Sales : +91-777 804 8217
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 27-01-2026 | CORRIGENDUM No 3 | Date | 09-02-2026 |
| 2 | 21-01-2026 | revised drg | Other | 02-02-2026 |
| 3 | 21-01-2026 | Amended Tender pages | Other | 02-02-2026 |
| 4 | 21-01-2026 | CORRIGENDUM No 2 | BOQ | 02-02-2026 |
| 5 | 21-01-2026 | Date Amenment No1 | Date | 02-02-2026 |
| Sl. No. | Item Description |
| 1 | Total amount ofSchedule \"A\" PART-I (BUILDING WORK) |
| 2 | Total amount ofSch \"A\" PART-II (Section-I)(INTERNAL WATER SUPPLY WORKS) |
| 3 | Sch \"A\" PART-II (Section-II) (INTERNAL WATER SUPPLY WORKS)Note : This schedule is not pre priced by MES and the pre priced rate indicated as \"Rs. 0.00\" under Col.5 signifies this fact only. |
| 4 | M & L for 15mm dia 2 way bib tap with wall flange and aerater chromium plated fancy type with crrutch or butter fly handle, screwed down screwed for iron pipe or brass ferrule and fixed complete all as specied and as directed. |
| 5 | S & F for brass chromium plated wall mixer (3 in 1) for mixing hot and cold water screwed down iron for iron pipe 15mm bore complete all as specified and as directed. |
| 6 | S & F for 15mm dia swan neck taps fancy typefor sink, cost copper alloy with crutch or butter fly handle, screwed down screwed for iron pipe or brass freeule and fixed complete all as specied and as directed. |
| 7 | Total amount ofSchedule \"A\" PART-II (Section-II) (INTERNAL WATER SUPPLY WORKS) |
| 8 | Total amount ofSch \"A\" PART-III (SECTION-I) (INTERNAL ELECTRIC SUPPLY WORKS) |
| 9 | Sch \"A\" PART-III ( Section-II)( INTERNAL ELECTRIC SUPPLY WORKS)Note : This schedule is not pre priced by MES and the pre priced rate indicated as \"Rs. 0.00\" under Col.5 signifies this fact only. |
| 10 | Supply and fix Ventilair DSP Metal Domestic Exhaust Fan 230 MM Sweep complete all as specified and directed |
| 11 | S & F LED Light 10 Watt complete all as specified and directed |
| 12 | S & F LED Footlight 3 Watt complete all as specified and directed |
| 13 | Supplying and installing of 900 mm width x 62.5 mm depth X 2.0mm thickness perforated painted with powder coating M.S. cable trays with perforation not more than 17.5%, in convenient sections, joined with connectors, suspended from the celing with M.S. suspenders including bolts & nuts, painting suspenders etc as required complete all as specified and directed |
| 14 | S & F sheet metal enclosure MCB distribution board Vertical Triple pole and neutral 6 way sheet metal enclosures Double door complete all as specified and directed |
| 15 | S & F sheet metal enclosure MCB distribution board Single pole and neutral 6 way sheet metal enclosures Double door A9HSND06 complete all as specified and directed |
| 16 | Supplying and fixing three phase four wire dual source smart energy meters BIS 16444 marked in Meter panel with pre payment capacity touch keypad based digital having current range 10-60 Amp 415 Volt accuracy class 1.0 alongwith parallel home display split unit with inbuilt load control switch containing provision for TOD and RTC, inbuilt feature to sense the DG mode through PLSI, dual source registration wrt grid as well as DG supply and dynamic load allocation facility from grid and DG, capable to define for tariff slabs, happy hours and holiday definition complete all as specified and directed. (For Dwelling unit & Common area) complete all as specified and directed |
| 17 | Supply, install, testing and commissioning of LT meter panel board wall mounted indoor type, TTA approved, platform mounted factory made, totally enclosed dust and vermin proof openable from both front and rear side made out of 2mm thick CRCA MS Sheet and built uponn suitable size angle iron frame work, having front and rer hinged doors, lifting lugs (2 nos), earthing strips at rear side, bottom detachabl gland plate complete with suitable size xzinc plated and passivated nut, bolts, spring and washers. The cabinet and all members should be chemically treated with MSR Solution for anticorrosive treatment and apply spray paint with two coat of synthetic enamel paint over a coat of red oxide primer. The panel should be suitable for 415 volts, 50Hz, 3 phase 4 wire system and internal connection should be provided with copper strips of suitable size. 04 Nos copper bus bar 200Ampsand necessary foundation work and comprising following :-(a) Incoming MCCB, 4pole, 160 Amps, 415 volt AC, 35 KA rupturing capacity - 01 No.(b) Outgoing MCB, TPN, 63 Amps, 415 Volt AC, 16KA rupturing capacity-24 Nos.(c) Voltmeter, Ammeter, 3 Phase with selector switch and with necessary CTs - 01 No. |
| 18 | Total amount ofSch \"A\" PART-III (Section-II) (INTERNAL ELECTRIC SUPPLY WORK) |
| 19 | Total amount ofSch \"A\" PART-IV (SITE CLEARANCE, EXCAVATION & EARTH WORKS) |
| 20 | Total amount ofSch \"A\" PART-V ( SECTION-I ) ( ROAD/PATH/CULVERT ) |
| 21 | Sch \"A\" PART-V ( SECTION-II ) ( ROAD/PATH/CULVERT )Note : This schedule is not pre priced by MES and the pre priced rate indicated as \"Rs. 0.00\" under Col.5 signifies this fact only. |
| 22 | M & L for applying retroreflective thermoplastic road marking paint white or yellow with reflective glass sign beads @250 gms/Sqm area confirming to BIS specifications for lines, dashes or arrows , letters etc over bituminous surfaces/ pavements new or old , exceeding 10cm width applied by machine as per manufacturers instruction complete all as specified and directed. |
