| 1 | Supply of Conventional type Fire Alarm Panel (Min 4 Zone ) with mounting accessories |
| 2 | Supply of Conventional type Fire detectors -Multi sensors(heat and Smoke) with base & mounting accessories |
| 3 | Supply of Conventional type Beam detectors with all associated accessories including power supply, RESET button & mounting accessories |
| 4 | Supply of Manual call point with mounting accessories |
| 5 | Supply of Sounder cum strobe with mounting accessories |
| 6 | Supply of 2x1.5sq.mm Cu FRLS armoured fire alarm cable |
| 7 | Supply of 6C x 2.5 mm², 650/1100 Volts grade XLPE Insulated copper conductor Armoured Control Cables |
| 8 | Supply of 10C x 2.5 mm², 650/1100 Volts grade XLPE Insulated copper conductor Armoured Control Cables |
| 9 | Supply of Junction Boxwith minimum 1.2 mm CRCA sheet steel, powder coated, IP-55 protection, including Rail mounted terminal blockswith 30 Connectors(Suitable for terminating 3 x6core cables & 1x 10 core cable and balance as spares) |
| 10 | Supply of HDPE pipe |
| 11 | Supply of GI pipe |
| 12 | Supply of PVC pipe |
| 13 | Supply of Installation & Terminationaccessories |
| 14 | Installation & termination of Conventional type Fire Alarm Panel (Min 4 Zone ) |
| 15 | Installation & termination of Fire detectors -Multi sensors(heat and Smoke) |
| 16 | Installation & termination of Conventional type Beam detectors with all associated accessories including power supply, RESET button & mounting accessories |
| 17 | Installation & termination of Manual call point |
| 18 | Installation & termination of Sounder cum strobe |
| 19 | Installation & Termination of Junction Box |
| 20 | Cable Laying and termination of 2x1.5sq.mm Cu FRLS armoured fire alarm cable as per scope of work |
| 21 | Cable Laying and termination of 6C x 2.5 mm², 650/1100 Volts grade XLPE Insulated copper conductor Armoured Control Cables as per scope of work |
| 22 | Cable Laying and termination of 10C x 2.5 mm², 650/1100 Volts grade XLPE Insulated copper conductor Armoured Control Cables as per scope of work |
| 23 | Termination,programing ,Testing and Commissioning of complete system as per scope of work |