Sales : +91-777 804 8217
| Sl. No. | Item Description |
| 1 | Comprehensive maintenance ofwater cooled chillar water central air conditioning plant of capacity 100 TR (2 x 50 TR Working + 1x 50 TR Stanby) Make-Voltas, comprising of following equipment mentioned below complete all as specified and directed at tyre shed bldg No P-19 & P-20 |
| 2 | (a) Chillar Unit Make-voltas = 03 SetsCompressor suitable for 2X50 TR ,415 V ,50 HZ, Model No SZ185S4RC Make- Danfoss = 03 Setsb) Condensar UnitMake Voltas=03 Setsc) Chillar water pump set back pull out type monoblock, 2900 RPM,Discharge-125USGPM,Head-44 M ,Model-KCMB1055,Cap- 10HP Make Kirloskar =3 Nos.d) Condenser water pump set back pull out type monoblock,RPM 2900 Discharge 190 USGPM,Head-25 M ,Model-KCMB 537,Cap- 5HP Make Kirloskar =3 Nos.e) Cooling tower round shapeinduced draft type water flow rate 400 US GPM,direct driven propelar fan motor of cap 5 HP, fan dia meter 1500 mm,srpay nozzle arrngement with HDPE water tankMake-Mihir -01No.f) Electrical controlpanel cubical type with multi funtion display unit, MCBs,Fuse,MPD with auxilary contactoretc. complete -03 Nos.g) Motor control centre cum APFC Electrical LT panel cubical type floor mounted with MCCB,MPCB,Push botton , Flash pattern voltmeter, Ammeter, ,SFU with ROH,APFC relay with contractor ,multi function meter etc. complete-01 No.h) LT panelfor PAC unit, cubical type floor mounted with MCCB, MCB,Push botton , Flash pattern voltmeter, Ammeter,contractor , etc. complete- 02 Nos.j) Control devices such as thermostatic expansion valve,solenoid valve and cooling thermostatic & humidity contorl switch -03 Set.k) Chilled water/ Condenser/cooling tower MS/GI pipingup to 125mm dia with valves pressure gauge temperature gauge complete-01Set. Note for item No 1 to 5:- Quoted rate deemed to be include with cost of following : (a) Periodical inspection fromfrom Authorised representative of original Air conditioning equipment manufacturerexclusively and checking screw/reciprocating /scroll compressors and electrical circuit ,Microprocessor based electrical panel of screw/reciprocating chillers,checking of all cut off/interlocks/sensors accessing oil condition & refrigerent condition and submitting its report for each plant.(Maintenance against sl no 1 to 38shall be done through authorised rep of OEM i.e Voltas exclusively ,No claim whatsoever on this account shall entertain) |
| 3 | (b) To carry out the periodical maitenace of AC plant if necessary for effective functioning. (c) The contractor shall be responsible for proper functioning of all electrical/mechanical equipment and maintain the same in sound condition to aviodthe accident and breakdown.(d) Routine checks necessary for satisfactory running the above plant and cooling tower complete all as diected by Engineer-in-charge.(e)Topping up of gas in case of leakage,compressor oil refill,descaling,repair to compressor, Condensor, motor,pump electrical panel,water supply valves,leakage,leaking refrigerant valves etc. (f) To attend the breakdown during day and night including holiday and putting the plant in working condition in shortest possible time and including suffiecient stock of spares avilable always to insure smooth and regular functioning of AC plant .The employee shall required to keep their own T&P to attend the fault/break down in quick succession also contractor require to provide PVC insulation tape roll /Teflon tape roll,rubber gasket& safety equipments etc. (g) Major Spares parts & Gas etc shall be measured &paid under respective item of this schedule. (j) Contractor should provide skilled man power for comprensive maintenance ie01 FGM for two daysand 02Helpers for two days per everymonth. (k)Contractor shall submit Monthly general servicing reportduly signed by the contractors rep, Concerned JE & Engr-in-charge.For not carrying general servicing a penalty of twice the quoted rate will be recovered from the contractor.Major items for repair shall be paid under relevant items of this schedule.(l)Contractor will submitt his registered Email ID within 15 days of acceptance to this office for intimating to complaint. b) Complaint or instruction not followed by the contractor will infrom by Email and contractor is libile to attained the same within 24 Hrs after receiving the First mail. c) If contractor fails to attaind and rectify the complaint within 24 Hrs he is liabale to penalty of Rs200 per Hrs till the completeion/ rectification of complaint/ instruction. |