| 23 | M & L for80 mm thick Machine pressed colouredprecast cement concrete interlocking paver block with rubber moulded of 10mm thick with glossy finish of any shape and sizsas directed, confirming to IS 15658-2006, M-40Grade as in floor etc. set and jointed with graycement andpigmentcomplete all as specified and directed. |
| 24 | Total amount of Sch \"A\" PART-V ( SECTION-II ) ( ROAD/PATH/CULVERT ) |
| 25 | Total amount ofSch \"A\" PART-VI (SECTION-I)(SEWAGE DISPOSAL WORKS ) |
| 26 | Sch \"A\" PART-VI (SECTION-II)(SEWAGE DISPOSAL WORKS ) Note : This schedule is not pre priced by MES and the pre priced rate indicated as \"Rs. 0.00\" under Col.5 signifies this fact only. |
| 27 | S & FHDPE DWC ( double wall corrugated ) pipes confirming to IS - 16098 of 152 mm & 180 mm internal & external dia respectively . Presure rating SN-8fixed with rubber seal and copler required with and including suitable bends 90/60/45 degree etc single Y junctioncomplete as required fixed as per manufacture instruction laid in trenches for sewage line all as specified and directed . NOTErates includedfor pipes , bendsany size , types Y junctions copler/ adptor etc required and net total length of pipe with fittings shall be measured for payment purpose complete all as specified and directed. |
| 28 | Total amount of Sch \"A\" PART-VI (SECTION-II)(SEWAGE DISPOSAL WORKS ) |
| 29 | Total amount ofSch \"A\" PART-VII (AREA DRAINAGE) |
| 30 | Total amount ofSch \"A\" PART-VIII(SECTION-I) (FENCING AND GATE ) |
| 31 | Sch \"A\" PART-VIII (SECTION-II)(FENCING AND GATE ) Note : This schedule is not pre priced by MES and the pre priced rate indicated as \"Rs. 0.00\" under Col.5 signifies this fact only. |
| 32 | M&L for steel gate 3.50m wide and 1.50m height and including RCC column, excavation, Plaster, white wash to column and painting to steel gate, fixing of hinges etc. as per sheet No 1/3 of TD No CEAF/TD-56/03 complete all as specified and directed by Engineer-in-charge. |
| 33 | Total amount ofSch \"A\" PART-VIII (SECTION-II)(FENCING AND GATE ) |
| 34 | Total amount ofSch \"A\" PART-IX (Section-I)(FIRE FIGHTING) |
| 35 | SCHEDULE `A\" PART-IX (SECTION-II) (FIRE FIGHTING ) Note : This schedule is not pre priced by MES and the pre priced rate indicated as \"Rs. 0.00\" under Col.5 signifies this fact only. |
| 36 | Supply, install, testing and commisioning of Common Control Panel suitable for 1 no. of Electric Motor Driven Hydrant Of Main pump. With VF drive and Soft start with all Protection Like, Over load, Underload, dry run etc. complete all as specified and directed. |
| 37 | S&F ofperforated G.I. sheet cable tray of size 150 x 50mm with necessary angle iron suspension supports ,anchor fasteners etc. complete all as specified and directed. Note:- Maximum height of suspension shall not exceed 500 mm. size of the tray shall be suitable for laying the above mentioned cables. |
| 38 | S & F of Butterfly valve (Wafer Type) of following sizesconforming to I.S:13095 class PN 1.6 having S.G iron Body and S.S 304 disc, PTFE Bush, Nitrile rubber O ring and Carbon steel Flow Control lever etc complete all as specified and directed of following specified sizes:- |
| 39 | (a) 100 mm dia. |
| 40 | (b) 65 mm dia. |
| 41 | Supply, install, testing and commisioning of Forged Brass Air Release Valve of size 25mm dia confirming IS 554,with polypropylene float, forged brass seat and chamber, stainless steel spring, nitrile rubber ring etc.SIZE-25MM complete all as specified and directed. |
| 42 | Fire Hydrant and Sprinkler Accessories |
| 43 | S & F ofSS single headed ISI marked oblique pattern hydrant landing valves as per IS: 5290 with 80 mm dia flanged inlet & 63 mm dia female outlet complete with gun metal cap complete all as specified and directed. |
| 44 | Supply, install, testing and commisioning of following Fire Extinguishers complete all as specified and directed. |
| 45 | (a) Multi Purpose ABC typeCapacity changed to 6 Kgs as per New IS: 15683:2006 |
| 46 | (b) Dry Chemical Powder\" Fire extinguishers of 4.5 Kgs. As per IS: 2171:1999 |
| 47 | (c) CO2\" type fire Extinguisher of 4.5 Kgs. As per IS:2878:2004 |
| 48 | Supply, install, testing and commisioning 25 mm dia Inspection & Testing assembly for sprinkler drain systemwith thread ended forged bronzevalve and sight glass valve with union and necessary fittings complete all as specified and directed. |
| 49 | Providing AUTOGLOW Signage in Block / Small Letters of following specified Sizes:- |
| 50 | (a) Fire lift size: 4\" X 12\" |
| 51 | (b) Emergency exit size: 4\" X 12\" |
| 52 | (c) Fire Hydrant: 4\" X 12\" |
| 53 | (d) Fire Hose Reel: 4\" X 12\" |
| 54 | (e) \"DCP\" Extinguisher: 8\" X 4\" |
| 55 | (f) \"CO2\" Extinguisher: 8\" x 4\" |
| 56 | (g) In case of Fire, do not use lift, use staircase: 8\" x 8\" |
| 57 | (h)Flow Arrow DirectionsSign |
| 58 | (i) Fire pumps names & details flow rate etc, comp |
| 59 | (j) Other Sign Board as per fire Noms |
| 60 | PA SYSTEM |
| 61 | Supply and laying of 2C x 1.5 Sqmm copper wire with 20 mm PVC conduit with all accessories like elco, bend etc in recessed or surface complete all as specified and directed. |
| 62 | M&L forFIRE ALARM PANEL - 2 ZONE complete all as specified and directed. |
| 63 | M&L forMANUAL CALL POINT complete conventional type all as spcefied and directed. |
