| 1 | A- SITC Part |
| 2 | Upgradation of existing MX-one TSW/MD110 to server Media Gateway based MX-One Latest Version 7.Xincluding following:- |
| 3 | a) SITC of Server Mitel ASU-II-02 Nosb) SITC of Media gate Way Unit- 03 Nosc) Replacement of existing 29 Nos. Analog extension cards by 72 port Analog Extension Gateway-13 Nos.d) Replacement of Digital Extension Cards-02 Nose) Software Upgradation to Latest Version7.xf) Simplified Licensing Approachg) Mitel Software Assurance-one Yearh) Free Hot fixes, software patches for one yeari) Mitel L3 Technical support for 1 yearj) Support for Variety of IP Phonesk) Support for Videoof IP Phonesl) Supports Cloud telephonym) Support Mobile phone as EPABX extensionn) Support for UCC Application-Mitel Micollab |
| 4 | Supply,laying, Testing and commissioning of6 core fiber armoured single modeOptic (OFC)Armoured cable in the40mm diameterHDPE pipe complete with fitting and cutting, jointing etc.direct in ground (45 cm below ground level) includingmechanical splicingof fiber cable ,excavation and refilling the trench but excluding sand cushioning and protective covering etc., complete as required. |
| 5 | Supply,laying, Testing and commissioning of6 core fiber armoured single modeOptic (OFC)Armoured cable in the40mm diameterHDPE pipe complete with fitting and cutting, jointing etc.on open/surfacecomplete as required. |
| 6 | SITC of 6 core Loaded LIU with Aluminum base material for light mounting , front mounted cable saddles for jumper management , can manage both splices and terminations, removable front and rear covers for better access to interrior ofLIUcomplete as required |
| 7 | SITC of 8 Port Poe witch with SFP ( support for IEEE 802.3at/af power over Ethernet(POE)complete as required. |
| 8 | SITC of Fiber Patch cord (the terminated connectors in assemblies are desingedto and are compatible with industries standards, high precision ceramic ferrule with good concentricity)complete as required. |
| 9 | SITC of fiber pigtails(to connect fiber optic cables using mechanical or fusion splicing with one end having factory -installed connector while the other end is unterminated) complete as required |
| 10 | Excavation of the cable trenches in hard rock not exceeding 1.5 meter in width, and lift upto 1.5 meter, including getting out the excavated soil and disposal of excavated soil as directed within a lead of 50 meter. |
| 11 | B- Maintenance Part (After Warranty/Defect Liability period) |
| 12 | Comprenensive Annual Maintanance ofMITEL MX one EPABX system installed in Admin Block(LIM-1), SLS building (LIM-2), CS Building (LIM-3) &SPS Building (LIM-4) including all hardware, software, server media,MDF,Patchcords, & other accessories connected with the upgraded EPABX sytemexcluding of consumable parts such as cabling, wiring UPS Batteries etc. |