| 4 | All as per item No-1 as above 100 TR (2 x 50 TR Working + 1x 50 TR Stanby) Make-Voltas but with and including 16 Nos PAC at bldg No P-216 & P- 217. |
| 5 | Comprehensive maintenance ofwater cooled chillar water central air conditioning plant of capacity 100 TR (2 x 50 TR Working + 1x 50 TR Stanby) Make-Voltas, comprising of following equipment mentioned below complete all as specified and directed by Engineer-in-Charge at tyre shed bldg No P-19 & P-20a) Chiller unit Make-Voltas = 03 SetsCompressor suitable for 2X50 TR ,415 V ,50 HZ, Model No SZ185S4RC Make- Danfoss = 03 Setsb) Condensar UnitMake Voltas =03 Setsc) Chillar water pump set back pull out type monoblock, 2900 RPM,Discharge-125USGPM,Head-44 M ,Model-KCMB1055,Cap- 10HP Make Kirloskar =3 Nos.d) Condenser water pump set back pull out type monoblock,RPM 2900 Discharge 190 USGPM,Head-25 M ,Model-KCMB 537,Cap- 5HP Make Kirloskar =3 Nos.f) Cooling tower round shapeinduced draft type water flow rate 400 US GPM,direct driven propelar fan motor of cap 5 HP, fan dia meter 1500 mm,srpay nozzle arrngement with HDPE water tankMake-Mihir -01No.g) Electrical controlpanel cubical type with multi funtion display unit, MCBs,Fuse,MPD with auxilary contactoretc. complete -03 Nos.h) Motor control centre cum APFC Electrical LT panel cubical type floor mounted with MCCB,MPCB,Push botton , Flash pattern voltmeter, Ammeter, ,SFU with ROH,APFC relay with contractor ,multi function meter etc. complete-01 No.j) LT panelfor PAC unit, cubical type floor mounted with MCCB, MCB,Push botton , Flash pattern voltmeter, Ammeter,contractor , etc. complete- 02 Nos.k) Control devices such as thermostatic expansion valve,solenoid valve and cooling thermostatic & humidity contorl switch -03 Set.l) Chilled water/ Condenser/cooling tower MS/GI pipingup to 125mm dia with valves pressure gauge temperature gauge complete-01Set . |
| 6 | All as per item No 1 abovebut for Central Type AC. Plant (Chilled Water Systems)75 TR ( 2 x 37.5 TR working & 1x 37.5 TR S/Byat Bldg No P 14 |
| 7 | All as per item No 1 abovebut for Central Type AC. Plant (Chilled Water Systems) 100 TR ( 2 x 50 TR working & 1x 50 TR S/Byat Bldg No P 218. |
| 8 | All as per item No 1 abovebut for Central Type AC. Plant (Chilled Water Systems)of capcity 100 TR ( 2 x 50 TR working & 1x 50 TR S/Byat Bldg No P 6 |
| 9 | Supply only Power transformer 240/24 volt AC,6.67 A. as per sample Suitabile for PAC\"sMake GEA Complete all as specified and directed. |
| 10 | Supply only water pressure switch as sutibale at site Complete all as specified and directed. |
| 11 | Supply onlywater pressure gauge 4\"dia with tube of range 0 to 150 PSI Make - Febig as sutibale at site Complete all as specified and directed. |
| 12 | Supply onlycrankcase heater of compressor Make- Danffos SM 185 Complete all as specified and directed. |
| 13 | Supply onlyHigh Pressure Cut Out suitable as per sample Complete all as specified and directed. |
| 14 | Supply only Low Pressure Cut Out suitable as per sample Complete all as specified and directed. |
| 15 | Supplyonlyuniversal/Strainer filter cum dryier suitable for Chilled Water Plant as per site requirement Complete all as specified and directed. |
| 16 | Supply onlywet & dry bulb Cu based thermometer of A/C plant room. |
| 17 | Supply onlypilot solenoid valve assembly of Make :CASTLE for central type AC plant as per sample Complete all as specified and directed. |