| 64 | M&L forelectric hootercomplete all as specified and directed. |
| 65 | Total amount ofSCHEDULE `A\" PART-IX (SECTION-II) (FIRE FIGHTING) |
| 66 | Total amount ofSch \"A\" PART-X(LIGHTENING PROTECTION ) |
| 67 | Total amount ofSch \"A\" PART-XI (PVC CONDUITS ) |
| 68 | Total amount ofSch \"A\" PART-XII (SECTION-I)(LIFTS) |
| 69 | Sch \"A\" PART-XII (SECTION-II)(LIFTS)Note : This schedule is not pre priced by MES and the pre priced rate indicated as \"Rs. 0.00\" under Col.5 signifies this fact only. |
| 70 | Supply, testing and commissioning of outdoor weather & dust vermin proof L.T Panel board factory fabricated indoor cubicle type totally enclosed with outer sheel shall be made out of 3.15 mm thick sheet & MS angle section of suitable size for frame, factory fabricated, compartmentalized inner shell shall be made of out of 2.0 mm thick sheet. The panels must be design and verified as per the IS/IEC 61439-01 & 2 with complete type test certificates for conformance to IS/IEC 61439-1 and 2, with 65 KA 1 sec along with MCCB mounted in switch boards with aluminium bus bars as mandatory as conformed to IEC 61641 with internal arc containment fault level of 65 KA/03 Sec and shall be suitable for seismic zone III/IV Zone including the type test conducted at ERDA/CPRI for seismic test. All MCCB/ACB panel should be single tier for easy cable termination. Cable termination space should be adequate to safely gland and terminate al/cu cables for the given current ratings with From B separation for incoming MCCB/ACB feeders and For outgoing MCB feeders. The Switch board cubicles shall have steel frame work enclosed on all sides and top by CRCA sheet steel of Minimum 2.00 mm thickness. The panel shall have integral base frame of 100 MM ISMC base channel, removeable undrilled gland plates shall be fitted for bottom cable entry and making connections, earth work and PCC foundation complete comprising of the following and specified herewith:-(i) Rectangular Aluminium bus bar fixed on insulated mounting arrangement 200 Amps current rating – 04 Nosprovided with heat shrinkable sleeve not less than one mm thick.(ii) Cable alley for 01 I/C and 03 outgoing feeders.(a) incoming (i) MCCB 125 Amps Icu=25 KA at 415 Volts with microprocessor release type-01 No (I/C). ICs=100% Icu and classII front face, isolation with positive break indication with double break contracts, standardextended rotary handle, spreaders, phase barrier etc.(ii) Ammeter digital type 0 to 500 A -1Nos(iii) Voltmeter digital type 0 to 500 V- 1 Nos(iv) Three way selector switch for current- 1 Nos (v) Three way selector switch for voltage – 1 Nos(vi) Phase indicating RYB light LED type – 01 Nos (vii) Suitable CTs of cast resin type with necessary CT short linking should be provided- 1 set |
| 71 | Item 30.05 Cont.. (b) outgoing(a) MCCB Four pole 63 amps Icu=16 KA at 415 volts, adjustable type 01 No (O/G). It should be with adjustable over load setting Ir = (0.8 to 1.0) x In, Tcs = 100% Icu and with adjustable thermal setting Class II front face with positive break indication with double break contacts, standard extended rotary handle, spreaders, phase barrier etc (ii) MCCB Four pole 40 amps Icu=16 KA at 415 volts, adjustable type with thermal magnetic release -02 No (O/G) (1 W+1S). It should be with adjustable over load setting Ir = (0.8 to 1.0) x In, Tcs = 100% Icu and with adjustable thermal setting Class II front face with positive break indication with double break contacts, standard extended rotary handle, spreaders, phase barrier etcAll accessories prewired with suitable size copper wire with stand high temperature, housed in cubical panel made out of standard MS sheet factory made duly powder coated front and rear door open able with locking arrangement complete with foundation as required or recommended by manufacturer Note:Main aluminium busbars with 0.8 Amps /sqmm current density & all internal wiring with copper FRLS wires and connections. All MCCB’s are microprocessor/Thermal Magnetic based (Icu= Ics-=100%) as given in Sld, housed in separate compartments, enclosed on sides, with rotating handle. All MCGB Icu= 10KA where not given/mentioned in sld.Earthing all components, frame etc. to a common internal earth bar.Painting all sheet metal work support structure etcAll accessories & supporting structure (Hot Dip Galvanised).The panel shall be with galvanized MS mounting base frame & the height shall not exceed more than 2100mm.The panel shall be prewired, ready for External Cable terminationAll Gland plate’s shall be 3 mm thick removable type.All the CT’s shall be cast resin type, with necessary CT shorting link.The panel shall be in convenient sections suitable for transportation, erection & have sufficient space for incoming & outcoming cable terminations.The panel incomers/outgoings shall have potential free contract. |
| 72 | Item 30.05 Cont.. 3 mm thick acrylic sheet shall be provided on the top of all outgoing termination sections, for protection against live terminalsAll the panel incomers/outgoing shall be tagged with aluminium anodized engraved name plates (Detailed tag of the feeders will be given during the final approval of panel drawings)Vendor shall arrange to configure/check/set all the meters once the panel is completely installed & in operations at site |
| 73 | Total amount of Sch \"A\" PART-XII (SECTION-II)(LIFTS) |
| 74 | Total amount ofSch \"A\" PART-XIII (HOT WATER SUPPLY) |
