|
| 1 | Dismantling precast concrete or stone slabs in walls, partition walls etc. including stacking within 50 meters lead: Thickness upto 40 mm |
| 2 | Providing and Laying of Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc. complete. 50 mm thick with 20mm nominal size stone aggregate. |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) |
| 4 | Dismantling old plaster or skirting, raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 meters lead. |
| 5 | Providing and Applying of 15mm Cement plaster on the rough side of single or half brick wall of mix: 1 : 6 ( 1 cement : 6 fine sand) |
| 6 | Providing and applying of 2mm thick white cement based putty of specified thickness, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete. |
| 7 | Finishing walls with water proofing cement paint of required shade on New work (two or more coats applied @ 3.84 kg/10sqm) |
| 8 | Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade on New work (two or more coats) over and including priming coat with water thinnable cement primer |
| 9 | Providing and fixing of 35mm thick Imported KD panelled or panelled and glazed shutters for doors, windows and clerestory windows including ISI marked M.S pressed Butt hinges bright finished of required size with necessary screws and other allied fittings/ fixtures complete as per the directions of Incharge Engineer. |
| 10 | Providing and Fixing of Decorative ply wood both side decorative veneer (Type-1) conforming to IS:1328 BWR type for door shutters including all necessary fittings/ fixtures complete as per the directions of Incharge Engineer. |
| 11 | Applying priming coat: With ready mixed pink or grey primer of approved brand and manufacture on wood work (hard and soft wood) |
| 12 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade. Two or more coats on new work |
| 13 | Providing and fixing of hardware items of ISI marked of standard quality and make including all necessary fittings/ fixtures complete as per the directions of Incharge Engineer. |
| 14 | Handles 150mm |
| 15 | Handles 100mm |
| 16 | Concealed Locks with locking arrangements. |
| 17 | Tower Bolts 150mm |
| 18 | Tower Bolts 100mm |
| 19 | Providing and fixing of Heavy duty glass panes 3.5mm thick instead of ordinary glass panes 13.75kg/sqm in doors, windows and clerestory windows shutters (Area of opening for glass panes excluding portion inside shall be measured) including cost of beading nails complete as per the directions of Incharge Engineer. |
| 20 | Providing and fixing of 8mm thick ply wood in room ceiling including supporting structure 2\"x2\" and 50x50mm wooden cornice at corners and wherever required, beadings, nails complete as per the directions of Incharge Engineer. |
| 21 | Providing and fixing of 4mm thick Teak ply wood decorative one side over planks on ceiling, including supporting structure 2\"x2\" and 50mmx50mm wooden cornice at corners and wherever required with necessary beadings, nails and other carriages complete as per the directions of Incharge Engineer. |
| 22 | Dismantling of damaged ply ceiling including stacke of serviceable materials and disposal of unserviceable materials as per the directions of Incharge Engineer. |
| 23 | Providing and fxing of Imported KD Wood in rooms, chejja including all necessary fittings/ fixtures and carriages upto site of work complete as per the directions of Incharge Engineer. |
| 24 | Providing and fixing of CGI sheets in chejja and soffits of standard quality, including cost of supporting structure of imported kail wood 2\"x2\", nails and other fittings/ fixtures complete as per the directions of Incharge Engieer. |
| 25 | Carriage of materials from approved source by MT. |
| 26 | Stone aggregate for an average lead of 10Kms |
| 27 | Sand for an average lead of 10Kms. |
| 28 | Carriage of materials by headload. |
| 29 | Stone aggregate for an average lead of 1000meters. |
| 30 | Sand for an average lead of 1000meters. Please Enable Macros to View BoQ information |