| 18 | Material and Labour for leak repairing/testing of the system& gas charging of central type Air conditioning Plant as below:-a) Repairs in refrigeration systems leak of any type capacity as mentioned in sl no 1 to 5by\"O\" Ring and Gland Packing ,services Valves / Oil sealb) Charging dry Nitrogen & holding pressure for 24 hours.c) Vacuum with double stage Vacume pump of (-) 2Kg/cm2 vacuum pressure .d) Charging the Refrigerent , Including top up the Compressor Oil and charging the gas at various Plant all as specified and directed by Eng- in- charge.( At Central AC Plant Located at P 19-20 and P 216-217 , P 218 , P-6,P-14 AC Plant) Note:- Refregarant gas R 407 or equivalent and Nitrogen gas compressor Oil will be measured and paid separately under revelent Item. |
| 19 | Supply only commercial nitrogen gasof 7.00 Cum capacity at pressure of 150 Kg/ cm2(enclosed incylinder having water volume of 46.7 litre capacity , duly tested for 150 bar,complete all as specified and as directed. |
| 20 | Supply Only Refregrant Gas R 407C/410 complete all as specified and as directed. |
| 21 | Supply and charging compressor Oil - Make -Servo or Equivalventapproved make including flushing/cleaning of oil chamber etc complete all as specified and directed.. |
| 22 | Material & Labour for chemical Descalining(using magnetic pumpset & 1001 chemical) shell and tube type condensserby circulating aforementioned chemical through for 4/ 6 hours ,checking the PH of solutionwith PH paper & bringing it within the control , Opening the end cover of condenser and cleaning inner tube manually with the help of nylon / wire brush until complete scale to be removed and flush out with fresh water. Reassembling the end cover including replacment of gasket, nuts bolts ,washeretc. as required and testingfor smooth running of the plant,complete all as directed. |
| 23 | i) Central Type AC. Plant (Chilled Water Systems) AT Bldg. 19 & 20, 216 & 217,218,P-6,P-14 of capacity 50 TR Each. |
| 24 | Supply and Fix tempreture & Humidity sensor suitable for PAC unitwall/floor mounted type(Make-GEA) complete all as per directed. |
| 25 | Disconnecting the electrical and mechanical connection of burnt electrical motors of blower ofPAC unitfrom the existing site / location, transporting to work shop(workshop will be decided by Engr-In Charge). Rewinding of electrical motors by dismantling and removing the burntcopper winding wire, cleaning the slots of stator with petrol and brushes, winding polyster based super enamelled copper wire of same gauge of original one with proper class of insulation including varnishing and heating the coil and remove air bubbles complete stator / roter after rewinding reassembling all parts including bringing back it to installation , re-installing connection to original position/making alignment and testing on full load all as directed.(tyre shed bldg No P-19 & P-20 & P-216,217). |
| 26 | Supply and Fix Pressurerelief valve 0 to 300 PSI Sutable as per sample complete all as directed. |
| 27 | Supply and Fixcatchall filters for Liquid line, working pressure 500 PSI Suitable for R 407 C Gas including arragement for installation of filter if required ( Make:- Sporlon or Equivalent |
| 28 | Supply, installation, testing & commissioning in repairs of water cooled scroll type compressor 13 TR of semihermatically sealed scroll motor Model No SZ185S4RCMake Dnfosswith internal overload protector, POE 160 SZ oil , compressor mounted on existing base including connecting with existing refrigerant pipe line, integral refrirant piping and wiring accessories for AC Plant (P-216& 217,P-19& P-20) all as required, Make-Danfoss or Equivalent Note :Old unservicable compressor will be deposited to MES E/M store. |
| 29 | Supply & fixing in replacement of box type, fine filter for AHU\"s made out of HDPE, non woven synthetic media duly washable and assembled in fully sealed anodised aluminium/GI frame, having efficiency95% down to 10 micron of following sizes:- frame of size 610 x 610 x 50, 550 x 550 x 50 & 500 x 500 x 50mm |
| 30 | All as per item No. 25.00, but frame of size 600x300x50 mm |
