Sales : +91-777 804 8217
| Sl. No. | Item Description |
| 1 | Material and labour for carrying out the descaling of the shell & tube condenserssuitable for by isolation of each condenser by providing of dummy plate for inlet & outlet connection and separation of condenser from water circulation without disturbing the operation of the AC Plant, carrying out the descaling by circulation of the diluted scale removing agent organic compound type chemical of RA III / chemtex Brand at the appropriate ratio depend upon the scale deposit inside copper tube by forced circulation and opening the end covers, manually brushing the copper tubes with nylon brushes of various size to remove complete scale, de-greasing with caustic soda solution and flushing out with fresh water, refixing all disconnected pipes lines, end covers with new rubber gasket and opening water line valves and checking of water leakages, apply grease to all MS bolts & nuts and put the condensers of 12.5 TR to 20 TR in operational complete all as specified and directed by Engr-in-charge. |
| 2 | Material and labour for carrying out the descaling of the shell & tube condenserssuitable for by isolation of each condenser by providing of dummy plate for inlet & outlet connection and separation of condenser from water circulation without disturbing the operation of the AC Plant, carrying out the descaling by circulation of the diluted scale removing agent organic compound type chemical of RA III / chemtex Brand at the appropriate ratio depend upon the scale deposit inside copper tube by forced circulation and opening the end covers, manually brushing the copper tubes with nylon brushes of various size to remove complete scale, de-greasing with caustic soda solution and flushing out with fresh water, refixing all disconnected pipes lines, end covers with new rubber gasket and opening water line valves and checking of water leakages, apply grease to all MS bolts & nuts and put the condensers of 21 TR to 50 TR in operational complete all as specified and directed by Engr-in-charge. |
| 3 | Material and labour for dismantling and overhauling of condenser/ Chiller/ hot water pump set of capacity 10 HP,dismantling pump and motor separately, cutting the burnt out winding from slots and rewinding the same by existing size and gauge of super enamalled copper wire including varnishing, heating, repairing the insulating materials, repalcing bearings, bushes and remetalling the shaft including necessary heat treatment, and repairing the pump, including replacing the gland packing, bearingsand all rustednuts and bolts, washersand remetaling the Impeller of suitable size and bore for lifting the water from sourceand reassembling the motor and pump with gland packing includings painting of pump amd motor assambly complete with two coats ofsuper enameled paints over one coats of red oxide,fixing the motor & pump at its position and connecting the suction and delivery water pipe and testing under working conditions complete all as specified and directed by Engr-in-Charge. |
| 4 | Material and labour for dismantling and overhauling of condenser/ Chiller/ hot water pump set of capacity 7.5 HP,dismantling pump and motor separately, cutting the burnt out winding from slots and rewinding the same by existing size and gauge of super enamalled copper wire including varnishing, heating, repairing the insulating materials, repalcing bearings, bushes and remetalling the shaft including necessary heat treatment, and repairing the pump, including replacing the gland packing, bearingsand all rustednuts and bolts, washersand remetaling the Impeller of suitable size and bore for lifting the water from sourceand reassembling the motor and pump with gland packing includings painting of pump amd motor assambly complete with two coats ofsuper enameled paints over one coats of red oxide,fixing the motor & pump at its position and connecting the suction and delivery water pipe and testing under working conditions complete all as specified and directed by Engr-in-Charge. |
| 5 | Material and labour for dismantling and overhauling of condenser/ Chiller/ hot water pump set of capacity 5 HP,dismantling pump and motor separately, cutting the burnt out winding from slots and rewinding the same by existing size and gauge of super enamalled copper wire including varnishing, heating, repairing the insulating materials, repalcing bearings, bushes and remetalling the shaft including necessary heat treatment, and repairing the pump, including replacing the gland packing, bearingsand all rustednuts and bolts, washersand remetaling the Impeller of suitable size and bore for lifting the water from sourceand reassembling the motor and pump with gland packing includings painting of pump amd motor assambly complete with two coats ofsuper enameled paints over one coats of red oxide,fixing the motor & pump at its position and connecting the suction and delivery water pipe and testing under working conditions complete all as specified and directed by Engr-in-Charge. |
| 6 | Material and labour for dismantling and overhauling of condenser/ Chiller/ hot water pump set of capacity 3 HP,dismantling pump and motor separately, cutting the burnt out winding from slots and rewinding the same by existing size and gauge of super enamalled copper wire including varnishing, heating, repairing the insulating materials, repalcing bearings, bushes and remetalling the shaft including necessary heat treatment, and repairing the pump, including replacing the gland packing, bearingsand all rustednuts and bolts, washersand remetaling the Impeller of suitable size and bore for lifting the water from sourceand reassembling the motor and pump with gland packing includings painting of pump amd motor assambly complete with two coats ofsuper enameled paints over one coats of red oxide,fixing the motor & pump at its position and connecting the suction and delivery water pipe and testing under working conditions complete all as specified and directed by Engr-in-Charge. |
