| 1 | Demolition of cement concrete (unreinforced) of any descriptions, Roofs, floors (other than ground floors), beams, staircases, landing, chajjas and similar suspended work complete all as specified anddirected. |
| 2 | M&L for Removing excavated material exc. 500 m but n exc.1.5km and depositing where directed complete all as specified. |
| 3 | Providing and laying PCC padding over the roof slab in cement concerete type B1, 1:2:4 (20mm draded aggregate) in proper slope for drain out the rain water (40mm thick crown and 25mm thick on edges) complete all as specified and directed. |
| 4 | M&L for APP based polymeric membrane minimum weighing 3kg/sqm and minimum 3mm thick reinforced with polyster non wove fabric (wt. not less than 150 gms/sqm) laid on primed surface by forced application complete all as specified and directed. |
| 5 | Supply only bitumen primer for use in waterproofing and damp-proofing treatments complete all as specified and as directed. |
| 6 | M&L for applying evenly a tack coat of in dustrial bitumen 85/25 at the rate of 1.2 kg per sq.m including on the sealed joint of APP membrane and cleaning surfaces complete all as specified directed complete all as specified. |
| 7 | M&L for complete waterproofing treatment to roof surface/parapet/ terrace using Asian Paints smartcare system (Hydroloc xtreme/ Terrace shield/ Damp Proof Ultra or approved equivalent)/ Dr. Fixit (roofseal classic/roofseal select)/ Berger paint consisting of the following operations:(a) Preparation of roof surface including removal of existing bitumen coating, APP membrane completely, cement concrete (if required) laitance, dust, grease, algae/fungus by using intense wire brushing or high speed water jet for thorough cleaning.(b) Filling of visible cracks/opening with smartcare crack seal. Bigger cracks, damaged portions and hollow areas must be repaired with polymer modified cement mortar.(c) Applying primer coat (Smartcare epoxy primer/damp proof primer) @ 0.92 Sqm/ltr using roller. (d) Applying two or more coats of smartcare waterproofing system (Damp proof ultra/hydroloc xtreme/terrace shield) with reinforcement mesh at roof surfces/corners/junctions, achieving minimum total dry film thickness 1.5mm.(e) Providing protective top coat of solar reflective smartcare sunshield, complete all as specified and as directed by Engr-in-Charege.Note:- Rate include for \"Taking down existing water tank from existing staging carefully and refixing the water tank in original position after waterproofing treatment including necessary fixing arrangement as required\" and the work will be done only by an authorized applicator of OEM for which the contractor will submit the documents of applicator to Engineer in Charge. |
| 8 | Supply only integral water proofing compound complete all as specified. |
| 9 | Taking down eaves gutters and rainwater pipes (any size or pattern), including all fittings,heads, shoes, bends, swan-necks,etc., including cleaning or refixing or removal to Store (measured overall as fixed along the centre line over fittings and accessories) complete all as specified. |
| 10 | S&F 110mm bore PVC(SWR) pipes single socketed in any length with rubber ring joints fixed to walls, complete all as specified. |
| 11 | S&F 110mm bore PVC(SWR) bends any radius, complete all as specified. |
| 12 | Disconnecting existing water tanks exc 250 & n.exc 500 Ltr capacity, setting aside (or lowering if required ) and cleaning and removing all scale and dirt etcfrom tanks and from mouths of circulating pipes and reconnecting and re-fixing in position, complete all as specified and directed. |
| 13 | Disconnecting existing water tanks exc 500 & n.exc 1000 Ltr capacity, setting aside (or lowering if required ) and cleaning and removing all scale and dirt etcfrom tanks and from mouths of circulating pipes and reconnecting and re-fixing in position, complete all as specified and directed. |
| 14 | Dismantlingand removing to water storage tanks of capacity exc 250 & not exceeding 500 liters and removing to stores complete all as specified . |