| 31 | Supply & fix TKC-1,240V,50-60 cycle,10w, solenoid coil of Make: SANLAN, For AC PLANT(P-19&P-20 ,P-216&P-217,P-14,P-6,P-218) complete all as specified and directed. |
| 32 | Supply and Laying in repairs MS pipe of size 125 mmheavy grade with MS flanged all fittings laid in floor or fixed to wall or at any height at top of AC Plantcomplete including with providing a scaffolding on topas prevention to humansafetycompleteas all directed . |
| 33 | Material and Labour for decorbonising of contol panel of AC plant wiring,including all internal area of panel with vacuum cleaner with out damaging existing control wiring if any damage / found fault during the decorbonising.Note All cleaning material supplied by the contractor. |
| 34 | Material and labour for air balancing of AHU of capacities 31680 cfm each, including repair arresting leakages at ducting,and balacing air flow through various air diffuser located in various rooms of block 1(ARS Store )building complete all as specified & directed. NOTE- 1.Quoted Rate including repair of ducting and ducting fabrication work. 2.Material and necessary T&P, all tools, ladder, transportationshall be arranged by contractor and cost of the same will be deemed to be included in the unit rate quoted. |
| 35 | Material and labour for air balancing of AHU of capacities 32640 cfm each, including repair arresting leakages at ducting,and balacing air flow through various air diffuser located in various rooms of block 2(IACCS Store) building complete all as specified & directed. NOTE- 1.Quoted Rate including repair of ducting and ducting fabrication work. 2.Material and necessary T&P, all tools, ladder, transportationshall be arranged by contractor and cost of the same will be deemed to be included in the unit rate quoted. |
| 36 | Material and labour for air balancing of AHU of capacities 22000 cfm each, including repair arresting leakages at ducting,and balacing air flow through various air diffuser located in various rooms ofblock 3(P-14 Hanger) building complete all as specified & directed. NOTE- 1.Quoted Rate including repair of ducting and ducting fabrication work. 2.Material and necessary T&P, all tools, ladder, transportationshall be arranged by contractor and cost of the same will be deemed to be included in the unit rate quoted. |
| 37 | Supply and Fix RH controllerincluding sensor wire of AHU,complete all as specified and directed. |
| 38 | Servicing & periodical maintenance of All Precesion type Air conditionerof capacity 4.38TR wall mounted,Make GEA, Model - MU 11 C, Qty 16 installed in bldg. No. P-216& P-217, by replacingunserviceable/ worn outparts of the machine cleaning of Cooling Coil unit, all filtersChecking/repairs to Electrical panels ,sensor unit for proper functioning and testing and replacing where required complete all as directed.Note: 1.Contractor shall submit Monthly general servicing reportduly signed by the contractors rep, Concerned JE & Engr-in-charge. 2.For not carrying general servicing a penalty of twice the quoted rate will be recovered from the contractor. |
| 39 | Servicing & periodical maintenance of Precesion type Air conditionerof capacity 3.65TR Floor mounted,Make GEA Model - U 5 CG, Qty 24 installed in bldg. No.P-19 & P-20, by replacingunserviceable/ worn outparts of the machine cleaning of Cooling Coil unit, all filtersChecking/repairs to Electrical panels ,sensor unit for proper functioning and testing and replacing where required complete all as directed.Note: 1.Contractor shall submit Monthly general servicing reportduly signed by the contractors rep, Concerned JE & Engr-in-charge. 2.For not carrying general servicing a penalty of twice the quoted rate will be recovered from the contractor. |
| 40 | Taking Out burnout / unservicebale blower with Motor of PAC unit Floor / Wall mounted type3.65 TR, 4.38 TRand Supply & fix New Blower with motorModel:- ebmpapst R4E355-AG02-05-230v-50Hz( Made In Germany) or Equivalent,along with centrifugal fan R2E280-RB01-01 with M2E074-GA(EBM) 230 VAC and Inlet ring 28000-2-4013(EBM) complete suitableper existing model and makeof capacity 3.65 /4.38 TR PAC\" unit(Make-GEA) completeall as directed by engineer-in-charge. |
