Name of Work:Improvements to the tail end bed dam of Thalatheru at Kilinjalmedu village in Karaikal
Sl. No.
Item Description
1
Demolishing R.C.C work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer-incharge.
2
Centering and shuttering including strutting , propping etc and removal of form for - Suspended floors , roofs , landings , balconies and access platform
3
Reinforced cement concrete work in beams, suspended floors , roofs having slope up to 15degree landings , balconies , shelves chajjas , lintels , bands , plain window sills , staircases andspiral stair cases above plinth level up to floor five level excluding the cost of centering ,shuttering, finishing and reinforcement , with 1:1.5:3 (1 cement : 1.5 fine aggregate : 3 graded stone aggregate 20mm nominal size)
4
Steel reinforcement for R.C.C.work including straightening , cutting , bending , placing in position and binding all complete above plinth level -Thermo - Mechanically Treated bars Fe - 500D or more
5
Smooth finishing of the exposed surface of RCC work with 6mm thick cement mortar 1:3 (1 cement : 3 fine aggregate)
6
Providing , mixing and applying SBR polymer (of approved make ) modified Cement mortar in proportion of 1:4 (1 cement 4 graded fine aggregate with polymer minimum 2% by wt.of cement used)as per specifications and directions of Engineerin- charge.Note: Measurement and Payment : The Premeaurement of thickness shall be done just after the surface preparation is completed and payment under this item shall be made only after proper wet curing has been done and surface has been satisfactorily evaluated by sounding / tapping with a blunt metal instrument and / or the 75mm size cube crusing strength at the end of 28 days to be not less than 30 N / Sqmm) - 12mm average thickness
7
Finishing walls with acrylic smooth exterior paint of required shade - New work (two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 0.90 litre / 10 sqm
8
Painting wood work with deluxe multi surface paint of required shade. Two or more coat applied @0.90 ltr / 10sqm over an under coat of primer applied @ 0.75 ltr / 10 sqm of approved brand and manufacure
9
Hire charges of JCB - The rate includes hire charges of machinary, tools and plants, labour, fuel and operator charges etc, complete as directed by the engineer in - charge
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.