|
| 1 | Dismantling cement conglomerate floors 25mm to 50mm thick without concrete base |
| 2 | Kota stone slab 20-25 mm thick flooring over 20 mm (average) thick base laid over and jointed with grey cement slurry mixed with pigment to match the shade of the slab including rubbing and polishing complete with base of cement mortar 1 : 4 (1 cement : 4 coarse sand) : |
| 3 | Kotah stone at labour rate |
| 4 | 20mm thick cement plaster 1:4 in two coat work |
| 5 | Scraping of white wash or color wash |
| 6 | Preparation of plastered or concrete surface for painting (including sand papering the surface) using ready mixed cement based wall putty by applying two or more coats to get required finish |
| 7 | Wall paintingwith plastic emulsion paint of approved brand and manufacturer to givean even shade (two or more coats) |
| 8 | Painting two or more coats Italian Pigmented PU white glossy or matt in all shades on wood work surface to give an even shade Including |
| 9 | Providing and fixing double scaffolding system (cup lock type) on the exterior side,upto seven story height made with 40mm dia M.S. tube 1.5mcentre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S.clamps and M.S. staircase system in the scaffolding for working plat formetc.and maintaining it in a serviceable condition for the required duration as approved and removing it thereafter .The scaf folding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required locations with essential safety features for the workmen etc. complete as per directions and approval of Engineerin charge .The elevational area of the scaffolding shall be measured for payment purpose .The payment will be made once irrespective of duration of scaffolding. Note:- This item to be used for maintenance work judicially, necessary deduction |
| 10 | Providing and applying Anti Termite Treatment using post constructional chemical treatment measuresasper IS- 6313- 2001(Part 3)& using Chemical containg chloropyrifos systemic insecticide diluted to manufacturer\"s specifications by drilling holes in the floor slab& along skirting 300mm apart &12mm dia,drilling holes along all possible entry points such as junctionsof floor and walls,door frames,sewage lines,entry points,etc .& injecting them with the chemical solution |
| 11 | Providing and fixing of floor mat of construction level loop plain Polypropylene solution Dye of 5mm thickness of weighjt 3350 gsm with bitumen +Felt of size 50x50 cm |
| 12 | Providing and fixing ply wood, plain lining, butt jointed including PVC Plug placed at 45 cm to 65 cm centers complete with necessary nails (Frame work shall be payable extra12mm thick decorative wood withteak faced on one side |
| 13 | Providingand fixingcommercial plywood 18mm thick |
| 14 | Providing and fixing of Glass at circular part of balcony |
| 15 | Providing & fixing ACP Sheets of various thickness High Class ISI marked complete in all respect as per the directions of Engineer-in-charge |
| 16 | Providing & fixing 16 gauge stainless steel pipe railing of grade 304 duly fixed on steps with the help of bolts grouted on steps with hand rail and newel post of 50mm dia Stainless steel pipe,Balusters of 40mm dia Stainless steel pipe and guard 3 Nos of 15mm dia Stainless Steel pipe complete in all respect |
| 17 | Providing and fixing of charcoal louvers |
| 18 | Rate of pillers |
| 19 | Providing & fixing teak wood top size 150mm x 75mm on stair railing including polishing complete in all respect. |
| 20 | Wrought iron & Mild steel ladders, framed grills, gratings etc. with ends of bars riveted or molded forged framed window guards, barred iron doors stair case iron railing etc. including cost of bolts and nuts, screws, welding rod complete fixing in position |
| 21 | Providing and fixing precoated galvanised iron profile sheets (size, shape and pitch of corrugation as approved by Engineer-in-charge) total coated thickness with zinc coating 120 grams per sqm as per IS: 277, in 240 mpa steel grade, 5 7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns. Sheet should have protective guard film of 25 microns minimum to avoid scratches during transportation and should be supplied in single length upto 12 metre or as desired by Engineer-in-charge. The sheet shall be fixed using self drilling /self tapping screws of size (5.5x 55 mm) with EPDM seal, complete upto any pitch in horizontal/ vertical or curved surfaces, excluding the cost of purlins, rafters and trusses and including cutting to sizeand shape wherever required |
| 22 | Dismantling asbestos cement celotax or other hard board ceiling or partition walls including supporting timber |
| 23 | Providing and fixing of Acustic Material in Balcony Back side Please Enable Macros to View BoQ information |