| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil |
| 2 | Fly ash Brick work with clay flyash F.P.S. (non modular) brick of class designation 7.5 in foundation and plinth in : CM 1:6 (1 cement : 6course sand). |
| 3 | Fly ash Brick work with clay flyash F.P.S. (non modular) brick of class designation 7.5 in superstructure in : CM 1:6 (1 cement : 6course sand). |
| 4 | half flyash brick work in super structure with cm (1:4) |
| 5 | P&L 25mm thick CC flooring(1:2:4) |
| 6 | 12 mm cement plaster of mix : 1:6 (1 cement: 6 fine sand) |
| 7 | 6 mm cement plaster of mix :1:3 (1 cement : 3 fine sand) |
| 8 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge Nominal concrete 1:4:8 or leaner mix (i/c equivalent design mix) |
| 9 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction ofEngineer-in-charge.In lime mortar |
| 10 | Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead. |
| 11 | Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead : Of area 3 sq. metres and below |
| 12 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. |
| 13 | Distempering with 1st quality acrylic distember (Ready mix) having VOC content less than 50 grams/ litre of approved brand and manufacture to give an even shade : Old work (one or more coats) |
| 14 | Finishing walls with water proofing cement paint of required shade : Old work (one or more coats @ 2.20 kg/10 sqm) complete. |
| 15 | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade : One or more coats on old work |
| 16 | Removing dry or oil bound distemper, water proofing cement paint and the like by scrapping, sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete. |
| 17 | Total impact of GST for the purpose of CTC Please Enable Macros to View BoQ information |