| 75 | Total amount ofSch \"A\" PART-XIV( Section- I)(External water supply) |
| 76 | Sch \"A\"PART-XIV( Section-II)(External water supply) Note : This schedule is not pre priced by MES and the pre priced rate indicated as \"Rs. 0.00\" under Col.5 signifies this fact only. |
| 77 | Material and labour for construction of valve pit including necessary excavation and earth work as required including necessary PCC work, brick work, plastering etc all as specified including fixing of MS sheet 6 mm thick cover and angle iron frame with locking arrangement including two coats of red oxide arrangement including two coats of red oxide primer internal size of pit 600X600X600mm complete all as specified and directed. |
| 78 | Material and Labour for centrifugal pump set self priming type , electric driven , 3 Ph , 415V, 50 Hz having discharge capacity 15.8 LPSat 36 mtr head (12.5 HP ) complete all as specified and directed. |
| 79 | Total amount ofSch \"A\"PART-XIV( Section-II)(External water supply) |
| 80 | Total amount ofSch \"A\" PART-XV ( Section- I)(External Electric supply & Earthing) |
| 81 | Sch \"A\"PART-XV( Section-II) (External Electric supply) Note : This schedule is not pre priced by MES and the pre priced rate indicated as \"Rs. 0.00\" under Col.5 signifies this fact only. |
| 82 | Material and Labour for construction of platform with PCC 1:4:8 type D-2 with 40 mm graded crushed stones, 15 mm thick in foundation, brick work in CM 1:6 with sub class “B” old size brick, rendering 15 mm thick in CM 1:6 on exposed surfaces and 100 mm thick PCC padding, 1:3:6, type C-1 using 20 mm graded crushed stone aggregate on top and grouting bolts etc of size 3000mm x 2500 mm x 1200mm with fencing foldable upto 1.5 mtr height, gate with locking arrangements using GI wire mesh, GI wire 4mm dia, angle iron, MS plate etc. Complete all as specified . |
| 83 | Supply and Fix sheet moulding compound(SMC) junction box for and including three phase and neutral bus bar and MCB SPN 06 Amps, 250 Volts 50 Hz, 15 KA for control of sreet lights mounted on ploewith the provisions of cable entry and exitMake Sintex/hensel cat part No KF8350/ Siemens/L&T product code NO GSJB-2817 of size 280mmX170mmX130mm all as directed by the Engineer-in-Charge |
| 84 | M&L for Boring of holes under road, pavement, hard standing by trenchless technology, using ultra sounding technique and necessary machine including HDPE pipe of 200 mm dia suitable for 0.4 mpa working pressure complete all as specified and directed. |
| 85 | Supply and fixing LED aviation light luminaries, integral LED aviation light 10 watt comprising of die-cast aluminium housing with red polycarbonate dome, integral driver, supper flux 3mm 302 nos LEDs incorporated, ingress protection : IP65 with protection against short-circuit protectionagainst surge, wide operating input voltage 100-270 VAC, enclosure including connecting electrically to location using cord flexible 3 core PVC insulated over all sheathed with flexible copper conductor of size 0.75 sqmm all as required. And directed by Engineer-in-charge |
| 86 | Supply, testing and commissioning of outdoor weather & dust vermin proof L.T Panel board factory fabricated indoor cubicle type totally enclosed with outer sheel shall be made out of 3.15 mm thick sheet & MS angle section of suitable size for frame, factory fabricated, compartmentalized inner shell shall be made of out of 2.0 mm thick sheet. The panels must be design and verified as per the IS/IEC 61439-01 & 2 with complete type test certificates for conformance to IS/IEC 61439-1 and 2, with 65 KA 1 sec along with MCCB mounted in switch boards with aluminium bus bars as mandatory as conformed to IEC 61641 with internal arc containment fault level of 65 KA/03 Sec and shall be suitable for seismic zone III/IV Zone including the type test conducted at ERDA/CPRI for seismic test. All MCCB/ACB panel should be single tier for easy cable termination. Cable termination space should be adequate to safely gland and terminate al/cu cables for the given current ratings with From B separation for incoming MCCB/ACB feeders and For outgoing MCB feeders. The Switch board cubicles shall have steel frame work enclosed on all sides and top by CRCA sheet steel of Minimum 2.00 mm thickness. The panel shall have integral base frame of 100 MM ISMC base channel, removeable undrilled gland plates shall be fitted for bottom cable entry and making connections, earth work and PCC foundation complete comprising of the following and specified herewith:-(i) Rectangular Aluminium bus bar fixed on insulated mounting arrangement 400 Amps current rating – 04 Nosprovided with heat shrinkable sleeve not less than one mm thick.(ii) Cable alley for 01 I/C and 05 outgoing feeders.(a) incoming (i) MCCB 4P 250 Amps Icu=36 KA at 415 Volts with microprocessor release type-01 No (I/C). ICs=100% Icu and classII front face, isolation with positive break indication with double break contracts, standardextended rotary handle, spreaders, phase barrier etc.(ii) Ammeter digital type 0 to 500 A -1Nos(iii) Voltmeter digital type 0 to 500 V- 1 Nos(iv) Three way selector switch for current- 1 Nos (v) Three way selector switch for voltage – 1 Nos(vi) Phase indicating RYB light LED type – 01 Nos (vii) Suitable CTs of cast resin type with necessary CT short linking should be provided- 1 set |