| 7 | Taking down carefully burnt out electric driven AHU blower motor 20 HP capacityafter disconnecting main electric supply from the motor starter panel, dismantling motor carefully for checking, removing to workshop for repairing, taking out burnt, coils from the slots of stator, other accessories such as ball bearing, rotor, cleaning the stator slots and rewinding the same with new super enamelled copper winding wire, heating, varnishing, re-assembling the same after greasing the ball bearing motor refixingto original position after repairing from workshop, reinstallation on existing channel and reconnecting to electric supply, commissioning and testing complete all as specified and as directed by Engr-in-Charge. |
| 8 | Taking down carefully burnt out electric driven AHU blower motor 15 HP capacityafter disconnecting main electric supply from the motor starter panel, dismantling motor carefully for checking, removing to workshop for repairing, taking out burnt, coils from the slots of stator, other accessories such as ball bearing, rotor, cleaning the stator slots and rewinding the same with new super enamelled copper winding wire, heating, varnishing, re-assembling the same after greasing the ball bearing motor refixingto original position after repairing from workshop, reinstallation on existing channel and reconnecting to electric supply, commissioning and testing complete all as specified and as directed by Engr-in-Charge. |
| 9 | Taking down carefully burnt out electric driven AHU blower motor 10 HP capacityafter disconnecting main electric supply from the motor starter panel, dismantling motor carefully for checking, removing to workshop for repairing, taking out burnt, coils from the slots of stator, other accessories such as ball bearing, rotor, cleaning the stator slots and rewinding the same with new super enamelled copper winding wire, heating, varnishing, re-assembling the same after greasing the ball bearing motor refixingto original position after repairing from workshop, reinstallation on existing channel and reconnecting to electric supply, commissioning and testing complete all as specified and as directed by Engr-in-Charge. |
| 10 | Taking down carefully burnt out electric driven AHU blower motor 7.5 HP capacityafter disconnecting main electric supply from the motor starter panel, dismantling motor carefully for checking, removing to workshop for repairing, taking out burnt, coils from the slots of stator, other accessories such as ball bearing, rotor, cleaning the stator slots and rewinding the same with new super enamelled copper winding wire, heating, varnishing, re-assembling the same after greasing the ball bearing motor refixingto original position after repairing from workshop, reinstallation on existing channel and reconnecting to electric supply, commissioning and testing complete all as specified and as directed by Engr-in-Charge. |
| 11 | Taking down carefully burnt out electric driven AHU blower motor 5 HP capacityafter disconnecting main electric supply from the motor starter panel, dismantling motor carefully for checking, removing to workshop for repairing, taking out burnt, coils from the slots of stator, other accessories such as ball bearing, rotor, cleaning the stator slots and rewinding the same with new super enamelled copper winding wire, heating, varnishing, re-assembling the same after greasing the ball bearing motor refixingto original position after repairing from workshop, reinstallation on existing channel and reconnecting to electric supply, commissioning and testing complete all as specified and as directed by Engr-in-Charge. |
| 12 | Taking down carefully burnt out electric driven AHU blower motor 3 HP capacityafter disconnecting main electric supply from the motor starter panel, dismantling motor carefully for checking, removing to workshop for repairing, taking out burnt, coils from the slots of stator, other accessories such as ball bearing, rotor, cleaning the stator slots and rewinding the same with new super enamelled copper winding wire, heating, varnishing, re-assembling the same after greasing the ball bearing motor refixingto original position after repairing from workshop, reinstallation on existing channel and reconnecting to electric supply, commissioning and testing complete all as specified and as directed by Engr-in-Charge. |
| 13 | Taking down carefully burnt out electric driven cooling tower motor 5 HP capacityafter disconnecting main electric supply from the motor starter panel, dismantling motor carefully for checking, removing to workshop for repairing, taking out burnt, coils from the slots of stator, other accessories such as ball bearing, rotor, cleaning the stator slots and rewinding the same with new supper enameled copper winding wire, heating, varnishing , re-assembling the same after greasing the ball bearing motor refixingto original position after repairing from workshop, reinstallation on existing channel and reconnecting to electric supply, commissioning and testing complete all as specified and as directed by Engr-in-Charge. |
| 14 | Taking down carefully burnt out electric driven AHU blower motor 3 HP capacityafter disconnecting main electric supply from the motor starter panel, dismantling motor carefully for checking, removing to workshop for repairing, taking out burnt, coils from the slots of stator, other accessories such as ball bearing, rotor, cleaning the stator slots and rewinding the same with new super enamelled copper winding wire, heating, varnishing, re-assembling the same after greasing the ball bearing motor refixingto original position after repairing from workshop, reinstallation on existing channel and reconnecting to electric supply, commissioning and testing complete all as specified and as directed by Engr-in-Charge. |