| 15 | S&F rotational moulded polyethylene water storage tanks ( cylindrical vertical with closed top) hoisted and fixed in position all as specified in SSR Part-I of capacity 500 liters including all accessories, complete all as specified. |
| 16 | Dismantlingand removing to water storage tanks of capacity exceeding 500 liters but not exceeding1000 ltrs and removing to stores complete all as specified . |
| 17 | S&F rotational moulded polyethylene water storage tanks ( cylindrical vertical with closed top) hoisted and fixed in position all as specified in SSR Part-I of capacity 1000 liters including all accessories, complete all as specified. |
| 18 | S&F in repairs 20 mm bore dia of pipe ball valves high pressure of PTMT with epoxy coated aluminium rod & high density plastic ball screwed for iron pipe and fixed (min weight 20 mm - 210 grms). |
| 19 | M & L PCC 1:2:4 75 mm thick as in floors (20 mm graded stone aggregate) finished even and smooth without using extra cement complete all as specified and directed. |
| 20 | Dismantlingplain or corrugated steel sheets, asbestos cement (corrugated, semi corrugated) etc sheets and any type or any description of roof covering, complete all as specified.Note: Work will be carried out up to a height of 20 m from GL. |
| 21 | M&L for pre painted galvalume aluminium zinc coating GI based corrugated sheets 0.5 mm thick of any colour having tensile strenght of 550/MPA as in roof covering, cladding to wall fixed with self taping screws complete all as specified. |
| 22 | All as per Srl item No 21 above but plain sheets as in ridges / valley gutter. |
| 23 | M&L for repair to RCC Chajjas, facia, fins/projections including taking down loose/damaged concrete, cleaning of exposed reinforcement with wire brush, applying one coat of anticorrosive primer on reinforcement, and making good with polymer modified cement mortar (1:2) to required thickness, finished even and smooth to match existing surface, including necessary formwork, scaffolding and curing, applying two coats of cement base paint to match the existing surface complete all as specified and directed by Engr-in-Charge. Make for polymer modified cement mortar:- Asian paint, Dr. Fixit and equivalentNote: Work will be carried out up to a height of 20 m from ground level. |
| 24 | Demolition of brick work or stone masonry built in cement mortar including all quoines arches, pillar etc but excluding ashlar facing, dressed stone work and precast concrete articles, complete all as specified. |
| 25 | M&L for brick work with sub class \"B\" bricks 6mm mean radius straight or curved on plan to any radius built in cement mortar 1:6 complete all as specified. |
| 26 | Takingdown cement plaster on brick or stone wall etc including raking out joints, hacking for key scrubbing down with water etc. complete all as specified.Note: Work will be carried out up to a height of 20 m from GL. |
| 27 | M&L for 15mm thick rendering on brick work or concrete surfaces in cement mortar 1:4 finished even and smooth without using extra cement with water proofing compound all as specified and directed. Note: Work will be carried out up to a height of 20 m from GL. (Water proofing compound to be paid separately) |
| 28 | Material & Labour for applying Two or more coats of 100% Premium acrylic emulsion paint having VOC less than 50 gm/litre and UV resistance as per IS 15489:2004, Alkali & fungal resistance, dirt resistance exterior paint of required shade (Company Depot Tinted) with silicon additives @ 1.43 litre/ 10 sqm over and including priming coat of exterior primer applied @ 0.90 litre/ 10 sqm over new/old surfaces (cleaning and preparation of old surface by wire brush) complete all as specified and as directed by Engr-in-Charge. |
| 29 | M&L for cleaning of any type of roof surfaces by removing dirt, dust, loose particles, algae, fungus, moss, roots, vegetation growth, bird droppings and any foreign material completely. The work shall include scrapping, wire brushing, sweeping, washing with clean water, applying approved chemical solution (where directed) for treatment of fungus/algae, and disposal of all rubbish/muck outside the MoD land as directed by Engr-in-Charge. Note: Work will be carried out up to a height of 20 m from GL. |