| 1 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5 m, as directed by Engineer-in- Charge: All kinds of soil. |
| 2 | 1st Camp |
| 3 | 2nd Camp |
| 4 | 3rd Camp |
| 5 | 4th Camp |
| 6 | 5th Camp |
| 7 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil. |
| 8 | 1st Camp |
| 9 | 2nd Camp |
| 10 | 3rd Camp |
| 11 | 4th Camp |
| 12 | 5th Camp |
| 13 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. |
| 14 | 1st Camp |
| 15 | 2nd Camp |
| 16 | 3rd Camp |
| 17 | 4th Camp |
| 18 | 5th Camp |
| 19 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 20 mm nominal size). |
| 20 | 1st Camp |
| 21 | 2nd Camp |
| 22 | 3rd Camp |
| 23 | 4th Camp |
| 24 | 5th Camp |
| 25 | Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with :Cement mortar 1:6 (1 cement : 6 coarse sand) |
| 26 | 1st Camp |
| 27 | 2nd Camp |
| 28 | 3rd Camp |
| 29 | 4th Camp |
| 30 | 5th Camp |
| 31 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering -All works upto plinth level: 1:2:4 (1 cement : 2 coarse sand (zone III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 32 | 1st Camp |
| 33 | 2nd Camp |
| 34 | 3rd Camp |
| 35 | 4th Camp |
| 36 | 5th Camp |
| 37 | Providing and laying damp-proof course 40 mm thick with cement concrete 1:2:4 (1 cement : 2 coarse sand (zone-lll) derived from natural sources : 4 graded stone aggregate 12.5 mm nominal size derived from natural sources) |
| 38 | 1st Camp |
| 39 | 2nd Camp |
| 40 | 3rd Camp |
| 41 | 4th Camp |
| 42 | 5th Camp |
| 43 | Providing and laying Autoclaved Aerated concrete(AAC) blocks masonry 100 mm/ 125 mm thick with Grade-1 AAC blocks of density 551 to 650 kg/cum conforming to 1S:2185 (Part 3) in super structure above plinth level up to floor V level in cement mortar 1:4 (1 cement : 4 coarse sand ). The rate includes providing and placing in position 2 Nos 6 mm dia M.S. bars at every third course of masonry work. |
| 44 | 1st Camp |
| 45 | 2nd Camp |
| 46 | 3rd Camp |
| 47 | 4th Camp |
| 48 | 5th Camp |
| 49 | Providing and laying cement concrete in retaining walls, return walls,walls (any thickness) including attached pilasters, columns, piers,abutments, pillars, posts, struts, buttresses, string or lacing courses,parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc., up to floor five level, excluding the cost of centering,shuttering and finishing:1:2:4 (1 Cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 50 | 1st Camp |
| 51 | 2nd Camp |
| 52 | 3rd Camp |
| 53 | 4th Camp |
| 54 | 5th Camp |
| 55 | Making plinth protection 50mm thick of cement concrete 1:3:6 (1 cement: 3 coarse sand: 6 graded stone aggregate 20 mm nominal size) over 75 mm bed by dry brick ballast 40 mm nominal size well rammed and consolidated and grouted with fine sand including finishing the top smooth |
| 56 | 1st Camp |
| 57 | 2nd Camp |
| 58 | 3rd Camp |
| 59 | 4th Camp |
| 60 | 5th Camp |
| 61 | Providing and fixing Fiber Glass Reinforced plastic (FRP) Door Frames of cross-section 90 mm x 45 mm having single rebate of 32 mm x 15 mm to receive shutter of 30 mm thickness. The laminate shall be moulded with fire resistant grade unsaturated polyester resin and chopped mat. Door frame laminate shall be 2 mm thick and shall be filled with suitable wooden block in all the three legs. The frame shall be covered with fiber glass from all sides. M.S. stay shall be provided at the bottom to steady the frame. |
| 62 | 1st Camp |
| 63 | 2nd Camp |
| 64 | 3rd Camp |
| 65 | 4th Camp |
| 66 | 5th Camp |
| 67 | Providing and fixing to existing door frames 30 mm thick Fiberglass Reinforced Plastic (F.R.P.) flush door shutter in different plain and wood finish made with fire retardant grade unsaturated polyester resin, moulded to 3 mm thick FRP laminate all around, with suitable wooden blocks inside at required places for fixing of fittings and polyurethane foam (PUF)/Polystyrene foam to be used as filler material throughout the hollow panel, casted monolithically with testing parameters of F.R.P. laminate conforming to table - 3 of IS: 14856, complete as per direction of Engineer-in-charge. |
| 68 | 1st Camp |
| 69 | 2nd Camp |
| 70 | 3rd Camp |
| 71 | 4th Camp |
| 72 | 5th Camp |
| 73 | Reinforced cement concrete work in beams, suspended floors, roofshaving slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing andreinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derivedfrom natural sources : 3 graded stone aggregate 20 mm nominal sizederived from natural sources). |