| 15 | Material and labour for servicing of Monoblock Centrifugal pump set by greasing, cleaning the shaft replacing gland packing/ bush bearing of existing size, replacement of unserviceablenut, bots, washers, rushted flanged & couplers/impeller etc.3 to 10 HP pump set complete all as specified and directed by Engr-in-charge. |
| 16 | Material and labour for cleaning and servicing of FRP cooling tower of central type AC Plant of cap 25 TR to 100 TR, removal of water tray, pipe line and cleaning of cooling tower fins by using brush complete all as specified and directed by Engineer-in-Charge. |
| 17 | Pressure testing / leak arresting , vaccuming with dry nitrogen gas at the maximum pressure of 300 to 400 PSI/ oil charging, including replacing the unserviceable strainersall as required andtesting complete for the Central type AC Plant of each unit capacity 13 to 50 TR atvarious locations/buildings oftech area and all as specified and directed by Engr- in-charge .Note :-(i) Refregerant Gas R-22/407/410 and strainers will be measured and paid seperately under suply only items. (ii) The Nitrigen gas pressure should be not less then 350 PSI during Leak arresting of the plants and it will hold the same pressure upto 24 hoursand vaccum pressure should not be less then (-30 micron Pressure) during the Vaccumingof plants. |
| 18 | Material and labour for leak testing of AHU unit cooling/heating coil of AC Plant after pumping down the complete system, isolating the cooling coil from both ends and charging the dry nitrogen gas for pressure leak test, after detecting leak point, release the nitrogen gas, repairing the leak point by means of soldering/brazing and connecting the cooling coil with system, vaccumised the complete system and re-charge the system byrefrigerant, testing and commissioning upto satisfactory cooling performance of the plant complete all as specified and as directed by Engr-in-Charge. |
| 19 | Material and labour for replacement of unserviceable Humidistat including electrical connection complete all as specified and directed by Engr-in-charge. |
| 20 | Material and labour for replacement of unserviceable heater strip type 3kW capacity as per existing size complete all as specified and directed by Engr-in-charge. |
| 21 | Material and labour for replacement of unserviceable heater2/3kW capacity for pan type humidifier and hot water generator as per existing size & model complete all as specified and directed by Engr-in-charge. |
| 22 | Material and labour for servicing ofpan type humidifier floor mounted/ installed at duct of capacity 6 /12 kW including cleaning of tank, checking of all inlet & outlet connection, checking and repair of all electrical controlconnectionsand making the pan type humidifier functional including replacement of minor parts required at site complete all as specified and directed by Engr-in-charge. |
| 23 | Taking down defective compressor sealed unit 13 TR (Approx) capacity,make Danfoss model No SM185S4RC , 3 phase 415 volt of central type AC Plant after disconnecting all electrical connections and replaced the same with new compressor of same capacity and compatiblewithexisitng system,including flushing the old gas, nitogen leak test and rechanging with appropriate quantity of refrigerant gas complete all as specified and as directedandtesting to the satisfaction of Engr in Charge. |
| 24 | Taking down defective compressor sealed unit 12 TR (approx) capacity,make Danfoss model No SZ185S4RC , 3 phase 415 volt of central type AC Plant after disconnecting all electrical connections and replaced the same with new compressor of same capacity and compatiblewithexisitng system,including flushing the old gas, nitogen leak test and rechanging with appropriate quantity of refrigerant gas complete all as specified and as directed andtesting to the satisfaction of Engr in Charge. |
| 25 | Taking down defective compressor sealed unit 13.5 TRcapacity,make Daikin model No JT355DJ-Y1 , 3 phase 415 volt of central type AC Plant after disconnecting all electrical connections and replaced the same with new compressor of same capacity and compatiblewithexisitng system,including flushing the old gas, nitogen leak test and rechanging with appropriate quantity of refrigerant gas complete all as specified and as directed andtesting to the satisfaction of Engr in Charge. |
| 26 | Taking down defective compressor sealed unit 13TR (approx) capacity,make Danfoss model No SZ185S4RC , 3 phase 415 volt of central type AC Plant after disconnecting all electrical connections and replaced the same with new compressor of same capacity and compatiblewithexisitng system,including flushing the old gas, nitogen leak test and rechanging with appropriate quantity of refrigerant gas complete all as specified and as directed andtesting to the satisfaction of Engr in Charge. |
| 27 | Taking down defective compressor sealed unit 11TR (approx) capacity,make Danfoss model No SZ147A4ALB , 3 phase 415 volt of central type AC Plant after disconnecting all electrical connections and replaced the same with new compressor of same capacity and compatiblewithexisitng system,including flushing the old gas, nitogen leak test and rechanging with appropriate quantity of refrigerant gas complete all as specified and as directed andtesting to the satisfaction of Engr in Charge. |
