour for rough cast plaster complete as specified in SSR Part-I, clause 14.22 shall consisting of following:- firstly apply under coat in cement mortar 1:4 not less than 10 mm thick and while still it is in plastic state the rough cast mixture consisting of crushed stone or fine stone aggregate of size between 6 to 12 mm as per the texture required mixed with coarse sand and cement in the ratio 1:1:1 shall be applied, complete all as specified and as directed by the Engineer-in-Charge. |
| 10 | Material and labour for preparation of new plastered/unplastered surfaces of walls, chajjas, roof projection, etc. and applyingtwo coats of cement base paintover a coat of chalk whitening primer complete all as specified and as directed by the Engineer-in-Charge. |
| 11 | Material and labour for preparation of newly plastered/ unplastered surfaces of walls and applying two coats of acrylic distemperwith painting roller over and including 1 to 2 mm thick wall care putty white cement based in one or two coats to achieve smooth surfaces, complete all as specified and as directed by the Engineer-in-Charge. |
| 12 | Material and labourfor preparation of new plastered/unplastered surfaces and applyingthree coats of white lime wash on surfaces of walls, chajjas, roof projection etc., complete all as specified and as directed by the Engineer-in-Charge. |
| 13 | Disconnecting existing water tanks of capacity500 ltrsetting aside (or lowering if required) &cleaning and removing all scale and dirt etc from in side ofPVC/RCC tanks and mouths of circulating pipe & writing date on cleaning on the tank with synthetic enamel paint not less than 200mm long and 20mm wide of words and reconnecting and refixing of the tank in position to make it operational,complete, all as specified and as directed by the Engineer-in-Charge.NOTE :- (i)The unit rate shall be included cost of small fittings such as elbow, socket, reducer, tee, union, etc.(ii)The whole process of reconnecting and refixing inposition after cleaning/after carrying out water proofing treatment shall be done on the same day to ensure uninterrupted water supply to the occupant, if failing so, Rs. 200/– shall be deducted for each tank per day from the contractor due. |
| 14 | Material and labour for preparation of old decorated brick/concrete, plastered / unplastered surfaces of wallby brooming down with steel wire brushing, scrapping down smoke soot, moulds, moss and efflorescent salts and trading oil and greasy spots andapplying one coat of white lime wash onprepared surfaces ofwalletc., up to height of double storey bldg, complete, all as specified and as directed by the Engineer-in-Charge. |
| 15 | Material and labour for preparation of old decorated brick/concrete, plastered / unplastered surfaces of wallby brooming down with steel wire brushing, scrapping down smoke soot, moulds, moss and efflorescent salts and trading oil and greasy spots andapplying two coats of white lime wash onprepared surfaces ofwalletc., up to height of double storey bldg, complete, all as specified and as directed by the Engineer-in-Charge. |
| 16 | Material and labour for preparation of old decorated brick/concrete, plastered / unplastered surfaces of ceilingby brooming down with steel wire brushing, scrapping down smoke soot, moulds, moss and efflorescent salts and trading oil and greasy spots andapplying one coat of white lime wash onprepared surfaces ofceilingetc. complete all as specified and as directed by the Engineer-in-Charge. |
| 17 | Material and labour for preparation of old decorated brick/concrete, plastered / unplastered surfaces of ceilingby brooming down with steel wire brushing, scrapping down smoke soot, moulds, moss and efflorescent salts and trading oil and greasy spots andapplying two coats of white lime wash onprepared surfaces ofceilingetc. complete all as specified and as directed by the Engineer-in-Charge. |
| 18 | Material and labour for preparation of old decorated brick/concrete, plastered / unplastered surfaces of walls by brooming down with steel wire brushing, scrapping down smoke soot, moulds, moss and efflorescent salts and trading oil and greasy spots andapplying one coat of acrylic distemperwith painting roller over prepared surfaces ofwalls pillars, cornices etc.complete all as specified and as directed by the Engineer-in-Charge. |
| 19 | Material and labour for preparation of old decorated brick/concrete, plastered / unplastered surfaces of walls by brooming down with steel wire brushing, scrapping down smoke soot, moulds, moss and efflorescent salts and trading oil and greasy spots andapplying two coats of acrylic distemperwith painting roller over prepared surfaces ofwalls pillars, cornices etc.complete all as specified and as directed by the Engineer-in-Charge. |
| 20 | Material and labour for complete removal of existing treatment (any number of layers) using appropriate technique as approved by EIC for complete removal of all layers of old treatment and reaching upto old plastered surface of walls, pillars, cornices, etc., and apply one or two coats of wall care puttyand applying two coats of cement base paint over a coat of chalkwhitingcomplete, all as specified and as directed by the Engineer-in-Charge. |
| 21 | Material and labour for complete removal of existing treatment (any number of layers) using appropriate technique as approved by EIC for complete removal of all layers of old treatment and reaching upto old plastered surface of walls, pillars, cornices, etc., and applying 1 to 2 mm thick water proof putty white cement based in one or two coats to achieve smooth surfaces and applying two coats of acrylic exterior emulsion paint over one coat of primer , complete, all as specified and as directed by the Engineer-in-Charge. |
| 22 | Material and labour for complete removal of existing treatment (any number of layers) using appropriate technique as approved by EIC for complete removal of all layers of old treatment and reaching upto old plastered surface of walls, pillars, cornices, etc., and applying 1 to 2 mm thick water proof putty white cement based in one or two coats to achieve smooth surfaces and applying two coats ofacrylic interior emulsion paint over one coat of primer with painting roller, complete, all as specified and as directed by the Engineer-in-Charge. |
| 23 | Material and labour for complete removal of existing treatment (any number of layers) on brick/concrete, plastered / un--plastered surfaces of wallsand applying 1 to 2 mm thick water proof putty white cement based in one or two coats to achieve smooth surfaces applying one coats of cement base complete, all as specified and as directed by the Engineer-in-Charge. |
| 24 | Material and labour for complete removal of existing treatment (any number of layers) on brick/concrete, plastered / un--plastered surfaces of wallsand applying 1 to 2 mm thick water proof putty white cement based in one or two coats to achieve smooth surfaces applying two coats of cement base complete, all as specified and as directed by the Engineer-in-Charge. |
| 25 | Material and labour for preparation of old decorated steelsurfacesof any description, not otherwise described, over10 cm width or girth and applying two coat of synthetic enamel paintcomplete, all as specified and as directed by the Engineer-in-Charge. |
| 26 | Material and labour forpreparation of old decorated woodensurfacesof any description, not otherwise described, over10 cm width or girth and applying two coat of synthetic enamel paintcomplete, all as specified and as directed by the Engineer-in-Charge. |
| 27 | Cutting grass / shrubs / bushes/roots/vegetation etc. from wall surfaces , near PVC rain /waste water pipes/sewer pipes , open roof terraces , around first manholes and includingremovinggrass / shrubs / bushes/roots/ vegetation etc.to out side the defence landand clearing the entire area complete all as specified and directed. Note : - (i) The above rates are inclusive of making good of disturbed wall surfaces with 15 mm thick rendering in cm 1:4 as complete satisfaction of engineer in charge .(ii) The rates are inclusive of filling small holes of disturbed portion of walls with cement mortar 1:4 during cutting / uprooting of grass / shrubs / bushes/roots/vegetation.(iii) The contractor shall quote his rates keeping this aspect in mind. Nothing extra shall be admissible to contractor on this account. |
| 28 | Dismantling boarding/ ceilingany discription, fixed in position complete all as specified & directed by the Engr-in-Charge. |
| 29 | Supply and fixingGI Metal Suspended ceiling of approved materials of size 595x595 mm in true horizontal level, suspended on inter locking metal grid of hot dipped galvanized steel sections ( galvanized @ 120 grams/ sqm, both side inclusive) consisting of main “T” runner with suitably spaced joints to get required length and of size 24x38 mm made from 0.30 mm thick (minimum) sheet, spaced at 1200 mm centre to centre and cross “T” of size 24x25 mm made of 0.30 mm thick (minimum) sheet, 1200 mm long spaced between main “T” at 600 mm centre to centre to form a grid of 1200x600 mm and secondary cross “T” of length 600 mm and size 24x25 mm made of 0.30 mm thick (minimum) sheet to be interlocked at middle of the 1200x600 mm panel to form grids of 600x600 mm and wall angle of size 24x24x0.3 mm and laying false ceiling tiles of approved texture in the grid including, required cutting/making, opening for services like diffusers, grills, light fittings, fixtures, smoke detectors etc. Main “T” runners to be suspended from ceiling using GI slotted cleats of size 27 x 37 x 25 x1.6 mm fixed to ceiling with 12.5 mm dia and 50 mm long dash fasteners, 4 mm GI adjustable rods with galvanised butterfly level clips of size 85 x 30 x 0.8 mm spaced at 1200 mm centre to centre along main T, bottom exposed width of 24 mm of all T-sections shall be pre-painted with polyester paintcomplete for all heights as per specifications including4mm thick HPSC pre-prime non asbestos fibre cement building board (E-classic or equivalent) decorative finish fixed toframe work with holding down clips in false ceiling complete all as specified and as directed |
| 30 | Supply and fixing 5mm PVC hollow sheet (the thicknees of inner wall 0.7 to 1.00mm) in wall panelling inclusive of solvent cement and fixing at site with U clip or PVC frame as per specifications and drawing complete all as specified and as directed by the Engineer–in–Charge |
| 31 | Material and labour preparation of old decorated surfaces of walls / kerb stone / concrete (plastered or unplastered ) by brooming downetc applying over one coat of synthetic enamel paint (white or tinted)complete all as specified and directed. |
| 32 | Material and labour for preparing new/old plastered surface and applying textured finish consisting of u/m items :-(i) One coat of cement base putty 1-2 mm thick (ii) one coat of smartcare damp sheath of Asian or equivalent in Berger/Dulux interior primer @ 2sqm/litre(iii) One coat of 3mm thick duracast rough texture paint.(iv) Two coats of plastic emulsion paint (Royal Aspira of Asian or equivalent in Berger/Dulux). |
| 33 | Hacking out old broken glass (any thickness, size, quality or description) from wooden frames or stone, concrete or brick surrounds and steel window frame glazed with putty or fixed with beads complete, all as specified and as directed by the Engineer-in-Charge. |
| 34 | Material and labour for sheet glass 4.0mm thick ordinary qualityin squareexc 0.5 sqm in each pane fixed to aluminium frame work with glazing clips, rubber packing, etc., glazing with oil putty to steel window and with wooden beads to wooden shutters, complete all as specified and as directed. |
| 35 | Dismentling of PVC pipes/SGSW/AC/RCC pipesand rainwater pipes (any size or pattern), including all fittings, heads, shoes, bends, swan–necks, etc., including cleaning or refixing or removal to store (measured overall as fixed along the centre line over fittings and accessories) , complete, all as specified and as directed. |
| 36 | Supply and fixing 110mm PVC (SWR) pipes single socketed, in any length with rubber ring joints, laid in trenches or underfloors or fixed to wallcomplete, all as specified and as directed. |
| 37 | All as per serial item No.36 here in before but except pipe, old servicable pipe shall be usedas obtained from serial item No 35 here in before, complete, all as specified and as directed. |
| 38 | Supply and fixingfor 110 mm dia PVC (SWR) bends any radius complete, all as specified and as directed. |
| 39 | Supply and fixing for stack clamp out of 50mm x5mm flat iron stays including bolt and nuts and securing ends of stays to walls or roof for 110mm bore pipe complete all as specified and directed. |
| 40 | Note:-Amount of credit ofRs.38,090.00 for retrieved materials is mentioned in Schedule of Credit Page No.102 of tender documents in pdf form which will be deducted offline while acceptance of tender. |