| 87 | Item 32.05 Cont.. (b) outgoing(a) MCCB Four pole 125 amps Icu=25 KA at 415 volts, adjustable type 02 No (O/G)(1W+1S). It should be with adjustable over load setting Ir = (0.8 to 1.0) x In, Tcs = 100% Icu and with adjustable thermal setting Class II front face with positive break indication with double break contacts, standard extended rotary handle, spreaders, phase barrier etc (ii) MCCB Four pole 100 amps Icu=16 KA at 415 volts, adjustable type with thermal magnetic release -03 No (O/G) . It should be with adjustable over load setting Ir = (0.8 to 1.0) x In, Tcs = 100% Icu and with adjustable thermal setting Class II front face with positive break indication with double break contacts, standard extended rotary handle, spreaders, phase barrier etc |
| 88 | Supply, testing and commissioning of outdoor weather & dust vermin proof L.T Panel board factory fabricated indoor cubicle type totally enclosed with outer sheel shall be made out of 3.15 mm thick sheet & MS angle section of suitable size for frame, factory fabricated, compartmentalized inner shell shall be made of out of 2.0 mm thick sheet. The panels must be design and verified as per the IS/IEC 61439-01 & 2 with complete type test certificates for conformance to IS/IEC 61439-1 and 2, with 65 KA 1 sec along with MCCB mounted in switch boards with aluminium bus bars as mandatory as conformed to IEC 61641 with internal arc containment fault level of 65 KA/03 Sec and shall be suitable for seismic zone III/IV Zone including the type test conducted at ERDA/CPRI for seismic test. All MCCB/ACB panel should be single tier for easy cable termination. Cable termination space should be adequate to safely gland and terminate al/cu cables for the given current ratings with From B separation for incoming MCCB/ACB feeders and For outgoing MCB feeders. The Switch board cubicles shall have steel frame work enclosed on all sides and top by CRCA sheet steel of Minimum 2.00 mm thickness. The panel shall have integral base frame of 100 MM ISMC base channel, removeable undrilled gland plates shall be fitted for bottom cable entry and making connections, earth work and PCC foundation complete comprising of the following and specified herewith:-(i) Rectangular Aluminium bus bar fixed on insulated mounting arrangement 400 Amps current rating – 04 Nosprovided with heat shrinkable sleeve not less than one mm thick.(ii) Cable alley for 01 I/C and 04 outgoing feeders.(a) incoming (i) MCCB 4P 125 Amps Icu=36 KA at 415 Volts with microprocessor release type-01 No (I/C). ICs=100% Icu and classII front face, isolation with positive break indication with double break contracts, standardextended rotary handle, spreaders, phase barrier etc.(ii) Ammeter digital type 0 to 500 A -1Nos(iii) Voltmeter digital type 0 to 500 V- 1 Nos(iv) Three way selector switch for current- 1 Nos (v) Three way selector switch for voltage – 1 Nos(vi) Phase indicating RYB light LED type – 01 Nos (vii) Suitable CTs of cast resin type with necessary CT short linking should be provided- 1 set |
| 89 | Item 53.00 Cont.. (b) outgoing(a) MCCB Four pole 63 amps Icu=25 KA at 415 volts, adjustable type 02 No (O/G)(1W+1S). It should be with adjustable over load setting Ir = (0.8 to 1.0) x In, Tcs = 100% Icu and with adjustable thermal setting Class II front face with positive break indication with double break contacts, standard extended rotary handle, spreaders, phase barrier etc (ii) MCB Two pole 16 amps, 240 V AC, 10KA breaking capacity C-curve charatristic confirming to IS/IEC 60898-1 for street light and pump house. |
| 90 | Supply, testing and commissioning of outdoor weather & dust vermin proof L.T Panel board factory fabricated indoor cubicle type totally enclosed with outer sheel shall be made out of 3.15 mm thick sheet & MS angle section of suitable size for frame, factory fabricated, compartmentalized inner shell shall be made of out of 2.0 mm thick sheet. The panels must be design and verified as per the IS/IEC 61439-01 & 2 with complete type test certificates for conformance to IS/IEC 61439-1 and 2, with 65 KA 1 sec along with MCCB mounted in switch boards with aluminium bus bars as mandatory as conformed to IEC 61641 with internal arc containment fault level of 65 KA/03 Sec and shall be suitable for seismic zone III/IV Zone including the type test conducted at ERDA/CPRI for seismic test. All MCCB/ACB panel should be single tier for easy cable termination. Cable termination space should be adequate to safely gland and terminate al/cu cables for the given current ratings with From B separation for incoming MCCB/ACB feeders and For outgoing MCB feeders. The Switch board cubicles shall have steel frame work enclosed on all sides and top by CRCA sheet steel of Minimum 2.00 mm thickness. The panel shall have integral base frame of 100 MM ISMC base channel, removeable undrilled gland plates shall be fitted for bottom cable entry and making connections, earth work and PCC foundation complete comprising of the following and specified herewith:-(i) Rectangular Aluminium bus bar fixed on insulated mounting arrangement 400 Amps current rating – 04 Nosprovided with heat shrinkable sleeve not less than one mm thick.(ii) Cable alley for 01 I/C and 05 outgoing feeders.(a) incoming (i) MCCB 4P 63 Amps Icu=25 KA at 415 Volts with microprocessor release type-01 No (I/C). ICs=100% Icu and classII front face, isolation with positive break indication with double break contracts, standardextended rotary handle, spreaders, phase barrier etc.(ii) Ammeter digital type 0 to 500 A -1Nos(iii) Voltmeter digital type 0 to 500 V- 1 Nos(iv) Three way selector switch for current- 1 Nos (v) Three way selector switch for voltage – 1 Nos(vi) Phase indicating RYB light LED type – 01 Nos (vii) Suitable CTs of cast resin type with necessary CT short linking should be provided- 1 set |