| 28 | Taking down defective compressor sealed unit 4.5TR (approx) capacity,make Copeland model No ZR57KS-TFD-522 , 3 phase 415 volt of central type AC Plant after disconnecting all electrical connections and replaced the same with new compressor of same capacity and compatiblewithexisitng system,including flushing the old gas, nitogen leak test and rechanging with appropriate quantity of refrigerant gas complete all as specified and as directed andtesting to the satisfaction of Engr in Charge. |
| 29 | Taking down defective compressor sealed unit 5.5TR (approx) capacity, , 3 phase 415 volt of central type AC Plant after disconnecting all electrical connections and replaced the same with new compressor of same capacity and compatiblewithexisitng system,including flushing the old gas, nitogen leak test and rechanging with appropriate quantity of refrigerant gas complete all as specified and as directed andtesting to the satisfaction of Engr in Charge. |
| 30 | Taking down defective compressor sealed unit 4.5TR (approx) capacity,makeSANYO Model No C-SB453H8A, 3 phase 415 volt of central type AC Plant after disconnecting all electrical connections and replaced the same with new compressor of same capacity and compatiblewithexisitng system,including flushing the old gas, nitogen leak test and rechanging with appropriate quantity of refrigerant gas complete all as specified and as directed andtesting to the satisfaction of Engr in Charge. |
| 31 | Material and labour for Servicing of AHU complete of various capacities including cooling coil,heating coil, filters, removing dirt, scales etc with cleaning chemicals (coil cleaner) complete all as specified and as directed by Engr-in-Charge. |
| 32 | Material and labourfor Servicing ofblower indoor unit of package/ductable type AC Plant of capacity of each unit4.5TR to 22 TRwith solvent material by using pressure water pump, servicing fan motor complete and painting with one coats of enamel paint on outer body complete all as specified and directed by Engr-in-Charge. |
| 33 | Material and labour for Servicing of condensor unit including cleaning of condensor coil with and fins with solvent material by using pressure water pump, servicing fan motor complete and painting with one coats of enamel paint on outer body complete all as specified and directed by Engr-in-Charge. |
| 34 | Pressure testing / leak arresting, vaccuming with dry nitrogen gas at the maximum pressure of 300 to 400 PSI / oil charging, including replacing the unserviceable strainersall as required and testing complete for the Package /ductable type AC Plant of capacity of each unit4.5TR to 22 TR at any location/ building oftech area and complete all as specified and directed by Engr - in charge.Note :-(iI) Refregerant Gas R-22/407/410/403 will be measured and paid seperately under suply only items. (ii) The Nitrigen gas pressure should be not less then 350 PSI during Leak arresting of the plants and it will hold the same pressure upto 24 hoursand vaccum pressure should not be less then (-30 micron Pressure) during the Vaccumingof plants. |
| 35 | Supplyonlyrefrigerant mafron Gas M-22 in company sealed cylinder complete all as specified and directed by Engr-in-Charge. |
| 36 | Supplyonlyrefrigerant gas R-407C in company sealed cylinder complete all as specified and directed by Engr-in-Charge. |
| 37 | SupplyonlyNitrogen gas in company sealed cylinder complete all as specified and directed by Engr-in-Charge.Note for Sl. Item No.35-37 :-(i) The empty cylinder shall be returned to contractor for further return to campany after consumption of Gas. |
| 38 | Material and labour for Servicing of electric control panel/ compressure control pannel board by taking out the burnt wire. Supply & fixing new wire of existing specification with clipping and socketing and dressing properly complete all as specified and directed by Engr-in-Charge. |
| 39 | Material and labour for Insulation of MS Pipe with Nitrile Rubber sheet of 19mm complete for size 32 mm dia MS pipe complete all as specified and directed by Engr-in-Charge. |
| 40 | Supply and fixing in replacement of rotational moulded polyethene PVC tank 3 layered of capacity 2000 ltrs for use as makeup water tank for cooling Tower (cylinderical vertical with closed top) hoisted and fixed in position of made on iron frame / fabricated works andincluding all fitting complete all as specified and directed at site by Engr-in-Charge. |
| 41 | Supply and fixing in replacement of rotational moulded polyethene PVC Expansion water tank of capacity 3 layered, 500 ltrs for use as makeup water tank for chilled water (cylinderical vertical with closed top) hoisted and fixed in position of made on iron frame / fabricated works with and including all fitting complete all as specified and directed at site by Engr-in-Charge. |
| 42 | Supply and fixing in replacement of entering water temperature (EWT) sensor as per existing model & make complete all as specified and as directed by Engr-in-Charge. |
| 43 | Supply and fixing in replacement ofleaving water temperature (LWT) sensor as per existing model & make complete all as specified and as directed by Engr-in-Charge. |
| 44 | Supply and fixing of PVC fills of size (450x300x150mm), sutaible for any type of cooling tower of central air conditioning plant complete all as specified and directed by Engineer-in-Charge. |
| 45 | Material and labour for Repair/Servicing of electric hot water generatorof capacity 25 TR to 60 TR andreplacement of defected parts & rewiring ofgenerators by proper connection using thimble, connector and replacement of unserviceable accessories refixing the all items complete all as specified and directed by Engineer-in-Charge.Note :- (i) The quoted rate shall be deemed to include for the cost of minor parts required for making the generators fully functional and only heating element, if required shall be measured and paid separately under respective item. |
