| 1 | Demolition of cement concreteof any description and in any position (un-reinforced) in ground floors and paving not exceeding 15 cm thick (below or above GL) complete all as specified and directed.Note:Demolition material throughout MOD Land rate include above item . |
| 2 | M & L PCC (1:2:4) Type B0 (using 12.5 mm graded stone aggregate) pan, cills, steps; seismic and other similar bands,plinth courses, string courses,lacing courses, parapets and railings upto 60 cm in height,copings, kneelers, apex stones, bed plates, kerbs not provided for in water troughs and the like including weathering, slightly rounded or chamfered angleover roof ,surface finished even and Smooth mixed with water proofing compond complete all as speceified and as directed. Note : Water proofing compound shall be measured and paid separately under appropriate item of BOQas\"supply only \" |
| 3 | M & L for applying Smartcare Dampproof, a fibre reinforced elastomeric liquid water proofing membrane formulated with reinforcing acrylic fibers having Sun Reflectivity Index (SRI) of 105 on horizontal/vertical surfaces of roof/wall/chajjas in multiple coats @2.0 litre/sqm. Primary coat is self-priming coat of elastomeric waterproofing liquid (dilution with water in the ratio of 3:1, damp proof : water) and other coats to be applied undiluted. The coating needs to be reinforced with 40 GSM geotextile, to sandwiched between 2nd & 3rd coat of coating. The application shall be carried out after scrapping and properly cleaning the surface to remove loose particles with wire brushes complete all as speceified and as directed. Notes: (1) The work shall be executed through authorised applicator of manufacturer only.(2) Authrised Applicator shall be approved by GE before starting of work.(3) All materials shall be procured directly form manufacturer. (4) The contractor shall furnish a written guarantee for the effectiveness of the water proofing treatment for a periodof Eight yearsin favour of the GE. |
| 4 | Supply only Liquid water proofing compound complete all as speceified and as directed. |
| 5 | Apply the non snrink high mechnical strenght properties epoxy based morter @ 5 kg/RM on all corner joints of wall to prevent the capillari formation from wall to roof area, by component system comprising of base. Hardener and quartz filler having ER base and Hardener with Quartz filler etc complete all as specified and directed. |
| 6 | Taking down cement plaster on brick or stone walls, etc. including raking out joints, hacking for key, scrubbing down wih water, etc complete all as specified and as directed |
| 7 | M&L for 15 mm thick rendering in cement mortar (1:4) on brick / concrete/ stone surfaces finished even and smooth without using extra cementcomplete all as specified and as directed. |
| 8 | Material & Labour for applying Two or more coats of 100% Premium acrylic emulsion paint having VOC less than 50 gm/litre and UV resistance as per IS 15489:2004, Alkali & fungal resistance, dirt resistance exterior paint of required shade (Company Depot Tinted) with silicon additives @ 1.43 litre/ 10 sqm over and including priming coat of exterior primer applied @ 0.90 litre/ 10 sqm over new surfaces complete all as specified and directed. |
| 9 | Taking up or down 20mm bore steel tubing and connections including cleaning for refixing removing from site complete all as specified and as directed. |
| 10 | Taking up or down 25 mm bore steel tubing and connections including cleaning for refixing removing from site complete all as specified and as directed. |
| 11 | Supply and laying 20mm dia of bore CPVC pipe SDR11 and Plain CPVC SDR11 fittings (ISI ) marked ,concealed or fixed to wall or laid in floors complete all as specified and as directed |
| 12 | Supply and laying 25mm dia of bore CPVC pipe SDR11 and Plain CPVC SDR11 fittings (ISI ) marked ,concealed or fixed to wall or laid in floors complete all as specified and as directed |
| 13 | Dismantling of water tanks exc 250 ltr and n.exc 500ltr capacity and removing from site complete all as specified and as directed |
| 14 | Dismantling of water tanks exc 500 ltr and n.exc 1000 ltr capacity and removing from site complete all as specified and as directed |
| 15 | S&F Rotational moulded poly-ethylene Three layered antibactrial film tanks(cylinderical vertical ) 500 litres capacity, white colour hoisted and fixed in position complete all as specified and directed. |
| 16 | S&F Rotational moulded poly-ethylene two layered antibactrial film tanks(cylinderical vertical ) 1000 litres capacity, white colour hoisted and fixed in position complete all as specified and directed. |
| 17 | Disconnecting existing tanks, exc 250 ltr and n.exc 500 ltr capacitysetting aside (or loweringif required)for repairs, cleaning, etc. and hoisting if required reconnecting and re-fixing in position. (Cleaning repairing, etc. measured separately) complete all as speceified and as directed. |
| 18 | Disconnecting existing tanks, exc 500 ltr and n.exc 1000 ltr capacity setting aside (or loweringif required)for repairs, cleaning, etc. and hoisting if required reconnecting and re-fixing in position. (Cleaning repairing, etc. measured separately) complete all as speceified and as directed |
| 19 | S&F20 mm Ball valves high pressure of PTMT with epoxy coated Aluminiumrod& highdensity plastic ball screwed for iron pipe and fixed 20mm dia of pipe .(Minimum weight 15mm-142gms/ 20mm-210gms./ 25mm-455gms/ 40mm - 690 gms) complete all as specified and directed. |
| 20 | Taking down eaves gutters and rain water pipes (any size 75mm to 110mm of any pattern) ,of any description and in any position, including all fittings , heads, shoes, bends, swan necks, etc.,(measured overall as fixed along the centre line over fittings and accessories) complete all as speceified and as directed |
| 21 | S&F for 110mm dia PVC(SWR)pipes single socketed, in any length with rubber ring joints,fixed to walls complete all as speceified and as directed |
| 22 | S&F for 75 mm dia PVC(SWR)pipes single socketed, in any length with rubber ring joints,fixed to walls complete all as speceified and as directed |
| 23 | S&F for 110mm dia PVC(SWR) pipes bends any radious complete all as specified and directed. |
| 24 | S&F for 75 mm dia PVC(SWR) pipes bends any radious complete all as specified and directed. |
| 25 | S&FSWR pipe Access door bend 75mm/ 110mm complete all as specified and directed |
| 26 | S&F for 110mm dia PVC(SWR) vent cowl, complete all as specified and directed. |