| 41 | Supply and Fix 3 way motorised modulating valves suitable for Precision air conditioning unit (PAC)of following size:- |
| 42 | a) 25 mm dia. |
| 43 | b) 32 mm dia. |
| 44 | Supply and fixthermal expansion valve suitable for 50 TR Chilledwater Central type AC plant system all as per sample, including brazing at both ends all as required and directed. |
| 45 | Taking out unserviceable circuit board and supply and fix New Electronic Circuit board (PCB) forPresion A.C. unit GEA.Make 3.65 TR And 4.38 TRcapacity suitable for make- GEA. or equivalent connecting to existing system complete all as directed. |
| 46 | Taking out unserviceble PAC Unit Floor / Wall Mounted Type 3.65 TR Model (TU005CG) Make GEAinstalled in building no P 19-20 and Disconnecting the electrical and mechanical connection transporting to and return back from work shop Complete overhauling and repair of PAC Unit ofcapacity 3.65 TR Cleaning, Oiling, greasing and replacement of other worn out/unsv parts of PAC Unit if required Repair Replacement of the Following Parts - Cost of same should be included in the quoted Rate 1) VMR -6 Voltage Controller 2) Fuse Assembly and Fuse 3) MCB as per exisitng Sample 4) Blower overhualing 5) Filter6)Repair /Replacement of Heater assembly Re-ssembling of PAC Unit and Re-installing PAC unit and Connection to original position and testing on full load all as directed. |
| 47 | Taking out unserviceble PAC Unit Floor / Wall Mounted Type 4.38 TR Model MUO11C Make GEA installed in building no P 216-217 and Disconnecting the electrical and mechanical connection transporting to and return back from work shopComplete overhauling and repair of PAC Unit ofcapacity 4.38 TR Cleaning, Oiling, greasing and replacement of other worn out/unsv parts of PAC Unit if required Repair Replacement of the Following Parts - Cost of same should be included in the quoted Rate 1) VMR -6 Voltage Controller2) Fuse Assembly and Fuse 3) MCB as per exisitng Sample 4) Repair/Replacement of Blower - 2 nos5) Filter 6) Repair/Replacement of Blower Motor 7) Repair/Replacement of Heater assemblyRe-assembling of PAC Unit and Re-installing PAC unit and Connection to original position and testing on full load all as directed. |
| 48 | Supply and fix cast iron butterfly valvewith maching double flanges ,gasket, necessary hardware complete all as specified and all as directed for the following size :- |
| 49 | a) 65 mmbore |
| 50 | b) 80 mmbore |
| 51 | c) 100 mmbore |
| 52 | Supply and Fix Gun-metal, globe or gate valves, with iron wheel head, screwed both ends for iron pipe and fixed globe valve cast copper alloy to match with the existing of following size including cutting welding/brazing required if any all as required at site. |
| 53 | a) 15 mmbore |
| 54 | b) 25 mmbore |
| 55 | c) 40 mmbore |
| 56 | Supply and Fixbalancing valves forChilled water line of following sizes :- |
| 57 | a) 32 mmdia |
| 58 | b) 25 mmdia |
| 59 | c) 80 mmdia |
| 60 | M&L for disconnecting electrical connections of motor located at the top of cooling tower,keep cables at safe custody for reconnection and dismantling and taking out fan blade assembly along with motor mounted on base frame at the top of cooling tower after cutting/dismentaling all nuts, bolts and fixtures from the mounting frameand removing whole assembly including motor and base frame from the top of cooling tower with the help of T&P for servicing of cooling tower suitable for 100 TR capcityincluding following complete :-(i) Cleaning /scrapping of inner& outer surface of FRP basin, repair of damaged portion if any incuding FRP lining of all surfaces joints to avoid leakage including replacement of all nuts and bolts joining all parts of Basin complete. (ii) servicing cooling towerthrough cleaning re-agent complete pipe line,including servicing of cooling tower motor and fan and make the necessary alignment with motor. (iii) Replacement of bearing if any of suitable cap if any after necessory work including gressing and replacement of nut bolts and preventing leakage if any by means of suitable adetives etc all as directed andspecified. (iv) Taking out PVC fills blocks, cleaning , refixing and replacing if unserviceable as per existing location and channel direction.