|
| 1 | Material |
| 2 | Dead End Clamp with I Hook AB Cable SP-21 |
| 3 | Nut & Bolts |
| 4 | LT Clamp with N&B ST Pole SP-10 |
| 5 | Stay clamp for SP-23 with N&B |
| 6 | Stay clamp for SP-10 with N&B |
| 7 | AKM-16 Earth wire clamp SP-23 with N&B |
| 8 | PG Clamp for Rabbit/weasel with N&B |
| 9 | Suspension Clamp with I Hook |
| 10 | PP & Clamp with N&B ST Pole SP-23 |
| 11 | Anti Climbing Device |
| 12 | LT Distribution Box |
| 13 | Neutral Connector 50/25-25 sq.mm |
| 14 | Piercing Connector 35-35 sq.mm |
| 15 | LT XLPE Cable 1x16 sq.mm insulated for DB |
| 16 | LT XLPE Cable 1x35 sq.mm |
| 17 | LT AB Cable 3x35+1x25 sq.mm |
| 18 | Al. Crimping type Lugs 35 sq.mm |
| 19 | Labour |
| 20 | Chemical Earthing |
| 21 | Erection of Earthing Rod |
| 22 | Fabrication of Steel |
| 23 | Excavation of Pit for Stay set |
| 24 | Erection of LT Stay set |
| 25 | Erection of 11 KV Stay set |
| 26 | Grouting of Stay set |
| 27 | Excavation of Pit for Pole |
| 28 | Erection of Single SP-10 Pole |
| 29 | Erection of single SP-23 Pole |
| 30 | Grouting of Pole |
| 31 | Muffng of Pole |
| 32 | Dismantling of LT Line 1 Phase 2 wire (Weasel) |
| 33 | Dismantling of 16 Kva DTRs |
| 34 | Painting of SP-21/23 Pole |
| 35 | Installation of 25 Kva DTRs on Pole structure |
| 36 | Fixing of Fuse set |
| 37 | Fixing of Lightning arrestor |
| 38 | Laying of weasel conductor in HT Line |
| 39 | Lopping & Chopping of tree branches |
| 40 | Cont., Inst of danger board/Number plate |
| 41 | Cartage of SP-10 Pole 71-100 Km |
| 42 | Cartage of SP-21/23 Pole 71-100 Km |
| 43 | Cartage of Petty material 71-100 Km |
| 44 | Cartage of 16/25 Kva T/f 71-100 Km |
| 45 | Head load cartage SP-10 Pole (0-1 Km.) |
| 46 | Head load cartage SP-21/23 Pole (0-1 Km.) |
| 47 | Head load cartage of Petty material (0-1 Km.) |
| 48 | Head load cartage of 16 Kva T/F (0-1 Km.) |
| 49 | Head load cartage of 25 Kva T/F (0-1 Km.) |
| 50 | Laying of LT AB Cable 3x35+1x25 sq.mm |
| 51 | Straightning of tilted existing pole |
| 52 | Installation of LT DB 3 Phase for LT AB Cable |
| 53 | Disconnection & Reconnection of Consumer |
| 54 | Back Cartage of Petty material 71-100 Km |
| 55 | Fixing of Dead End Clamp |
| 56 | Fixing of Suspension clamp with I Hook |
| 57 | Back Head load cartage of Petty material 0-1 Km Fixing of Aluminium Lugs Please Enable Macros to View BoQ information |