| 1 | Cleaning of existing pond embankment using JCB with scarifying existing embankment Asper SOR 2022 page 170 |
| 2 | De-Watering:-Suplying all materials, labours, T&P, 5.00 HP Diesel Pump set with POL, Pump Operator etc. and De-watering the clear water/muddy water etc. all complete as per the required specification and direction of Engineer in charge |
| 3 | Deweeding:-Uprooting rank vegetation and weeds by digging the area to a depth of 60cm, removing all weeds and other growth roots by forking repeatedly beraking clods rough dressing flooding with water uprooting fresh growths after 10 to 15days and then fine dressing for planting new grass etc as per the required specification and direction of the Engineer-in -charge |
| 4 | De-Silting :-Excavation of any tpe of soil in approved borrow areaby mechanical means including into & transportion by mechanical means & unloading the soil within 1km on properly prepared & scentifically approved surface including spreading and levelling the earth in 22.5 cm layers to make ready for watering and compaction by mechanical means but excluding watering and compaction in dams and dykes for all heights including construction, maintenance, watering and lighting of haul road and borrow area etc. complete as per the required specification and direction of the Engineer-incharge. (measurement of the fill to be taken on the finished compacted section under OMC condition.) |
| 5 | Transporting the excavated clay soil from site to low laying area within 5km radious by mechanical carraiage etc comp deduct 25% for voids |
| 6 | Supplying all materials labour T&P, Excavation of any available type of soil by mechanical means loading into and transportation by mechanical means and unloading the soil within 1000m lead& the Pond Area on properly prepared and scientifically approved surface including spreading and levelling the earth in 22.5 cm layers to make ready for watering and compaction by mechanical means but excluding watering and compaction in dams and dykes for all heights including construction, maintenance, watering and lighting of haul road and borrow area etc. complete as per the required specification and direction of the Engineer-incharge. (measurement of the fill to be taken on the finished compacted section under OMC condition.) |
| 7 | Supplying all materials labour T&P, Watering earthwork upto OMC condition and compaction by Mechanical means in layers not exceeding 22.5Cm to 95% dry density including hire and running charges of all the Machineries etc complete as per the required specification and direction of the Engineer-in - Charge Length including Lagoon (AoR-2006, Page no-12, item No.2) |
| 8 | Supplying all materials labour T&P, Excavation of any available type of soil by mechanical means loading into and transportation by mechanical means and unloading the soil within 1000m lead& the Pond Area on properly prepared and scientifically approved surface including spreading and levelling the earth in 22.5 cm layers to make ready for watering and compaction by mechanical means but excluding watering and compaction in dams and dykes for all heights including construction, maintenance, watering and lighting of haul road and borrow area etc. complete as per the required specification and direction of the Engineer-incharge. (measurement of the fill to be taken on the finished compacted section under OMC condition.) |
| 9 | Earth work in all kinds of soil for making trench to lay Hume Pipe conduit within 50 Mtr initial lead and 1.5 mtr initial lift including rough dressing the bed as per the required specification and direction of the Engineer in charge |
| 10 | Providing and Laying (to level or slopes) and jointing with rubber rings pre-cast reinforced socket and spigot concrete pipes Class NP-3 of the following diameters conforming to IS:458 - 2003 suitable for rubber ring roll on joint of the following internal diameter as per specification complete. (Earthwork in trenches to be measured and paid for separately) as per the specification and direction of the Engineer-in -charge. 600mm dia |
| 11 | Supplying and fixing of Rough Stone dry packing in approns and revetments with hard granite stones of minimum 30 cm size and above, all complete including all cost, conveyance, taxes of all materials and labour etc all complete as per the required specification and direction of the Engineer-in- Charge (AoR-2006, Page no-79, item No.15) |
| 12 | Horticulture (Elephant Ear, Canna Indica, Wedelia, Vetiver Grass):- Supplying all materials labour and T&P etc. for removing vegetation and making up undulations not exceeding 15cm. in depth including disposal of rubbish, plantation of saplings - a) Bougainvillea Glabra @ 1 No. / sqft., ii) Elephant Ears Plant @ 1 Nos. / 3 sqft., iii) Canna Indica @ 1 Nos. / 2 sqft., iv) Wedelia Plantation @ 1 No. / 2 sqft. and v) Vetiver Grass - spread across the area, all complete as per the specification and direction of Engineer-in-Charge. |
| 13 | Pathway:- Earth work in excavation in Ordinary soil for foundation trenches to a depth of 300mm including fine dressing and leveling the bed depositing the excavated earth/soil within initial lead of 50m and initial lift of 1.5m etc all complete as per the required specificaton and direction of Engineer In Charge. |
| 14 | Providing, laying, spreading and compacting graded stone aggregate to with Wet Mix macadam .specification including premixing the material with water at OMC in mechanical mix plant , carriage of mixed material by tipper to site, laying and spreading in uniform layers with paver in sub base/ base course on well prepared surface and compacting with vibratory roller to achieve the desired density complete as per Clause 406 of MoSRT&H Specifications for Road & Bridge works (4th Revision) including all cost, conveyance, taxes of all materials and labour etc all complete as per the required specification and the direction of the Engineer-in- Charge |
| 15 | Supplying and filling in foundation and plinth with good quality river sand well watered and rammed, including all cost, conveyance, taxes of all materials and labour etc all complete as per the specification and direction of the Engineer-in- Charge ( Measurements will be taken on finished compacted section) |
| 16 | Supplying all materials, labour and T&P for laying, fitting & fixing 60mm thick Cement Concrete inter locking paver blocks of M 30 grade of approved make, design, colour and size made by block making machine with proper compaction by mechanical means , cutting of paver blocks as per required size and pattern and laying the blocks in required pattern over the prepared hard base surface , finishing and sweeping extra sand in pathway including all cost, conveyance, taxes, royalities of all materials and T&P etc all complte confirming to IRC:SP-63:2018 and its ammendments if any etc all complete as per the required specifications and directions of the Engineeer-in- Charge. |
| 17 | Kerb Stone: Supplying all materials, labour T&P andfitting and fixing of pre cast cement concrete kerb stone of size 300 x 300 x 150mm of M30 grade concrete of approved make, Design,colour and size made by block making machine with proper campaction fixed in required patern etc complete in all respect conforming to IS 5758:1984 etc all complete as per the required specification and direction of the Engineer In Charge. |
| 18 | Earth work in excavation inall kinds of soil for foundation trenches to a depth of 300mm including fine dressing and leveling the bed depositing the excavated earth/soil within initial lead of 50m and initial lift of 1.5m etc all complete as per the required specificaton and direction of Engineer In Charge. |
| 19 | Supplying and filling in foundation and plinth with good quality river sand well watered and rammed, including all cost, conveyance, taxes of all materials and labour etc all complete as per the specification and direction of the Engineer-in- Charge ( Measurements will be taken on finished compacted section) |
| 20 | CC (1:4:8) using CBHG metal including cost & conveyance of material etc comp |
| 21 | Brick masonary using fly ash brick including cost & conveyance of material in cm (1:6) F&P |
| 22 | Brick masonary using fly ash brick including cost & conveyance of material in cm (1:6) super structure |
| 23 | 12mm thick CP (1:6) over brick masonary etc comp. |
| 24 | 16mm thick CP (1:6) over brick masonary etc comp. |
| 25 | Painting two coat using weather coat paint over one coat of primeretc comp. |
| 26 | CCM20using 20mm CBHG chips down graded including cost & conveyance of material etc comp |
| 27 | Rigid smooth centering & shuttering of CC & RCC works including cost & conveyance of material etc comp |
| 28 | Taking premeasurement before excavation & final measurement after excavation of water body completed using total station payment will be done as per provision of voucher which should not be more than estimated amount. |
| 29 | Provision for Sign board and Photography LS Please Enable Macros to View BoQ information |