(v) Servicing of spray header and sprinkler assy complete.(vi) Cleaning of water strainer complete. .(Replacement of following spare part mentioned hereafter in the process of maintenace will be measured & paid separately ) |
| 61 | Sprinkler assembly 5\" x 75 mm size |
| 62 | FRP Flapper |
| 63 | Turn Buckle |
| 64 | FRP composite material |
| 65 | Supply ,fix,testing & commissioning in repair cooling tower fan blade assembly set as per existing model and site requirment of AC PLANT(P-216&P-217,P-218,P-19&P-20,P-6,P-14)all as specified and directed. |
| 66 | Supply only honeycomp FRP/ PVC Fills (small size) in colums of size 60 x 15 x 15 cm or next higher size as per existing specification and requirement complete all as directed. |
| 67 | Supply andFix in replacment ofFloat valve(brass) 25MM complete all as directed. |
| 68 | Supply only Ball / Roller bearing for Sprinlkler top and bottom Hub for Central AC Plant(P-216&P-217,P-218,P-19&P-20,P-6,P-14)complete all as directed. |
| 69 | Material and Labour forDisconnecting the electrical and mechanical connection and Taking OutCondenser/Chiller Pump and transporting to workshop (workshop will be decided by Engr-In-Charge)for Complete overhauling and RepairPumpSet of Capacity 5 HP Repair includes Cleaning, Oiling, replacement of gland packing ,Greasing and Replacement of other worn out/unsv parts of pump ,replacement of bushing and complete painting of pump by two coats of synthetic enamel paint,Marking MES Noand reassembling and installation of pump at site & testing to the satisfaction of Engineer in charge.Notes : (i) repalcement and supplyof spares like bearing and sleeve,repair to impeller etc will be measured and paid separetly under respective items. |
| 70 | All as per item No.54 but PumpSet of Capacity 7.5 HP |
| 71 | All as per item No.54 but PumpSet of Capacity 10 HP |
| 72 | Supply only of spare parts of pumps sets:- |
| 73 | (a) Shaft bearing of 5 HP pumpset as per existing specifications. |
| 74 | (b) Shaft sleeve of 5 HP pumpset |
| 75 | (c) Impeller of 5 HP pumpset |
| 76 | (d) Impeller Keys of 5 HP pumpset |
| 77 | (e) Shaft bearing of 7.5 HP pumpset |
| 78 | (f) Shaft sleeve of 7.5 HP pumpset |
| 79 | (g) Impeller of 7.5 HP pumpset |
| 80 | (h) Impeller Keys of 7.5 HP pumpset |
| 81 | (I) Shaft bearing of 10 HP pumpset |
| 82 | (J) Shaft sleeve of 10 HP pumpset |
| 83 | (K) Impeller of 10 HP pumpset |
| 84 | (L) Impeller Keys of 10 HP pumpset |
| 85 | (m)Repair to Rotor Shaft, Rotor Key for 10 HP |
| 86 | (n)Repair to Rotor Shaft, Rotor Key for 7.5 HP |
| 87 | (o)Repair to Rotor Shaft, Rotor Key for 5 HP |
| 88 | (p)Supply only Oil Seal for 10 HP |
| 89 | (q)Supply only Oil Seal for 7.5 HP |
| 90 | (r)Supply only Oil Seal for 5 HP |
| 91 | (s)Supply onlyWater Seal for 10 HP |
| 92 | (t)Supply onlyWater Seal for 7.5 HP |
| 93 | (u)Supply onlyWater Seal for 5 HP |
| 94 | Disconnecting the electrical and mechanical connection of burnt electrical motors from the existing site / location, transporting to work shop ,Rewinding of electrical motors by dismantling and removing the burntcopper winding wire, cleaning the slots of stator with petrol and brushes, winding polyster based super enamelled copper wire of same gauge of original one with proper class of insulation including varnishing and heating the coil and remove air bubbles complete stator / rotor after rewinding reassembling all parts including bringing it back to installation , re-installing making alignment to get trouble free operation connection to original position and testing on full load all as directed by Engineer -in -charge for different capacity of motor as per following :- |
| 95 | a) 10 HP(Chiller Pump set ) |
| 96 | b)7.5 HP(CondenserPump set) |
| 97 | c) 5 HP (Condenser/Chiller Pump set) |
| 98 | d) 3 HP (CT Fan Motor) |
| 99 | Material and Labour for Painting ofair conditioning plant with equipments,pump set,water suction /discharge / liquid piping of any specification with enamel paint of approved quality after prepration of surface includingfitments e.g., condenser , chillar,valves ,cooling tower & associated pipelines ,marking water flow direction etc as per colour code of Cental air conditioning plants including writing MES / SM No complete all as directed. |
| 100 | Supply andFix Portable Dehumidifier of capacity 70 Ltr/day,along with electrical connection,power supply 220/240V ,programmable timer,auto start ,with varriable humidity settings,make as approved. |
| 101 | Material & Labour for carring out repairs to Existing Panel / Star delta starter in open execution ,identifying the fault /trouble in wiring,rectifying the wiring fault using suitble flexible copper cableReplacement of time delay(timer), single phasing preventer & suitable relay with new one(as required as per its specification or as specified by Engineer -In Charge) ,rewiring of complete starter using suitable size flexible copper cable,& checking copper winding of motor upto 60 HP electric motors and testing of electrical circuit/Pumpset to the complete satisfaction of Eng-In-Charge,complete all as specified and as directed .(Note :Spares required other than mentioned above in the process of maintenance will be measured and paid separately under relevant item mentioned here after) |
| 102 | Supply only3 pole power contactor, coil voltage 230/415 Volts for following capacity motors:- |
| 103 | (a) Contactor with coil voltage of capacity 18 Amps to 25Amps,MNXtype, 240,50Hz |
| 104 | (b) Contactor with coil voltage of capacity 70 A, MNX70,2NO+2NC, 240/415V, AC, |
| 105 | ( c) ADD ON Block .2NO+2NC,AC. |
| 106 | Supply onlyelectronic timer type ST 100, 240 volts 50 HZ suitable for base mounting and DIN mounting complete all as dircted.Make : L&T. |
| 107 | Supply and Fix in replacement of MCCB 125 amp, 25KA ,3 Pole,415 V, AC complete all as directed. |
| 108 | Supply and Fix in replacement of MCCB 160 amp, 25 KA ,3 Pole,415 V, AC complete all as directed. |
| 109 | Supply and Fix in replacement of MCCB 25 to 100 amp, 16 KA ,3 Pole,415 V, AC make:Siemen or Equivalent, complete all as directed. |
| 110 | Supply and Fix in replacement of MPCB range 9-14 amp, AC complete all as directed. |
| 111 | Supply and Fix in replacement ofMPCB Range 14-23 amp, AC complete all as directed. |
| 112 | Supply and Fix in replacement of MCBDP 32 amp, 10 KA ,230 V, AC complete all as directed. |
| 113 | Supply and Fix in replacement of MCBDP 40 amp, 10 KA ,230 V, AC complete all as directed. |
| 114 | Supply and Fix MVPD make - Softhard Type MPD range 5-30 A Aux supply 15 VAC for Panel |
| 115 | Supply and Fix MVPD make- Softhard Type MPD range 5-70 A Aux supply 230 VAC for Panel |
| 116 | Supply and Fixin repair digital volt meter 0 to 500 volt complete all as directed |
| 117 | Supply and Fix in repair digital ammeter0 to 400 A complete all as directed |
| 118 | Supply and Fix in replacment ofHRC Fuse63 AMP Fuselink HF 63ACylindrical complete all as directed. |
| 119 | Supply and Fixbimetal over load realay of following Range :- |
| 120 | a)RELAY MN2 9-15A |
| 121 | b) RELAY MN2 14- 23A |
| 122 | Supply and Fix in replacment of Indication Lamp R-Y-B Set complete all as directed. |
| 123 | Supply & Fixin replacment of Push Button in Red/Blue/Yellow complete all as directed. |
| 124 | Material & Labour for removal of following size of pipe as existing Unservicable damagedinsulation from chilled water pipe and M&L for chilled water pipe insulationhalf section PUF shall be bonded to the Surface of pipe with adhesiveand binded with metal binding wire. This lnsulation should be covered with fibre glass clothing and finally be finished with zylon base weather proof coating with two coats of AC ducting E 96 (Fevicol Make) as under:-(a) M&L for cleaning the pipe surface (to be insulated) by scrapping carefully with wire brush etc. to make the surface completely free of millscale, dirt, dust, grease and other foreign materials, taking special care so that all Pipejoints are sealed against any leakage. (b) The adhesive shall be used for bonding the seams securely together including butt & logitudinal joints, fittings and coverings must be closed with adhesive.(c) The adhesive shall be specially formulated fot the pipe insulation applicationand supplied by the insulatin manufacturer and have excellent bonding to porousand non porous surfaces. |
| 125 | a)15 mm dia |
| 126 | b)25 mm dia |
| 127 | c) 32 mm dia. |
| 128 | d) 40 mm dia |
| 129 | e) 50mm dia |
| 130 | f) 65mm dia |
| 131 | g) 80mm dia |
| 132 | h) 100mm dia. |
| 133 | j) 125 mm dia |
| 134 | Material and Labour for replacement of existing worn out MSAC duct withmade outof5 mm thick MS sheet and necessary required welding, bend to shape, cutting and fixing with nut bolt and washer and providingnecessary wire mesh for prevent to rats in the duct including painting with 2 coats of synthetic enamel paint over a coat of redoxide primer complete all as directed. Note: Material and necessary T&P all tools, ladder, transportationshall be arranged by contractor and cost of the same will be deemed to be included in the unit rate quoted. |
| 135 | Supply only V belt ofMake Fenner/Everest of sizeB/8 as approved. |
| 136 | Supply and fixing in replacement of \"V\" belt for AHU blower motor of size B-72 |
| 137 | All as per item No.82 but of size B-63 |
| 138 | All as per item No.82 but of size B-94 |
| 139 | All as per item No.82 but of size B-95 |
| 140 | All as per item No.82but of size B-105 |
| 141 | All as per item No.82 but of size B-104 |
| 142 | Supply only Copper Tubing 2 mm thick and 10 mm dia (3/8\")for additional length required for in process of maintenance, complete all as specified & as directed. |
| 143 | All as per item No.88 but of size 12 mm dia (1/2\") |
| 144 | All as per item No.88 but of size6 mm dia (1/4\") |
| 145 | All as per item No.88 but of size18 mm dia (3/4\") |
| 146 | All as per item No.88 but of size25 mm dia (1\") |
| 147 | Supply ,assembly & erection of PGI sheet with C & SS rectangular /square duct made out of square/rectangular cross section and reuired curveshapedsas per site requirement L shape hollow profile duly factory fabricated box including all accessories such as corner cleat,carriage bolt ,Rubber gasket & appropriate sealant on longitudinal joints,necesssary control dampers and grill embedded in PGI duct etc complete of size 24 gauge including duly supended to ceiling /wall with the help of suitable size MSsupports,nut,bolts& washer,anchor fastner , etc.,complete all as specified . Note:Material and necessary T&P , all tools, ladder, transportationshall be arranged by contractor and cost of the same will be deemed to be included in the unit rate quoted. |
| 148 | Supply and FixStrip heater 3 Kw suitable for AHU heater bank at Block-1(P-6),IACCS Store,Blocl-III(P-14) ac plant room,Complete all as specified and directed.Note:Material and necessary T&P for taking down of Unserviceable heater, all tools, ladder, transportationshall be arranged by contractor and cost of the same will be deemed to be included in the unit rate quoted. |
| 149 | Note : The amount against Schedule of Credit on Page No. 43 shall be deducted from the total amountquoted against Sch \"A\"while deriving lum Sum for Acceptance. |
| SR No | FileName | File Description |
| 1 | Click here to download tender document | Tender Documents |
| 2 | Click here to download tender document | Tender Documents |
| 3 | Click here to download tender document | Tender Documents |
| 4 | Click here to download tender document | Tender Documents |
Copyright © 2026 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail