|
| 1 | Scraping of moss, blisters etc.thoroughly exterior surface of walls necessitatingthe use of scraper, wire brush etc.(Payment against thisitem willbemade only when thishasbeen done onthe specific direction of the Engineer-in-charge) |
| 2 | Stripping off worn out plaster and raking out jointsofwalls,celingsetc.uptoanyheightandin any floor including removing rubbish within a lead of 75m as directed.GroundFloor |
| 3 | SurfaceDressingofthegroundinanykindofsoil% including removing vegetation inequalities not exceeding15cmdepthanddisposaloftherubbish within a lead upto 75 m as directed |
| 4 | Dismantlingall types of plain cement concrete works, stacking serviceable materials at site and removingrubbishasdirectedwithinaleadof75 m.upto150mm |
| 5 | Dismantlingcarefullywoodworkinposts,postplates,rafters,partitionetc.,sortingandng thebottom, bailing out water as required complete. |
| 6 | LabourforChippingofconcretesurfacebeforetakingup Plastering work. |
| 7 | Plaster(to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed andraking out joints including throating, nosing and drip course, scaffolding/staging where necessary.[Excluding cost of chipping over concrete surface](i)With1:6cementmortar |
| 8 | Labour for taking out door and window frame including shutter for repair or replacement of different parts of the frame & refixing the same including mending good all damaes complete. (Concrete and brick work for mending damage will be paid separately) D1 |
| 9 | UPTO 2.5 m2 |
| 10 | Wood workindoorandwindow frame fitted andfixedin position complete including aprotective coat ofpainting at the contact surface of the frameSaI:Siliguri |
| 11 | Panelshuttersofdoorandwindow,asperdesign(eachpanel consistingofsingleplankwithoutjoint),includingfittingand fixingthesame inpositionbutexcludingthecost ofhinge and other fittings.Ingroundfloor.Shutterwith25mmthickplanks, 19mm thickbattens. Sishu,Gamar,Champ,Badam,Bhola,Morga,Hallak |
| 12 | Supplying,fittingandfixingM.S.clampsfordoorandwindow framemadeofflatbentbar,endbifurcated with necessary screws etc.bycement concrete(1:2:4)asperdirection. (Costof concrete will be paid separately)(b)40mmX6mm,250mmLength |
| 13 | Ironbutthingesofapprovedqualityfittedandfixedwithsteel screws, with ISI mark.100mm.X50mm.X1.25mm. For Door& WINDOW |
| 14 | Ironsocketboltofapprovedqualityfittedandfixedcomplete.300mmlongx10mmdiabolt |
| 15 | Ironhaspboltofapprovedqualityfittedandfixedcomplete (oxidised)with16mmdiarodwithcentreboltandFOUT1dfitting |
| 16 | Irondoorhandleofapproved qualityfittedandfixedcomplete |
| 17 | M.S.orW.I.Ornamentalgrillofapproveddesignjointscontinuouslyweldedwlth M.S,W.I.Flatsandbarsofwindows,railingetc.fittedandfixedwithnecessary screws andlugs in ground floor |
| 18 | Paintingwithbestquality syntheticenamelpaintofapprovedmake andbrandinduding smootheningsurface bysandpapering etc. indudingusingofapprovedputtyetc.onthesurface,Ifnecessary:(a)Ontimberorplasteredsurface:W\"ithsupergloss(hi-gloss)-(exceptwhite in shade) |
| 19 | Primingone coat on timber orplastered surface with synthetic oil bound primerofapprovedqualityincludingsmootheningsurfacesbysandpapering etc.On timbersurface |
| 20 | Applying teriorgrade AcrylicPrimerofapproved qualityandbrand on plastereder cencrete surface old or new surface to receive Distemper/ Ac c emulsion paint including scraping and preparingthesurfacethrougMy,completeaspermanufacturer\"sspecification andas per direction of the EIC.{In Ground Floor)TwoCoatSolventbasedinteriorgradeAcrylic PrimerGroundfloor |
| 21 | ApplyingAcrylicEmulsion Paintofapprovedmakeandbrandonwallsandceilingincluding sandpapering inintermediate coatsincluding putty(to be done under specific instruction of Superintending Engineer): |
| 22 | ProtectiveandDecorativeTextured exterior highclass matt finishpaintof approvedquality,composedofspecialTharmoplasticResincontainingfinecrystallineadditivesderivefromGraniteaspermanufacturer\"sspecificationandasperdirection ofEICtobeapplied overacrylicprimerasrequired. Therateincludescostofmaterial, labour,SCaffoldingandallincidentalchargesbutexcludingthecostof primer.TwoCoat |
| 23 | SupplyingbestIndiansheetglasspanessetinputty andfittedandfixed with nailsandputty complete. (Inallfloors forinternal wall &upto 6mheightforexternalwall) 4 mm thick |
| 24 | Supplying,fittingandfixing18mm.to22mm.thickkotastoneslabinwall,dado in 15 mm thick [avg] cement mortar (1:3) including making suitable arrangement to hold the stone properlybybrass/copperhooksincludingpointingincement mortar (1:2) (1cement : 2marble dust) with admixture of pigments matching the stone shade, including grinding and polishing allcomplete as per direction ofEngineer-in-charge including cost ofmaterials, labour, scaffolding,staging,curingcomplete.[Usingcementslurryforbedding @4.4kg/Sq.mandfor jointing @1.8 kg/Sq.m] |
| 25 | TREAD AND RISE |
| 26 | Supplying,fittingandfixing8mmthickLeiylnatedwooden FlooringWorkconformingtoEN13329:2006wlthplank size notlessthan1200mmX190mm (wlthunIlIn/tongue-groove lockingarrangement)having0.2mmthktopabrasivelayer overadecorativelayerfollowedbyaHigh-densityflbreboard (HDF)havingdensity>8S0 kg/m3substratecoreoverarasln saturated backing layerandinstallingthroughunlllnor tongue- groove system(having lockingstrength notlessthan1000kg/m)overa2mmthkunderlayerpolyurethenefoamon polythenesheet250micron,overasmooth,flat, hard subfloor |
| 27 | ProvidingandfixingoffalseceilingwithpowdercoatedexposedG.I.grid suspensionsystem(E-GridT2430orequivalentloadcarryingcapacitywithmid spandeflectionnotexceeding1/360spanwithhangerspacingof1200mm c/c) consistingofMainRunner3600mmlong,Cross Tee1200 mm/600mmlongand WallAngle. The WallAngleshallbefixedonPVCDashFasteners ontheperimeterofthewallbysteelscrewswithdistance300mmc/[email protected] Tee1200mmwillbeinsertedinthepre-cut slots ofMainRunnerataregularinterval of600 mm to form amodular grid of 1200mmX600mm. Additional Cross Teesof600 mmshallbe placed .. |
| 28 | Supplying,fiRing&fixingZn-AIalloy(SSBAI&45BZn) coatingof150gramspersq.metre(Allowedbycolour coatedon both side) steel sheet work having mlnlmumyield sten@hofSSOMpaoftrapizoidalprofileofapproved make (excludingthesupportingframework)fittedandfixedwith 55mm&25mmselftappingscrew,EPDMWasher16mm dia&3mmth.washer etc.completewith150mmendlap |
| 29 | Supplying,fiRing&fixingZn-AIalloy(SSBAI&45BZn) coatingof150gramspersq.metre(Allowedbycolour coatedon both side) steel sheet work having mlnlmumyield sten@hofSSOMpaoftrapizoidalprofileofapproved make (excludingthesupportingframework)fittedandfixedwith 55mm&25mmselftappingscrew,EPDMWasher16mm dia&3mmth.washer etc.completewith150mmendlap |
| 30 | Providing and fixing sign board Please Enable Macros to View BoQ information |