| 74 | 1st Camp |
| 75 | 2nd Camp |
| 76 | 3rd Camp |
| 77 | 4th Camp |
| 78 | 5th Camp |
| 79 | Steel reinforcement for R.C.C. work including straightening, cutting,bending, placing in position and binding all complete above plinth level.Thermo-Mechanically Treated bars of grade Fe-500D or more. |
| 80 | 1st Camp |
| 81 | 2nd Camp |
| 82 | 3rd Camp |
| 83 | 4th Camp |
| 84 | 5th Camp |
| 85 | Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. Hot finished welded type tubes. |
| 86 | 1st Camp |
| 87 | 2nd Camp |
| 88 | 3rd Camp |
| 89 | 4th Camp |
| 90 | 5th Camp |
| 91 | 12 mm cement plaster on rough side of single or half brick wall of mix :of 1:4 (1 cement:4 coarse sand) |
| 92 | 1st Camp |
| 93 | 2nd Camp |
| 94 | 3rd Camp |
| 95 | 4th Camp |
| 96 | 5th Camp |
| 97 | 6 mm cement plaster of mix : 1:3 (1 cement : 3 fine sand) |
| 98 | 1st Camp |
| 99 | 2nd Camp |
| 100 | 3rd Camp |
| 101 | 4th Camp |
| 102 | 5th Camp |
| 103 | Finishing walls with ready mixed Premium acrylic emulsion paint (Company Depot Tinted) having VOC less than 50 gm/litre and UV resistance as per IS 15489:2004, Alkali & fungal resistance, dirt resistance exterior paint of required shade with silicon additives.New work (Two or more coats applied @ 1.43 litre/ 10 sqm over and including priming coat of exterior primer applied @ 0.90 litre/10 sqm. |
| 104 | 1st Camp |
| 105 | 2nd Camp |
| 106 | 3rd Camp |
| 107 | 4th Camp |
| 108 | 5th Camp |
| 109 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete. |
| 110 | 1st Camp |
| 111 | 2nd Camp |
| 112 | 3rd Camp |
| 113 | 4th Camp |
| 114 | 5th Camp |
| 115 | Wall painting with acrylic emulsion paint, having VOC (Volatile OrganicC ompound ) content less than 50 grams/ litre, of approved brand and manufacture, including applying additional coats wherever required, to achieve even shade and colour. |
| 116 | 1st Camp |
| 117 | 2nd Camp |
| 118 | 3rd Camp |
| 119 | 4th Camp |
| 120 | 5th Camp |
| 121 | Providing and fixing Roof paneling 60 mm .The Roof pannel shall be made of panels with 0.45 mm thick PPGI steel ribbed cladding on both side rigid CFC free polyurethane foam of density 40 kg/cum +/-2kg/cum as insulation. The thickness of PU foam shall be 80 mm.The panel will be jointed with can lock & tongue and groove arrangement produced on discontinues panel production line. The PUF insulation material in the panel shall have fire retarding and self extinguishing property as per international standard with flammability B1 grade. The material required for manufacturing of panel will be new and will comply with relevant IS as applicable. The PUF insulation material used in the panels should conform to IS 12436-1988. The panel will be of termite proof and Nil water absorption. The manufacturer of PUF panel shall have test certificate /report for fire BS 476 chapter V,VI,VII from CBRI Roorkee for any sample of PUF panel. Each panel should be supplied prepainted with a color coating of 50 microns of architectural polyster on a min. 175 gms/per sqm base of zinc coating on the finished surface for protection against scratches during handling and transportation. . The sheet shall be fixed using self drilling/ self tapping screws of required size with EPDM seal complete up to any pitch in horizontal/ vertical or curved surfaces excluding the cost of purlins rafters and trusses and including cutting to size and shape wherever required. |
| 122 | 1st Camp |
| 123 | 2nd Camp |
| 124 | 3rd Camp |
| 125 | 4th Camp |
| 126 | 5th Camp |
| 127 | Providing and fixing 10mm thick Polycorbonate sheet ( High/Low Temperature Resistance, Thermoformable) on roofing with suitable screws etc. complete (frame work to be paid seperatately). |
| 128 | 1st Camp |
| 129 | 2nd Camp |
| 130 | 3rd Camp |
| 131 | 4th Camp |
| 132 | 5th Camp |
| 133 | Providing and fixing 60 mm thick micro ribbed continuous line PUF slab wrapped in 200 G Virgin Polythene bags, having density not less that 40 kg/cum and R value not less than-21. Foam to be placed evenly between 02 walls so as to get sandwitched, to provide thermal insulation so as to minimize the heat loss during night time, complete in all respect as per manufactures specification and as per directions of Engineer-in-Charge. |
| 134 | 1st Camp |
| 135 | 2nd Camp |
| 136 | 3rd Camp |
| 137 | 4th Camp |
| 138 | 5th Camp |