| 1 | Dismantling of damaged roofing sheet including ridges, hips, valleys and gutters etc., and stacking the material within 50 metres lead of: G.S. Sheet etc .Measurement considered as per actual execution of work done at site for payment etc. all complete as per instruction of Engineer in charge.Note: Before quoting the rate contractor shouldvisit the site and the contractor should make necessary scaffolding arrangement including safety shoes, helmets, harnesses, jackets, safety rope which is within Contractor scope and responsibility.The workmen employed for the purpose should be covered under risk Insurance. Before quoting therate / price contractor must be visit the site condition, all above works should be completed as per instruction of Engineer - In - Charge. Location : 1).Geotech and EFW lab - 417.40 sqm. 2).NDBP & BTF - 510.50sqm. |
| 2 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. In cement mortar.Location : 1).Geotech and EFW lab - 0.70cum. 2).NDBP & BTF - 3.30cum. |
| 3 | Providing and fixing precoated galvanised iron profile sheets (size, shape and pitch of corrugation as approved by Engineer-in-charge) 0.50 mm (± 0.05 %) total coated thickness with zinc coating 120 grams per sqm as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns. Sheet should have protective guard film of 25 microns minimum to avoid scratches during transportation and should be supplied in single length upto 12 metre or as desired by Engineerin- charge. The sheet shall be fixed using self drilling /self tapping screws of size (5.5x 55 mm) with EPDM seal, complete upto any pitch in horizontal/ vertical or curved surfaces, excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required. Note: Measurement considered as per actual execution of work done at site, wastage ofroofing sheetis not considered for payment etc. all complete as per instruction of Engineer in charge.The contractor should make necessary scaffolding arrangement including safety shoes, helmets, harnesses, jackets, safety rope which is within Contractor scope and responsibility.The workmen employed for the purpose should be covered under risk Insurance. The corrugated G.S sheet should be cut according to the size of turbo ventilator available in the roofing area. Before quoting therate / price contractor must be visit the site condition, all above works should be completed as per instruction of Engineer - In - Charge.Make: TATA , JSW ,Jindal , HT steel , CR steel.Location : 1).Geotech and EFW lab - 417.40 sqm. 2).NDBP & BTF - 510.50sqm. |
| 4 | Providing and fixing precoated galvanised steel sheet roofing accessories 0.50 mm (± 0.05 %) total coated thickness, Zinc coating 120 grams per sqm as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns using self drilling/ self tapping screws complete :Ridges plain (600mm).Make: TATA , JSW ,Jindal , HT steel , CR steel .Location : Geotech and EFW lab |
| 5 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in : Cement mortar 1:4 (1 cement : 4 coarse sand).Location : 1).Geotech and EFW lab - 0.70cum. 2).NDBP & BTF - 4.90cum. |
| 6 | 15 mm cement plaster on the rough side of single or half brick wall of mix : 1:4 (1 cement: 4 coarse sand). Location : 1).Geotech and EFW lab - 4.70sqm. 2).NDBP & BTF - 40.30sqm. |
| 7 | Providing and laying of Bitumen tar sheets 450mm wide laying on above roofing sheet hole area with necessary bonding components etc all complete as perdirection of Engineer - in- charge. Note;.Sample sheetshould be approved by Engineer in Charge.Measurement considered as per actual execution of work done at site. The Rate including safety shoes, helmets, harnesses, jackets, safety rope which is within Contractor scope and responsibility. Location : NDBP Bay -2 & BTF Bay area. |
| 8 | Removing the existing 24\"\" Turbo ventilator and Refixing the same in proper position as per instruction of Engineer in charge.The Refixing the 24\"\" turbo ventilator in the existing aluminium base plate on G.I roof with necessary hardware fittings,sealant packing alround turbo ventilator area on the existing roofing sheet,scaffolding etc.Note: The contractor must arrange for all necessary proper safety arrangement all complete as per instruction of Engineer in charge.Before quoting the rate contractor should visit the site.Note: The removing and refing of turbo ventilator in included in the scope of work without causing any damage.Location : NDBP Bay - 1,2 & BTF Bay. |
| 9 | TOTAL WITHOUT GST |
| 10 | GST 18% |
| 11 | TOTAL |