| 46 | Supply, fixing and testing of single phase preventer VSP2/VSP1 having auxiliary supply 415 Volts Bi-metal thermal over load relay various ranges starting from 3 Amps to 15 Amps including taking down unserviceable materials complete all as specified and directed by Engr-in-Charge. |
| 47 | Supply and fixing in replacement of electronic timer star Delta, 240-415V timing 3s-120scomplete as per existing make & model complete all as specified and directed by Engr-in-Charge. |
| 48 | Supply and fixing in replacement of, MVPD , range 30-22 Amps ,aux supply230 VAC for AC Plant complete as per existing make & model including taking down unserviceable materials complete all as specified and directed by Engr-in-Charge. |
| 49 | Supply and fixing in replacement ofMicroprocessor controller based operating control board including display, step down transformer & sensor suitable for Model No. WCUR0350MN, Make : Voltasincluding taking down unserviceable materials complete all as specified and directed by Engr-in-Charge. |
| 50 | Supply and fixing in replacement of PCB controller including display, step down transformer & sensor suitable for Model No.- XWC2S-026A, Make- Blue Starincluding taking down unserviceable materials complete all as specified and directed by Engr-in-Charge. |
| 51 | Supply and fixing in replacement of PCB controller including display, step down transformer & sensor suitable for Model No.- DPUAS055Y, Make- Voltas complete all as specified and as directed by Engr-in-Charge. |
| 52 | Supply and fixing in replacement of PCB controller including display, step dowm transformer & sensor suitable for Model No.- DPA 1052R1, Make- Blue Star including taking down unserviceable materials complete all as specified and directed by Engr-in-Charge. |
| 53 | Supply and fixing in replacementof PCB controller including display, step down transformer & sensor suitable for Model No.- WCUS1-015, Make- Blue Star complete all as specified and directed by Engr-in-Charge. |
| 54 | Supply and fixing in replacement of power contactor 4 polefor AC circuit with AC Coils voltage 220-240 Volt including over load relay 16 Ampscomplete as per existing make & model complete all as specified and directed by Engr-in-Charge. |
| 55 | Supply and fixing in replacement of power contactor 3 pole MLI-5for AC circuit with AC Coils voltage 240/250 Volt including over load relay 25 Ampscomplete as per existing make & model complete all as specified and directed by Engr-in-Charge. |
| 56 | Supply and fixing in replacement of power contactor 4 polefor AC circuit with AC Coils voltage 220-240 Volt ,over load relay 32-40 Ampscomplete as per existing make & model complete all as specified and directed by Engr-in-Charge. |
| 57 | Supply and fixing in replacement of safety valve 300 PSI of copper material suitable for 25 TR to 100 TR capacity Central/package type AC Plant (as per existing make and model) including taking down unserviceable materials complete all as specified and directed by Engr-in-Charge. |
| 58 | Supply and fixing in replacement of HP/LP control switch as per existing make and model including taking down unserviceable materials complete all as specified and directed by Engr-in-Charge. |
| 59 | Supply and fixing in replacement of thermometer suitable for chilled and condenser water pipe line complete including taking down unserviceable materials complete all as specified and directed by Engr-in-Charge. |
| 60 | Supply and fixing in replacement of pressure transistor sensor for suction, discharge & oilcomplete allas per existing make and model complete all as specified and directed by Engr-in-Charge. |
| 61 | Supply and fixing in replacement of pressure gauge suitable for chilled and condenser water pipe line complete including taking down unserviceable materials complete all as specified and directed by Engr-in-Charge. |
| 62 | Supply and fixing in repair of cooling tower fan motor of capcity 3HP, 3 Phase, 440 Volts and 50/60 Htz and not less than 960 RPM suitable for any type and made of cooling tower, including all accessories like nuts, bults washer and clamps etc and taking down old unserviceable existing one complete all as specified and directed by Engineer-in Charge. |
| 63 | Supply and fixing in repair of cooling Tower aluminium fan blades 1200 mm dia with coupling hub suitable for existing (set of four blades) existing shape, size and modelsuitable for 3 HP CT fan Motorand upto 70 TR capacity Cooling tower complete all as specified and directed by Engr-in-Charge. |
| 64 | Supply and fixing in replacement AHU filter suitable for AHU of size (610X610X50 mm)as per existing size, make and model complete all as specified and directed by Engr-in-Charge. |
| 65 | Supply and fixing in replacement of AHU filter suitable for AHU of size (305X610X50 mm) as per existing size, make and model complete all as specified and directed by Engr-in-Charge. |
| 66 | Taking out the blower motor including shaft from the AC Plant of capacity 5.0 TR to 22 TR, rewinding, welding and grinding on Lathe to make suitable alignment with bearing and refixing complete all as specified and directed by Engr-in-Charge. |
| 67 | Supply and fixing in replacement of runner of blower drum for package unit of AC Plant of capacity 4.5 TR to 22TRcomplete including taking down unserviceable materials all as specified and directed by Engr-in-Charge. |
| 68 | Supply and fixing in replacement of fan blade suitable for air cooled condensor of AC Plant of capacity 4.5 TRto 22TRincluding taking down unserviceable materials all as specified and directed by Engr-in-Charge. |
| 69 | Supply and fixing in repair of bearing of blower motor suitable for package units of AC Plant of capacity 4.5 TR to 22 TR complete including taking down unserviceable materials all as specified and directed by Engr-in-Charge. |
| 70 | Supply and fixing in replacement of connector 36 to 40 A, 440 Volt TP & TPN complete all as specified and as directed by Engr-in-Charge. |
| 71 | Material and labour for Visit of AC technician having minimum 5 yrs of experience for maintenance and attending complaint including minor repairs and making the plant in serviceable condition of the central type AC Plants of 12.5 TR to 50 TR capacity comprising of all minor parts and machineries including charging of R - 410/407/22 Gas and when ever required repair and maint of compressor and chiller,blower motor,air filters, de-humidifying coils, IT control pannels, PCB, ducts and accessories of all gauges and meters and keeping in perfect working condution all as specified and directed by the Engr-in-charge.Note : Leak test, refrigerantgascompressure /chiller /blower motor /panels and other major spares will be measured and paid separetely under relevant item of schedule if any required.The complaint of non-funtioning of any unit of air conditioner installed at any location must be attended within 24 hrs and the repair work must be completed with 48 hrs failure to this will lead to a recovery of Rs. 500.00 per hrs of delay for 24 hrs incase of failure of technician to and attend the complaints and Rs. 1000.00 per hrs after 48 hrs fordelay in repair leading to unserviceability of the plant. |
| 72 | Maintenance and attending complaint including minor repairs and making in serviceable condition of the package type AC Plants of 4.5 TR to 22 TR capacity comprising of all minor parts and machineries including charging of R - 410/407/22 Gas and whenever required repair and maint of compressor and blower motor,air filters, de-humidifying coils, IT control pannels, PCB, ducts and accessories of all gauges and meters and keeping in perfect working condition all as specified and directed by the Engr-in-charge.Note : Leak test, refrigerantgascompressure /chiller /blower motor /panels and other major spares will be measured and paid separetely under relevant item of schedule if any required.The complaint of non-funtioning of any unit of air conditioner installed at any location must be attended within 24 hrs and the repair work must be completed with 48 hrs failure to this will lead to a recovery of Rs. 500.00 per hrs of delay for 24 hrs incase of failure of technician to and attend the complaints and Rs. 1000.00 per hrs after 48 hrs for delay in repair leading to unserviceability of the plant. |
| 73 | Supply and charging lubricating oil for scroll type compressor with refrigerant R407 Mineral oil 160P complete all as specified and as directed by Engineer-in-Charge. |
| 74 | Supply and charging lubricating oil for scroll type compressor with refrigerant R22 Mineral oil 160P complete all as specified and as directed by Engineer-in-Charge. |
| 75 | Supply and fixing in repair of non returningvalve of 80 mm dia valve PN-10 including gasket, nut bolts complete all as per specified and directed by Engr-in-Charge. |
| 76 | Supply and fixing in repair of butterfly valve of 80 mm dia valve PN-1 0 with handle for manual operation including gasket, nut bolts complete all as per specified and directed by Engr-in-Charge. |
| 77 | Supply and fixing in repair of butterfly valve of 65 mm dia valve PN-1 0 including gasket, nut bolts complete all as per specified and directed by Engr-in-Charge. |
| 78 | Supply and fixing in repair of balancingvalve of 65/80 mm pipe size for balancing of chilled water/ condenser water pipe line dia valve PN-1 0 including gasket, nut bolts complete all as per specified and directed by Engr-in-Charge. |
| 79 | Supply and fixing in repair of water flow switch for connection to chilled & condenser waterpipe line as per existing make & model complete all as per specified and directed by Engr-in-Charge. |
| 80 | Supplying and fixing for sprinkler assembly with branch pipe aluminiumsuitable for FRP cooling tower capacity 25TR to 60TR including taking down existing complete all as specified and directed by Engineer-in-Charge. |
| 81 | Supply and fixing in repair of digital clock temperature & humidity measurer complete all as specified and directed by Engineer-in-Charge. |
| 82 | Supply and fixing in repair of LEDindication Lamps for R,Y,B Phase in LT panel boards/ feeder pillar boxes including disconnecting and removing existing defective item from electric circuit including necessary connected fastners, burnt cables,accessories etc.all as per site requirement/existing make/model complete all as specified and directed by Engr-in-Charge. |
| 83 | Supply and fixing in repair of Push button switches (Red and Green, in Colour) in LT panel boards / feeder pillar boxes including disconnecting and removing existing defective item from electric circuit including necessary connected fastners, burnt cables,accessories etc.all as per site requirement/existing make/model complete all as specified and directed by Engr-in-Charge. |
| 84 | Supply and fixing in repair of Selector Switch 3 way ON-OFF 415V in LT panel boards / feeder pillar boxes including disconnecting and removing existing defective item from electric circuit including necessary connected fastners, burnt cables, accessories etc all as per site requirement/existing make/model complete all as specified and directed by Engr-in-Charge. |
| 85 | Supply and fixing in repair ofAmmemeter analog type rangeabove 100A below 300A in LT panel boards/ feeder pillar boxes including disconnecting and removing existing defective item from electric circuit including necessary connected fastners, burnt cables, accessories etc all as per siterequirement/ existing make/model complete all as specified and directed by Engr-in-Charge. |
| 86 | Supply and fixing in repair of Voltmeter Analog type rangeupto 600Voltsin LT panel boards/ feeder pillar boxes including disconnecting and removing existing defective item from electric circuit including necessary connected fastners, burnt cables, accessories etc all as per site requirement/existing make/model complete all as specified and directed by Engr-in-Charge. |
| 87 | Supply and fixing in repair ofCoil sensorfor package type C plant of 4.5/ 8.5/ 5.5/ 22 TR Capacity,(suitable for Blue Star/ Voltas make) , complet all as specified and directed by Engr-in-Charge. |
| 88 | Supply andfixing in repair 4 Core 10 Sqmm multistrand copper conductor PVC insulated sheathed flexible cable suitable for connection of package/centraltype AC Plant complete all as specified and directed by Engineer-in-Charge. |
| 89 | Supply andfixing in repair 4 Core 6 Sqmm multistrand copper conductor PVC insulated sheathed flexible cable suitable for connection of package/centraltype AC Plant complete all as specified and directed by Engineer-in-Charge. |
| 90 | Supply andfixing in repair of MCB TPN 63 Ampsfor connection of package/centraltype AC Plant as main incommer outgoing complete all as specified and directed by Engineer-in-Charge. |
| 91 | Supply and fixing of V beltas perexistingsize & model complete all as specified and directed by Engr-in-Charge. |
| 92 | Material and labour for replacement of unserviceable canvas cloths heavy dutyof package/central type AC Plants including provision of zip 150 mm lenth for opening and closing arrangements and properly fasterners with bolts and nuts between the ducts and dumpers of the plants complete all as specified and directed by the Engr-in-Charge. |
| 93 | Supply and fixing in replacement of solonoid valve, capacity 12.5 TR to 21 TR as per existing size & model complete all as specified and as directed by Engr-in-Charge. |
| 94 | Supply and fixing in replacement of solonoid valve, capacity 24 TR to 60TR as per existing size & model complete all as specified and as directed by Engr-in-Charge. |
| 95 | Supply and fixing in replacement of expansion valve suitable for 12.5 TR to 21 TR as per existing size & model tonne capacity complete all as specified and as directed by Engr-in-Charge. |
| 96 | Supply and fixing in replacement of expansion valve suitable for 24 TR to 50TR as per existing size & model capacity complete all as specified and as directed by Engr-in-Charge. |
| 97 | Supply and fixing in replacement of MCCB 63A 4pole 25KA with Adjustable thermal & fixed magnetic setting Ics =100% of Icu.complete all as specified and directed by Engr-in-Charge. |
| 98 | Supply and fixing in replacement of MCCB 100A 4pole 25KA with Adjustable thermal & fixed magnetic setting Ics =100% of Icu.complete all as specified and directed by Engr-in-Charge. |
| 99 | Supply and fixing in replacement of MCCB 160 A 4pole 25KA with Adjustable thermal & fixed magnetic setting Ics =100% of Icu.complete all as specified and directed by Engr-in-Charge. |
| 100 | Supply and fixing in replacement of MCCB 200 A 4pole 25KA with Adjustable thermal & fixed magnetic setting Ics =100% of Icu.complete all as specified and directed by Engr-in-Charge. |
| 101 | Supply and fixing in replacement of MCCB 250 A 4pole36 KA with Adjustable thermal & fixed magnetic setting Ics =100% of Icu.complete all as specified and directed by Engr-in-Charge. |
| 102 | Supply and fixing in replacement of MCCB 315 A/320 A 4pole 36KA with Adjustable thermal & fixed magnetic setting Ics =100% of Icu.complete all as specified and directed by Engr-in-Charge. |
| 103 | Supply and fixing in replacment of of 22 TR HMI Scroll Chiller display including controller, step down transformer & sensor suitable for Model Make- Voltas complete all as specified and as directed by Engr-in-Charge. |
| 104 | Material and labour for carrying out Servicing of 62 HP VRF type AC plant with04 Nosouter Unit and 22 Nos indoor unit MakeVoltas complete Suchascarryingoutroutineinspection, Service, cleaning ofAC plant, Checking ofmotorBushes , Cleaningof Condensor fan, AirFilter , evaporator andcondensor Coil, checking ofall control wiring,Displaypanelandmakeall setting as persite requriement completeto the satisfaction ofEngr in Charge |
| 105 | Material and labour for carrying out Servicing of 11 TR AC (2x5.5 TR ) DuctableSplit ACtype AC plant with02 Nosouter Unit and 2 Nos indoor unit MakeVoltas complete Suchascarryingoutroutineinspection, Service, cleaning ofAC , Checking ofmotorBushes , Cleaningof Condensor fan, AirFilter , evaporator andcondensor Coil, checking ofall control wiring,Displaypanelandmakeall setting as persite requriement to the satisfaction ofEngr in Charge |
| 106 | Maintenance and attending complaint including minor repairs and making VRF type AC Plants 62 HP capacity serviceable comprising of all minor parts . major componentsrequired shall bemeasuredandpaidseparately.The complaint of non-funtioning of any unit of air conditioner installed at any location must be attended within 24 hrs and the repair work must be completed with 48 hrs failure to this will lead to a recovery of Rs. 500.00 per hrs of delay for 24 hrs incase of failure of technician to and attend the complaints and Rs. 1000.00 per hrs after 48 hrs for delay in repair leading to unserviceability of the plant. |
| 107 | Taking down carefully burnt out electric driven blower motor ofVRFPlant out doorunit anycapacityafter disconnecting main electric supply,dismantling motor carefully for checking, removing to workshop for repairing, taking out burnt, coils from the slots of stator, other accessories such as ball bearing, rotor, cleaning the stator slots and rewinding the same with new super enamelled copper winding wire, heating, varnishing, re-assembling the same after greasing the ball bearing motor refixingto original position after repairing from workshop, reinstallation on existing channel and reconnecting to electric supply, commissioning and testing complete all as specified and as directed by Engr-in-Charge. |