| 91 | Item 54.10 Cont.. (b) outgoing(i) MPCB Three pole 32 amps suitable for 12.5HP Capacity pump sety including thermal over load and short circuit protection - 03Nosii) Contactor MNX 32, 3 Pole suitable for 12.5 HP induction motor -03 Nos(iii) Push botton set for ON/OFF for motor - 03 Nos(iii) Ammeter digital type 0 to 500 A -1Nos(iv) Voltmeter digital type 0 to 500 V- 1 Nos(v) Three way selector switch for current- 1 Nos (vi) Three way selector switch for voltage – 1 Nos(vii) Phase indicating RYB light LED type – 01 Nos (viii) Suitable CTs of cast resin type with necessary CT short linking should be provided- 3 set(ix) MCCB Two pole 6 amps, 240 V AC, 10KA breaking capacity C-curve charatristic confirming to IS/IEC 60898-1 for street light and pump house. |
| 92 | Supply, testing and commissioning of outdoor weather & dust vermin proof L.T Panel board factory fabricated indoor cubicle type totally enclosed with outer sheel shall be made out of 3.15 mm thick sheet & MS angle section of suitable size for frame, factory fabricated, compartmentalized inner shell shall be made of out of 2.0 mm thick sheet. The panels must be design and verified as per the IS/IEC 61439-01 & 2 with complete type test certificates for conformance to IS/IEC 61439-1 and 2, with 65 KA 1 sec along with MCCB mounted in switch boards with aluminium bus bars as mandatory as conformed to IEC 61641 with internal arc containment fault level of 65 KA/03 Sec and shall be suitable for seismic zone III/IV Zone including the type test conducted at ERDA/CPRI for seismic test. All MCCB/ACB panel should be single tier for easy cable termination. Cable termination space should be adequate to safely gland and terminate al/cu cables for the given current ratings with From B separation for incoming MCCB/ACB feeders and For outgoing MCB feeders. The Switch board cubicles shall have steel frame work enclosed on all sides and top by CRCA sheet steel of Minimum 2.00 mm thickness. The panel shall have integral base frame of 100 MM ISMC base channel, removeable undrilled gland plates shall be fitted for bottom cable entry and making connections, earth work and PCC foundation complete comprising of the following and specified herewith:-(i) Rectangular Aluminium bus bar fixed on insulated mounting arrangement 400 Amps current rating – 04 Nosprovided with heat shrinkable sleeve not less than one mm thick.(ii) Cable alley for 01 I/C and 04 outgoing feeders.(a) incoming (i) MCCB 4P 160 Amps Icu=25 KA at 415 Volts with microprocessor release type-01 No (I/C). ICs=100% Icu and classII front face, isolation with positive break indication with double break contracts, standardextended rotary handle, spreaders, phase barrier etc.(ii) Ammeter digital type 0 to 500 A -1Nos(iii) Voltmeter digital type 0 to 500 V- 1 Nos(iv) Three way selector switch for current- 1 Nos (v) Three way selector switch for voltage – 1 Nos(vi) Phase indicating RYB light LED type – 01 Nos (vii) Suitable CTs of cast resin type with necessary CT short linking should be provided- 1 set |
| 93 | Item 55.00 Cont.. (b) outgoing(i) MCCB 4P 63 Amps Icu=25 KA at 415 Volts, adjustable type-02 No (O/G)(1W+1S). It should be with adjustable over load setting Ir = (0.8 to 1.0) x In, Tcs = 100% Icu and with adjustable thermal setting Class II front face with positive break indication with double break contacts, standard extended rotary handle, spreaders, phase barrier etc(i) MCCB Two pole 16 amps, 240V AC, 10kA breaking capacity C-curve charatristic confirming to IS/IEC 60898-1 for street light and pump house.(ii) Contactor MNX 32, 3 Pole suitable for 12.5 HP induction motor -03 Nos(iii) Ammeter digital type 0 to 500 A -2Nos(iv) Voltmeter digital type 0 to 500 V- 2 Nos(v) Three way selector switch for current- 2 Nos (vi) Three way selector switch for voltage – 2 Nos(vii) Phase indicating RYB light LED type – 02 Nos (viii) Suitable CTs of cast resin type with necessary CT short linking should be provided- 2 set(ix)Timer switch 415Volts 63 Amp Capacity with contactor fitted in box. |
| 94 | Note for Item No 53.00 TO 55.00 :All accessories prewired with suitable size copper wire with stand high temperature, housed in cubical panel made out of standard MS sheet factory made duly powder coated front and rear door open able with locking arrangement complete with foundation as required or recommended by manufacturerMain aluminium busbars with 0.8 Amps /sqmm current density & all internal wiring with copper FRLS wires and connections. All MCCB’s are microprocessor/Thermal Magnetic based (Icu= Ics-=100%) as given in Sld, housed in separate compartments, enclosed on sides, with rotating handle. All MCGB Icu= 10KA where not given/mentioned in sld.Earthing all components, frame etc. to a common internal earth bar.Painting all sheet metal work support structure etcAll accessories & supporting structure (Hot Dip Galvanised).The panel shall be with galvanized MS mounting