| 1 | M&L for repair of LT Panel of AC Plant, floor mounted, rectangular type, by checking of MCCBs, relays, meters, busbar joints, busbar & circuit spouts etc with and including decarbonising/ cleaning of panel by applying \"Becktrol red solution\" to the surface and applying of monoplast compound at the busbar joits after tightening of joints and re asembling including repair of PCC works, replacing of burnt out cable end treminals and jointing of earth connection complete all as specified and directed. Note :- (i) MCCBs, contacts, relays, meters and timers will be paid and measured separately under the relevant items.(ii) An inventory has to be prepared for defective parts and signed by Engineer-in-charge and contrctor while checking the worn out/ defective parts. |
| 2 | S&F in repair including connecting and testing of MCCB 16KA, 3 pole, 50Hz, 415V AC, Ics = 100% Icu, thermal magnetic release with thermal adjustable – 0.8 to 1In, magnetic Adjustable – 5 to 10In, in existing panel and connecting to bus-bar with all connecting accessories and modification in busbar (if Necessary) complete all as specified and directed of following capacities:- |
| 3 | 63 Amp |
| 4 | 100 Amp |
| 5 | S&F in repair 3 pole power contactor of following capacity (AC1 rating), heavy duty, 415 Volt AC,with auxiliary contactors of (2No+2NC) with coil voltage complete all as specified and directed :- |
| 6 | ML-3 type, 45 Amp. |
| 7 | ML- 1.5 type, 25 Amps |
| 8 | S&F in repair overload relay, direct mounting type suitable for ML series contactor and connecting to contactor with all connecting accessories including testing complete all as specified and directed of following capacities:- |
| 9 | 13 Amp to 21 Amp. |
| 10 | 20 Amp to 32 Amp. |
| 11 | S&F in repair electronic timer, type ST 100, suitable for 240/ 360/ 415V complete all as specified and directed of following capacities:- |
| 12 | 3-30 Sec |
| 13 | 12-120 Sec |
| 14 | S&F in repair single phase preventer as per existing make and model complete all as specified and directed. |
| 15 | S&F in repair front door of 2mm thick CRCA sheet of Panel as per existing make and model complete all as specified and directed. |
| 16 | S&F in repair complete control wiringas per existing make and model complete all as specified and directed. |
| 17 | S&F in repair digital type Ammeter, flush mounting of size 96 x 96 mm, accuracy Class 0.5, with inbuilt selector switch for 3 phase meters, input voltage measurement range 50-520 VAC (P-P), aux supply 80-300 V AC / DC, CT secondary site selectable 1A / 5A complete all as specified and directed. |
| 18 | S&F in repair digital type volt meter, flush mounting of size 96 x 96 mm, accuracy Class 0.5, with inbuilt selector switch for 3 phase meters, input voltage measurement range 50-520 VAC (P-P), aux supply 80-300 V AC / DC, CT secondary site selectable 1A / 5A complete all as specified and directed. |
| 19 | M&L for repair/ servicing/ overhauling of reciprocating/ rotary compressor 11TR (Make-Bock compressor, model- FK-5) complete including taking down unserviceable parts and refixing new parts whererever necessary and directed after the pumping down the complete system and collecting the refrigerant into condenser, compressor oil into clean container, disconnecting the compressor from suction & discharge side and including leak testing of compressor after reassembling the parts, recharging/ filling retrived oil & gas, replacement of belt if required and testing upto satisfactory cooling performance complete all as specified and as directed. Note:- (i) spare parts, belt, refrigerant (gas) & compressor oil for top up if required shall be measured and paid separately under relevant items.(ii) An inventory has to be prepared for defective parts and signed by Engineer-in-charge and contrctor while checking the worn out parts.(iii) Metal filling,grinding, polishing spring, washer, quarter, and consumable items such as grease cotton waste etc., are deemed to be included in the quoted rate. |
| 20 | Supply only following spare/ parts for repair compressor complete all as specified and directed:- |
| 21 | Compressor oil, N-68, in sealed pack. |
| 22 | Refrigerant gas R-404 in manufacturer sealed cylinder. |
| 23 | Wedge (V) Belts B-72 |
| 24 | Wedge (V) Belts SPA - 1700 |
| 25 | M&L for servicing of indoor unit of air cooled air conditioning plant package type of following capacity by opening front grill, bottom grill cleaning filters, by spraying water jet, removing dust/ dirt from package unit all over, checking electric connection, checking any leakage by applying soap solution on joint & liquid/ vapour lines properly checking functionality of all spares & replacing the same under relevent item of schedule & put the air conditioner into operation complete all as specified and directed :-Note : (i) Spare parts will be measured and paid separately.(ii) Sliding the filter out and washing it with water and drying in the shade, reinstalling the same. |
| 26 | Capacity 3x 11 TR |
| 27 | Description same all as per item No 13 above, but outdoor unit of AC plant of following capacities:-Note : Inspection of vibration insulation rubber for wear and fightening the mounting lugs. |
| 28 | Capacity 3x 11 TR |
| 29 | M&L for leakage testing of air conditioning plant, package type, comprising of condenser units, chiller units, indoor unit and outdoor unit with pressur testing of complete plant by dry nitrogen gas by separating high side and low side, brazing and low side, rectifying the leakage by gas welding, brazing, pressure testing, vaccumising has, gas charging the system with existing Refrigerant gas, testing and commissioning complete all as specified and directed of the following capacity of AC plant :-Note : (i) Refrigerant gas paid and measured separately.(ii) The cost for the nitrogen gas shall be deemed to be included in the quoted rate. |
| 30 | Capacity 5.5 TR |
| 31 | S&F in repairs of following spares/ parts suitable for AC Plant (Make: Blue Box) of capacity 11 TR including commissioning and teting complete all as specified and directed :- |
| 32 | Wedge (V) Belts A -32 |
| 33 | Refrigerant gas R- 22 in manufacturer sealed cylinder. |
| 34 | Thermostatic Expansion valve. |
| 35 | Fan motor for outdoor unit . |
| 36 | Logical control board . |
| 37 | Nylon filters of size 21\" x 18\" inches and 10 micrones built with GI casing frame box type. |
| 38 | Thermostatic sensors. |
| 39 | Filter drier. |
| 40 | Temrature control. |
| 41 | HP/LP cut off switch MP-15 suitable for working on R-22 gas with flare nut. |
| 42 | S&F in repair of suction & discharge valve of compressor 5.5TR of capacity (Make:BOCK Compressor) by means of replacing the teflon washer sheet, suction & discharge valve ring, spring, \"O\" rings, gaskets etc complete and testing for proper holding of valve, leak testing etc complete all as specified and directed.Note: The unit rate quoted shall deemed to be include the costof suction & discharge valve and shall be considered as one job. |
| 43 | M&L for servicing/ overhauling including repairs and maintenance of Cooling tower of capacity 36 TR, water cooled chiller type Central AC plant by dismanlting/ taking down the CT fan motor of flange mounted extended type shaft upto 5 HP, 3 phase, 415volts, 50Hz along with fan assembly, and including cleaning & removal of scales, inspection, cleaning and replacement of PVC fills, PVC eliminator, FRP louvers, motor cover, splash cups etc complete including renewal of all corroded bolts & nuts, terminal block, and re-assembling, fixing in position, fixing of fan blade, and alignment of the fan blade for the suitable air throw of the cooling tower, painting with two coats of synthetic enamel paint over a coat of anticorrosive paint after preparation of surfaces, testing & commissioning the cooling tower motor complete all as specified and directed.Note:- (i) Spares/ parts will be measured and paid separately under relevant items.(ii) An inventory has to be prepared for defective parts and signed by Engineer-in-charge and contrctor while checking the worn out parts.(iii) The rates inclusive for all T&P, chemicals required for cleaning, FRP compound, nut bolts etc complete for keeping the cooling tower in operational condition. |
| 44 | M&L for Servicing of Air Handling Units (AHU) by removing the filter, vacuumising the filter, washing the filter and re-installing the cleaned filter, brush the cooling coil and spray the foam coil cleaner including rinsing of coil, alignment of shaft & motor, servicing of chilled water line strainer for the AHUs, tightening of terminals of motor, replacement of V belts, replacement of bearings complete all as specified anddirected of following capacity of AHU plant :- Note: The unit rate quoted shall deemed to include the cost of blowing out the dust, chemical cleaning by spraying the organic based scale removing agent(Vaniklin) at the appropriate ratio till removal of complete dust & scale deposits in the fin area of evaporator coil, flushing through for proper air flow across the coil, cleaning of expansion valve; greasing of blower motor, checking of electrical connection, cleaning of air filters,greasing of blower motor, replacement of unserviceable bearings, V belts,water drain lines, renewal of rusted sheet metal screws and testing & commissioning the unit. |
| 45 | Capacity 7000 CFM. |
| 46 | M&L for descaling of shell & tube condenser offollowing capacity at by circulating the descaling chemical (scale gun) (HCL acid) through condenser by pressure feeding method after disconnecting condenser water lines, and opening the end covers of both side, brushing condenser water tubing, removing the scales, normalising the copper surface circulation normalising agent and refixing all dismantled parts including replacement of gasket set complete all as specified and directed :- |
| 47 | 18 TR |
| 48 | M&L for dismantling the defective induction motor of following capacity of any make and class of insulation from foundation bed, disconnecting all electric supply connections, duly coupled with pump/ compressor and removing burnt out winding from stator/ rotor, rewinding with suitable gauge of super enamelled copper wire of approved make including insulation materials, varnishing, heating, greasing of bearings etc complete and re-assembling, testing and commissioning complete all as specified and directed :- Note : (i) Spares will be measured and paid separately under relevant items.(ii) An inventory has to be prepared for defective parts and signed by Engineer-in-charge and contrctor while checking the worn out parts.(iii) Transportation of pump to & from workshop deemed included in quoted rate. |
| 49 | 7.5 HP |
| 50 | 5 HP |
| 51 | 3 HP |
| 52 | S&F in repair of the following spares/ parts suitable for AC plants of capacity 5.5/ 11/ 18/ 36TR AC plant (Make- Carrier/Bluestar/ Voltas) including complete all as specified and directed :- |
| 53 | Solenoid pilot control valve coil assembly, 11 watt, 230 volt AC, type 6, size 2, as per OEM. |
| 54 | Water pressure cut out, 1 PSI or as per existing/ site requirement complete all as specified and directed. |
| 55 | LP/OP pressure gauge, dial size 4\" dia of rating 30 to 150 PSI suitable for working on R-404 gas complete with flare nut. |
| 56 | High pressure gauge, dial size 4\" dia of rating 0 to 300kg/cm2 suitable for working on R-404 gas complete with flare nut. |
| 57 | Oil pressure cut off switch, MP - 55 suitable for working on R-404 gas complete with flare nut. |
| 58 | Water pressure gauge dial size 4\" dia, 0-7 PSI rating. |
| 59 | Expansion valve including brazing, welding work. |
| 60 | Suction & discharge hydrant copper pipe line 32 mm dia and 1 mm thickfor Compressor and condensor including replacing the suction & discharge valve ring, adaptor, \"O\" rings, junction clip etc along with rubber insulation and necessary brazing. |
| 61 | S&F in repairs Direct on line (DOL) for motor starter rating AC-3 duty, 415 volt, 50 Hz, 3 phase supply suitable for 7.5 HP motorcomplete all as specified and directed. |
| 62 | S&F in repair for cast iron butterfly valve of size 65 mm dia flangedof class PN 1.6 conforming to IS - 780 complete with iron wheel head, stainless steel spindle and check nut, includingjointing material such as rubber insertionnutboltswashers etc complete all as specified and directed. |
| 63 | S&F in repairs for two core stranded copper conductor armoured cable 1100 V grade with and including rigid PVC conduit of 20mm dia and copper end terminals (ISI marked) complete all specials all as directed of following size :- |
| 64 | 16 Sqmm |
| 65 | 2.5 Sqmm |
| 66 | M&L forpreparation of old steel surfaces and applying one coat of synthetic enamel paint in position to allsurfaces for for following including base frames at pump houses of centrifugal / Monobloc pumps with and including writing the details complete all as specified and directed :- |
| 67 | Centrifugal pump sets. |
| 68 | Monoblock pump sets. |
| 69 | Compressor unit of 18 TR |
| 70 | Condensor unit of 18 TR |
| 71 | Main LT Panel board |
| 72 | Compressor LT Panel board |
| 73 | M&L for dismantling, carefully shifting and depositing of packages type AC plant of capacity 3x11TR to AGE E/M store yard from CG RHQ AC Plant by using of crane and vehcle without damage and comprising the followings complete all as specified and directed:-(a) Out door unit of 5.5TR - 06 Nos(b) Indoor Unit - 03 nos(c) LT Panel complete - 01 No(d) GI sheet ducting for supply and return of air, grills, defuse & return air boxing etc - 01 Set(e) Pipe lines - 03 Sets |