|
| 1 | work detial |
| 2 | Earth work in foundation excavation up to1.5m, ramming bottom, dressing sides, back filling and disposal of surplus soil with in a lead of 50m. |
| 3 | Cement concrete in foundation and plinthwith stone ballast size 40mm including curing and compaction etc in 1:4:8 mix |
| 4 | Brick work in foundation and plinth using bricks of class designation-75 in CM 1:6 |
| 5 | Damp proof course with RCC 1:1.5:3 mix |
| 6 | Brick work in super structure using bricksof class designation-75 in CM 1:6 |
| 7 | S/F Steel Girdur Including cutting Hosting and Fixing in Position |
| 8 | S/F Stone sriwan |
| 9 | S/F Stone Slab |
| 10 | P/L Brick bat on roof in cm 1:4 |
| 11 | S & F Mosaic tiles on roof |
| 12 | Reinforced cement concrete work includingcuring compaction, finishing with renderingin cement sand mortar 1:3 and making good and joints excluding cost of centering, shuttering and reinforcement in 1:1.5:3(1cement: 1.5course sand: 3-graded stoneaggregate 20mm nominal size) |
| 13 | Providing and fabricating reinforcement forRCC work including straightening, cutting,bending, placing in position and binding(including cost of binding wire) in foundation and super structure up to 4.5m height above plinth level hot rolled deformed (IS: 1139) cold twisted (IS: 1786) |
| 14 | Centering and shuttering with plywood orsteel sheets including strutting, propping,bracing both ways with wooden membersand removal of from work |
| 15 | 20mm thick plaster on new work includingcuring and racking of joints in CM 1:6 |
| 16 | Providing and applying white cement based putty over plastered surface to prepare the surface even and smooth complete (PWD BSR-2022 - Less-10%) |
| 17 | Finishing walls with Acrylic Smooth exteriorpaint of required shade including all caffolding.New work ( Two or more coatincuding base coat of water proofing cement paint) -(PWD BSR -2022 Less-10%) |
| 18 | Wall painting with plastic emulsion paint ofrequired shade including all scaffolding.New work ( Two or more coat incuding base coat of water proofing cement paint) -(PWD BSR-2022 Les-10%) |
| 19 | S & F iron door |
| 20 | S & F iron Window |
| 21 | Enamel painting on door and window |
| 22 | Earth work in filling with ordinary soil |
| 23 | Carriage of earth-lead Two KM |
| 24 | Cement concrete in floor with stone ballastsize 40mm including curing and compaction etc in 1:6:12 mix |
| 25 | S & F Kota Stone |
| 26 | Yojna board & Contingency charges Please Enable Macros to View BoQ information |