| 1 | work detial |
| 2 | Earth work in foundation excavation up to 1.5m, ramming bottom,dressing sides, back filling and disposal of surplus soil with in a lead of 50m. |
| 3 | Cement concrete in foundation and plinth with stone ballast size 40mm including curing and compaction etc in 1:4:8 mix |
| 4 | Reinforced cement concrete work including curing compaction, finishing with rendering in cement sand mortar 1:3 and making good and joints excluding cost of centering, shuttering and reinforcement in 1:1.5:3 (1cement: 1.5course sand: 3-graded stone aggregate 20mm nominal size) |
| 5 | Providing and fabricating reinforcement for RCC work including straightening, cutting, bending, placing in position and binding (including cost of binding wire) in foundation and super structure up to 4.5m height above plinth level hot rolled deformed (IS: 1139) cold twisted (IS: 1786) bars |
| 6 | Centering and shuttering with steel sheets including strutting, propping, bracing both ways with wooden members and removal of from work |
| 7 | Add extra for shuttering in circular work in plan upto 10mm dai 20% extra PWD bsr -2022 |
| 8 | Providing and applying white cement based putty over plastered surface to prepare the surface even and smooth complete (PWD BSR- 2022 - Less-10%) |
| 9 | Finishing walls with Acrylic Smooth exterior paint of required shade including all scaffolding.New work ( Two or more coat incuding base coat of water proofing cement paint) -(PWD BSR -2022 Less - 10%) |
| 10 | Providing and fixing steel gate, gratings and grills made of angles, tees, square bars or other flats, black pipes with hold fast and fittings complete as per design including cutting, welding and fabrication with priming coat of red oxide. |
| 11 | Enamel painting on door |
| 12 | Earth work in foundation excavation up to 1.5m, ramming bottom, dressing sides, back filling and disposal of surplus soil with in a lead of 50m.In hard soil |
| 13 | Brick work in foundation and plinth using bricks of class designation-75 in CM 1:6 |
| 14 | Brick work in super structue using bricks of class designation-75 in CM 1:6 |
| 15 | 20mm thick plaster on new work including curing and racking of joints in CM 1:6 |
| 16 | Providing and applying white cement based putty over plastered surface to prepare the surface even and smooth complete |
| 17 | Finishing walls with Acrylic Smooth exterior paint of required shade including all scaffolding.New work ( Two or more coat incuding base coat of water proofing cement paint) -(PWD BSR -2022 Less-10%) |
| 18 | Yojna board & Contingency charges Please Enable Macros to View BoQ information |