| 1 | Earth work in hard soil or gravelly soil with 50m initial lead and 1.5m initial lift including rought dressing and breaking clods to maximum 5cm 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per direction of the Engineer-In-Charge. |
| 2 | Filling in foundation and plinth with sand well watered and rammed including cost of all materials. |
| 3 | Cement concrete (1:3:6) with 4cm size granite metal per one cum. (P-43/3) |
| 4 | RCC work M-20 grade with 20mm and down grade black hard granite CB stone chips including hoisting and laying.(P-50/4) |
| 5 | Rigid and smooth centering and shuttering for RCC works including false work. Etc., complete. |
| 6 | Lintel |
| 7 | Supplying, fitting and placing uncoated of SAIL TMT BAR reinforcement complete as per drawing and specification. |
| 8 | Fly Ash Brick (23x11x8cm) size having crushing strength not less than 75kg/ cm2 with cement mortar (1:6) in foundation and plinth per cum. |
| 9 | Fly Ash Brick (23x11x8cm) size having crushing strength not less than 75kg/ cm2 with cement mortar (1:6) in foundation and plinth per cum. |
| 10 | 12mm thick plaster (1:6) for brick work. |
| 11 | 16mm thick plaster (1:6) for brick masonry or stone masonry. |
| 12 | 12mm thick plaster (1:4) for brick work with cement punning for skirting. Per Sqm |
| 13 | Painting two coats with approved paint on wood work & Iron work. (Old & New) |
| 14 | Priming one coat with any approved primer. (Iron Work) |
| 15 | Painting two coats with weather seal paint over a coat of primer including cost, conveyance all materilas, labour and T & P etc complete. |
| 16 | Plastic emulsion paint two coats of approved shade on new work. |
| 17 | Iron work wrought and put up in Trusses and record racks (labour only) per 1 Qntl. |
| 18 | Hoisting joints and trusses and placing in position (labour only). |
| 19 | Supplying and fixing of GCI Sheet (0.30mm thick ) in roof in roof drilling holes in windties including fixing of ridges valleys windties etc. including cost of fitting. |
| 20 | Supplying and fixing of AC Sheet in roof in roof drilling holes in windties including fixing of ridges valleys windties etc. including cost of fitting. |
| 21 | Supplying & Fixing of 80 mm thick factory made cement concrete interlocking paver block of M-30 grade made by paver block making machine with strong vibratory compaction of approved design and shape laid in required colour and pattern over 50 mm thick compacted bed of coarse sand, filling the joints with fine sand etc. all include cost, conveyance, royalty, taxes of all materias, labour T7p etc. complete as per direction of Engineer in Charge. |
| 22 | Display Board & Photograph Please Enable Macros to View BoQ information |