| 108 | Taking down carefully burnt out electric driven blower motor ofVRFPlant indoor doorunit anycapacityafter disconnecting main electric supply,dismantling motor carefully for checking, removing to workshop for repairing, taking out burnt, coils from the slots of stator, other accessories such as ball bearing, rotor, cleaning the stator slots and rewinding the same with new super enamelled copper winding wire, heating, varnishing, re-assembling the same after greasing the ball bearing motor refixingto original position after repairing from workshop, reinstallation on existing channel and reconnecting to electric supply, commissioning and testing complete all as specified and as directed by Engr-in-Charge. |
| 109 | M&L for Pressure testing / leak arresting , vaccuming with dry nitrogen gas at the maximum pressure of 300 to 400 PSI/ oil charging, including replacing the unserviceable strainersall as required andtesting complete for VRF ACPlant 62 HP all as specified and directed by Engr- in-charge .Note :-(i) Refregerant Gas 410 and strainers will be measured and paid seperately under suply only items. (ii) The Nitrigen gas pressure should be not less then 350 PSI during Leak arresting of the plants and it will hold the same pressure upto 24 hoursand vaccum pressure should not be less then (-30 micron Pressure) during the Vaccumingof plants. |
| 110 | M&L for taking down defective compressorDC inverter V4 plus-K Series sealed unit, 3 phase 415 volt of central type AC Plant after disconnecting all electrical connections and replaced the same with new compressor of same capacity and compatiblewithexisitng system,including flushing the old gas, nitogen leak test and rechanging with appropriate quantity of refrigerant gas complete all as specified and as directedandtesting to the satisfaction of Engr in Charge. |
| 111 | M&L for taking down defective compressormakeHitachi ModelNo E655DHD-65D2YD, 3 phase 415 volt of central type AC Plant after disconnecting all electrical connections and replaced the same with new compressor of same capacity and compatiblewithexisitng system,including flushing the old gas, nitogen leak test and rechanging with appropriate quantity of refrigerant gas complete all as specified and as directedandtesting to the satisfaction of Engr in Charge. |
| 112 | M&L for taking down defective Suction AcumulatorMakeDQModelNoQYFLQ-43VB , 3 phase 415 volt of central type AC Plant after disconnecting all electrical connections and replaced the same suction acumulator compatiblewithexisitng system,including flushing the old gas, nitogen leak test and rechanging with appropriate quantity of refrigerant gas complete all as specified and as directedandtesting to the satisfaction of Engr in Charge. |
| 113 | Supplyonlyrefrigerant gas R-410Ain company sealed cylinder complete all as specified and directed by Engr-in-Charge. |
| 114 | Supplyonlyrefrigerant gas R-407Cin company sealed cylinder complete all as specified and directed. |
| 115 | SupplyonlyNitrogen gas in company sealed cylinder complete all as specified and directed. Note for Sl. Item No.10-12 :-(i) The empty cylinder shall be returned to contractor for further return to campany after consumption of Gas.. |
| 116 | Supply and fixing in replacement of all PCBcardsuitablefor 62 TR VRF PlantMake-Voltasincluding taking down unserviceable materialsmaking the plant operational complete all as specified and directed.Note: The payment forcardshall bemade only postsuccessfultestingofsamein PresenceofEngr In Charge |
| 117 | Supply and fixing in replacement of MCCB 160 A 4pole 25KA with Adjustable thermal & fixed magnetic setting Ics =100% of Icu.complete all as specified and directed by Engr-in-Charge. |
| 118 | Supply and fixing in replacement of MCCB 200 A 4pole 25KA with Adjustable thermal & fixed magnetic setting Ics =100% of Icu.complete all as specified and directed by Engr-in-Charge. |
| 119 | Supply and fixing in replacement of MCCB 250 A 4pole36 KA with Adjustable thermal & fixed magnetic setting Ics =100% of Icu.complete all as specified and directed by Engr-in-Charge. |
| 120 | Supply and fixing in replacement of fan blade suitable for air cooled condensor of AC of capacity 5.5 TR including taking down unserviceable materials all as specified and directed by Engr-in-Charge. |
| 121 | Supply and fixing in repair of bearing of blower motor suitable for ACof capacity 5.5 TR complete including taking down unserviceable materials all as specified and directed by Engr-in-Charge. |
| 122 | Taking down defective compressor sealed unit 5.5TR (approx) capacity, , 3 phase 415 volt of central type AC Plant after disconnecting all electrical connections and replaced the same with new compressor of same capacity and compatiblewithexisitng system,including flushing the old gas, nitogen leak test and rechanging with appropriate quantity of refrigerant gas complete all as specified and as directed andtesting to the satisfaction of Engr in Charge. |
| 123 | Supply and fixing in replacement of all PCBcardsuitablefor5.5 TRDuctableSplitACMake-Voltasincluding taking down unserviceable materialsmaking the plant operational complete all as specified and directed.Note: The payment forcardshall bemade only postsuccessfultestingofsamein PresenceofEngr In Charge |
| SR No | FileName | File Description |
| 1 | Click here to download tender document | Tender Documents |
| 2 | Click here to download tender document | Tender Documents |
| 3 | Click here to download tender document | Tender Documents |
| 4 | Click here to download tender document | Tender Documents |
Copyright © 2026 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail