| 1 | Providing Scaffolding for vimanam raja gopuram with non flammebable materials wherever necessary for main form work and by providing coconut keeth as covering the areas & plat form for inspection etc all complete. |
| 2 | Vimanam Height upto 15\"-0\" |
| 3 | Providing vargapoochu over the core walls of vimanams/Gopurams,with Lime MORTAR 1:1.5 complete including Shaping the mukhapathram, mahanasi, koodu all ornamental works to proper shape by embedding broken bricks of shaped/chiseled bricks , rough plastering with Lime MORTAR 1:1.5 and finshing with final ornamental plastering nayam theervani including cost and conveyance of all materials, labour there fore lifting of materials, all working in heights curing with water etc complete including all extra for folding and including clearing from the vimanams/gopurams 100 sft superficial area |
| 4 | Vimanam/Gopuram upto 15\" - 0\" height |
| 5 | Painting with multicolour (panchavarnam) good emulsion paints complete for the vimanams/gopurams ,including cost and conveyance of all materials , labours charges including artist painter, working in heights, lifting of materials,cost of brushes etc, complete which including all extra for foldings 100 sft |
| 6 | Vimanam/Gopuram upto 15\" - 0\" height |
| 7 | Dismantling Lime Concrete (SOR - UC: W-0033, of Pg No 30) |
| 8 | Weathering course with brick jelly lime concrete using 20mm brick jelly with pure slacked lime over R.C.C. roof slab in the proportion of 32:12.5 and well watering consolidated with wooden beaters to slop including cost and conveyance of materials to site and labour charges etc |
| 9 | Finising the top of the roof with one course of pressed tiles of size 20X20X2cm over a bed of Combination mortor 1:1:3 12mm thick mixed with water proof compound at 2% b weight of cement including cost and conveyance of all materials to site and all labour charges etc |
| 10 | Restoration by providing herbal water wash and approrimats methodology to restore the originalities of the existing granite structure inclusive of hire charges scaffolding arrangements conveyance charges for tools & plants and machinaries to the workship spot and cleaning the site after completion of work etc |
| 11 | Pointing with Lime mortar 1:1.5 including all tools and plants and labour etc., all complete |
| 12 | Painting two coats over the new plastered surface with water based emulsion paint including the labour and materials charges etc complete complying the std speicification. |
| 13 | Supplying and fixing teak wood temple type door including all materials, labour charges for manufacturing and fixing I position including all furniture fittings etc complete with std specifications. |
| 14 | Painting two coats over New wood works using ready mixed enamel paint including cost and conveyance of paint and all labour charges etc complete |
| 15 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B |
| 16 | Supplying and Filling with foundation and basement with M sand in 15cm. Thick layers well rammed & consolidated, including watering, complying with std.specification etc complete. |
| 17 | Cement Concrete 1:5:10 (One Cement, Five sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and curing etc. complete complying with standard specification |
| 18 | Brick work in Cement Mortar 1:5 mix using country bricks 83/4\"x43/8\"x23/4\" size inculding curing, scaffolding etc. complete complying with std. specification |
| 19 | Plastering with Cement Mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc |
| 20 | Paving with cut stone flooring using cut stone of size 600 mm x 600 mm and 100 mm thick and all the sides are machine cutting, top surface is neatly dressed and pointing with lime mortar 1:1.5 including all materials and labour charges. |
| 21 | sub total |
| 22 | GST 18% Please Enable Macros to View BoQ information |