| 1 | TOILET RENOVATION WORK - GROUND FLOOR |
| 2 | TOILET PASSAGE EXTENTION BRICK WALL - CONSIDERING BRICK WALL THICKNESS 230mm and CEMENT MORTAR 1:4 |
| 3 | TOILET PASSAGE EXTENTIONCEMENT PLASTER 15 mm Mix 1:4 (GROUND FLOOR) |
| 4 | TOILET BRICK WORK (GROUND FLOOR) - CONSIDERING BRICK WALL THICKNESS 230mm and CEMENT MORTAR 1:4 |
| 5 | TOILET BRICK WORK (GROUND FLOOR) - CEMENT PLASTER 15 mm Mix 1:4 |
| 6 | NEAT CEMENT PUNNING |
| 7 | INTERIOR PAINT |
| 8 | EXTERIOR PAINT |
| 9 | FLOOR HEIGHT EXTENSION WORK - GROUND FLOOR |
| 10 | PCC: 1:3:6 (Cement: Sand: Coarse Aggregate) |
| 11 | TOILET FLOOR HIGHT EXTENTION GROUND FLOOR CONSIDERING RCC (M20) : 1:1.5:3 |
| 12 | CENTERING AND SHUTTERING (SUB STRUCTURE)FOR TOILET FLOOR HIGHT EXTENTION GROUND FLOOR SCREED THICKNESS 100 mm |
| 13 | BRICK WORK WITH CEMENT MORTAR 1:4 |
| 14 | NEAT CEMENT PUNNING |
| 15 | FLOOR FINISH WITH VETRIFIED FLOOR TILES INCLUDING INSTALATION |
| 16 | SKIRTING (VETRIFIED) |
| 17 | NEW TOILET CONSTRUCTION WORK - 1st FLOOR |
| 18 | TOILET ROOF CASTING SLAB THICKNESS 150 mm RCC M20 (1:1.5:3) |
| 19 | 1st FLOOR TOILET BRICK WORK CONSIDERING BRICK WALL THICKNESS 230mm AND CEMENT MORTAR 1:4 |
| 20 | TOILET BRICK WORK (1ST FLOOR) - CEMENT PLASTER 15 mm Mix 1:4 |
| 21 | 1ST FLOOR OUTSIDE TOILET BRICK WORK CONSIDERING THICKNESS 230mm AND CEMENT MORTAR 1:4 |
| 22 | 1ST FLOOR OUTSIDE TOILET CEMENT PLASTER 15 mm Mix 1:4 |
| 23 | CENTERING AND SHUTTERING (SUPER STRUCTURE)FOR TOILET FLOOR HIGHT EXTENTION GROUND FLOOR SCREED THICKNESS 100 mm |
| 24 | NEAT CEMENT PUNNING |
| 25 | INTERIOR PAINT |
| 26 | EXTERIOR PAINT |
| 27 | PLUMBING WORK |
| 28 | PLUMBING WORK PIPE LINE GROUND FLOOR TOILET |
| 29 | URINAL GROUND FLOOR |
| 30 | BASIN GROUND FLOOR |
| 31 | COMOD GROUND FLOOR |
| 32 | TOILET (INDIAN) GROUND FLOOR |
| 33 | PLUMBING WORK PIPE LINE 1ST FLOOR |
| 34 | URINAL 1ST FLOOR |
| 35 | BASIN 1ST FLOOR |
| 36 | TOILET (INDIAN) 1ST FLOOR |
| 37 | EXTERNAL PAINTING WORK |
| 38 | EXTERIOR PAINT OTHER AREAS AS PER SITE CONDITION |
| 39 | DISMAMTLING OF EXISTING STRUCTURES AT GROUND FLOOR INCLUDING EXCAVATION & FILLING WORKS |
| 40 | Door Frame along with DOOR installation |
| 41 | TOILET GROUND FLOOR (PVC) |
| 42 | TOILET 1ST FLOOR (PVC) |
| 43 | CLEANING, LIFTING, LOADING AND DISPLACEMENT TO A DESIGNATED PLACE WITHIN 1 KM OF DISMANTLED ITEMS |