base frame & the height shall not exceed more than 2100mm.The panel shall be prewired, ready for External Cable terminationAll Gland plate’s shall be 3 mm thick removable type.All the CT’s shall be cast resin type, with necessary CT shorting link.The panel shall be in convenient sections suitable for transportation, erection & have sufficient space for incoming & outcoming cable terminations.The panel incomers/outgoings shall have potential free contract.3 mm thick acrylic sheet shall be provided on the top of all outgoing termination sections, for protection against live terminalsAll the panel incomers/outgoing shall be tagged with aluminium anodized engraved name plates (Detailed tag of the feeders will be given during the final approval of panel drawings)Vendor shall arrange to configure/check/set all the meters once the panel is completely installed & in operations at site |
| 95 | Supply & Fixing cable route indicator at the distance of 50 mtrs each made out of 45 x 45 x 5 mm angle iron, 80 mm long embedded in PCC block of suitable size with moulded lettter HT CABLE or LT CABLEsuitably incribed on CI circular plate 8 mm thick 100 dia including painting with two coats of synthetic enammel paint overa coat of red oxide primer including necessary PCC 1:3:6, type C2 ( using 40 mm graded aggregate ) block of suitable size and neccessary earth work and excavation all as specified and directed. |
| 96 | Supply, testing and commissioning of Microprocessor base single phase static energy meter with tamper- proof features, 230V, 50Hz, 10-60A rating, class 1.0 accuracy or better complaint with optical communication port (IEC 62056-21 complaint) including tamper detection features (magnetic interferance, neutral bypass, reverse energy, cover opening), polycarbonate encloser with IP51 protection, LCD display sealing provisions, non-volitile memory for energy and event logging as per IS 13779 and IEC 62053 standards all as per directed by engineer-in-Charge. |
| 97 | Supply, testing and commissioning of All-in-one integrated solar street light comprising energy-efficient LED luminaries of capacity not less than 24 watt with luminous efficiency up to 120lm/watt LED life span greater than 50000 hours in built lithium ferro battery of suitable capacity with life span greater than 5 years , high efficiency polycrystalline solar PV module (MNRE approved), all housed inIP65 rated weather proof casing with automatic dusk to dawn operation, mounted on 6 meter hot dip galvanished octagonal steel pole (bottom dia 130mm top dia 70mm and thickness 3mm) complete PCC foundation (1:2:4) of size 450x450x600mm including excavation, curing necessary wiring fastners earthing with GI strip and all accessories required for safe and complete installation, as specified and directed by Engr-in-Charge.with built in type crystaline panel, lithium phospate battery, MPPT charger controller and PIR sensor having colout temperature 6500 K with 2 day antonomy with dimming profile, |
| 98 | M&L for Transportation of Transformer 100 KVA 11/0.433kv oudoor type immersed tranformer from MES store yard to site ( within distance of 3KM) including loading, unloading, safe handling using mechanical means (Crane/ chain pulley), shifting, installation on pre constructed PCC platform, proper alligenment, earthing with GI strips, termination of HT and LT cables using suitable aluminum/ copper lugs, glands and hardware, connection to existing HT/LT system testing and commissioning, complete all as specified and directed by Enginr-in-Charge.Note:- Work includes cleaning, minor repairs (if required), supply of necessary consumables, T&P and ensuring complaince with relevant IS standard and safety protocols. |
| 99 | Total amount of Sch \"A\"PART-XV( Section-II) (External Electric supply) |
| 100 | Sch \"A\" PART-XVI (STAND BY SUPPLY) Note: This schedule is not pre priced by MES and the pre priced rate indicated as \"Rs. 0.00\" under Col.5 signifies this fact only. |
| 101 | Supply, install, testing & commissioning of ‘Silent type’ diesel generating set along with heaving prime power rating of 62.5 KVA/50 KW, 415 Volts at 1500 RPM, 0.8 lagging power factor at 415 Volts suitable for 50 Hz3 phase, system and for 0.85 load factor, CPCB-4 norms compiled, acoustic enclosure, relay panelfor automatic starting on mainfailure (AMF) anti vibration mountings, control panel and foundation. The DG set should berobust in construction factory tested and assembled to ensure perfect alignment of Engine and Alternator on a common base frame. The DG set power rating in indicated above is inclusive of altitude correction factor however the DG Set shall be designed and suitable to operate as per tropical conditions of Pathankot (Punjab) and for more details on services condition refer particular specification. The DG set shall be comprising of following item as under:-(A) Diesel Engine: The diesel engine shall be of four stroke cycle multi-cylinder, direct injection water cooled, turbo charged with after cooler, Air to Air after cooling and optimised turbochargerfor increased altitude capabilities developing required 81 (BHP) @ 1500 rpm under NTP conditionof BS 5514/ISO 3046 with an over lead capacity of 110% for one hour in any specified 12 hrs of continuous operations suitable for generating set application on AMF mode. The engine shall confirm to IS : 10000/BS:649/BS 5514/ISO 3046 the engine shall have the following accessories.