| 1 | Finishing walls with water proofing cement paint of required shade :Oldwork (oneor morecoats applied @2.20kg/10sqm) [email protected]/10sqm complete including cost of Priming coat. |
| 2 | Paintingwithsyntheticenamelpaintofapprovedbrandand manufacture to give an even shade :Two or more coats on new work |
| 3 | Applying priming coat :With ready mixed pink or Grey primer of approved brand and manufacture on wood work (hard and soft wood) |
| 4 | White washing with lime to give an even shade :Old work (two or more coats) |
| 5 | Repairs to plaster of thickness 12mm to 20mm in patches of area 2.5 sq. meters and under including cutting the patch in proper shape, raking outjointsandpreparingandplasteringthesurfaceofthewalls completeincluding disposalofrubbishtothedumpinggroundwithin 50metres lead :With cement mortar 1:4 (1 cement : 4 fine sand) |
| 6 | Dismantlingoldplasterorskirtingrakingoutjointsandcleaningthe surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead. |
| 7 | Carriage of material by mechanical transport including loading, unloading and stacking:Lime, moorum, building rubbish:Lead 1 KM. |
| 8 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) |
| 9 | DemolishingR.C.C.workmanually/bymechanicalmeansincluding stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. |
| 10 | 20 mm cement plaster of mix :1:4 (1 cement: 4 fine sand) |
| 11 | Reinforcedcementconcreteworkinwalls(anythickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up to floor five level excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) |
| 12 | ReinforcementforR.C.C. workincludingstraightening,cutting, bending, placing in position and binding all complete. Cold twisted bars |
| 13 | Centeringandshutteringincludingstrutting,proppingetc.and removal of form for : Foundations,footings,basesofcolumns,etc.for mass concrete. |