(i) Cooling fan and radiator(ii) DM water cooling systems with pre mix anti corrosive additive (iii) turbocharger (iv) fly wheel with fly wheel housing. (v) Electrical engine starter motor (disengagement after start up) with Batteries. (vi) battery charging systems (vii) stainless steel exhaust flexible elbow. (viii) Thermal sealing of exhaust pipe and aluminium cladding for complete exhaust pipe and silencer. (ix) Required filters for fuel, lube oil, air etc. (x) Sets of flexible hoses as required (xi) Suitable rubber coupling to Alternator with guard. (xii) Suitable Engine controller for protection of the engine (xiii) coolant heater and crankcase heater. (xiv) oil drain pump. (xv) heavy duty air cleaner (b) Engine Protections: (i) High coolant temperature warning & trip (ii) low lubricating oil pressure warning & trip (iii) low coolant level warning & trip (iv) Fail to crank trip (v) over crank trip(vi) High and low speed trip (vii) Low or high battery voltage alarms. (viii) Clogged filter warning and lack of fuel (ix) high canopy temperature (x) set fail to start protection after failure of the set to start after successfulthree consecutive start attempts. |
| 102 | Item 63.00 Cont.. (c) Starting system : The engine starting shall be by means of totally enclosed axial type electric starter suitable suitable for 12 Volts DC starting system comprising of starter motor, voltage regulator andarrangement for initial exciation complete with suitable number of batteries of suitable AH sealed maintenance Free (SMF) lead Acid type) as required as per specifications. The battery AH and plates shall be as per OEM standards the connections shall be with copper conductor battery leads of required length. (d) Alternator : 62.5 KVA 3 phase 0.8 PF 415 v, 4 wire 1500 rpm self-excited and self regulated through AVR confirming to IS : 4722/BS 2613 suitable for tropical condition with brush less exciter, housed in screen protected drip proof enclosure. The alternator shall be confirming to IS 13364 Part-2 & Is 15999 Part-I/IEC 60034 Part-I capable of delivering rated output at rated power factor with a terminal voltage differing from the rated value by not more than +/-5%(b) Frequency differing from the rated value by not more than +/-0.5%(c) Short circuit capacity of 300% for 10 Seconds(d) Over load capacity of 110% for one hour. The insulation class of the alternator shall be class F/H. The temperature rise shall be limited to class B and ingresses enclosure protection shall IP23 or better. The alternator shall be fitted with suitable Nos. Resistance temperature Device (RTD) & bearing temperature Device (BTD) along with space heaters.(e) Alternator Protection : Alternator should have following protectionsOver under voltage, under and over frequency warning and trip , loss of excitation , over current and earth fault and short circuit protection unbalanced loads, restricted earth fault protection , differential protection , diode failure. (f) Voltage regulator : A rapid response voltage regulator shall be provided to regulator the generated voltage., The overall regulations from No load to full load, including cold to hot variation and load power factor of 0.8 lag to unity shall be within 2% of the normal voltage. The excitatioin system shall be designed to promote rapid voltage recovery following sudden application and disconnection of load(g) Acoustic enclosure : The acoustic enclosure should be supplied along with DG Set from the manufacturer outlet itself as per CPCB norm. Acoustic enclosure shall be of powder coated and fabricated out of 2mm thick CRCA MS Sheet. The canopy shall have four hinged doors, one door with glass window to view proper parameters on the control panel. The canopy and doors shall have inside lining of fire retardant foam/glasswool as acoustic materials. The base frame shall be fabricated in ISMC channel or in sheet metal, with lifting hooks for convenient lifting of complete set i.e along with canopy, engine and alternator. The sound level shall have less than 75 db (A) at a distance of 1 meter. High quality noise aborbant and fire-retardant grade acoustic insulation material (P.U Foam) complying to IS 8183. The allowable temperature raise inside the canopy is 5 to 7 deg. Centrigrade. The measurement of noise should be as per ISO 3744/ISO 8528 (Part-10) Standard. The canopy has the provision of emergency push button. External to the canopy |
| 103 | Item 63.00 Cont.. h) Governor : The governor shall be of electronic type suitable for monitoring constant engine speed with the specified limits for auto parallel and auto load sharing operation(j) Exhaust:- The exhaust piping system shall be supplied with a hospital grade silencer and catalytic conventer suitably optimized to meet stringent noise emission standards laid down by MoEF/CPCB the exhaust piping and the silencer shall be wrapped with rock wool and /or calcium silicate. The outside shall be neatly wrapped with aluminium cladding. The exhaust line shall be extended beyond the height of the utility building roof as required by pollution control norms. Suitable supporting structure for installation shall be provided (k) Hot air exhaust (Radiator cooling) : GI duct shall be provided for hot air exhaust from DG Set up to designated place of duct outlet. The duct shall be made of 14 Gauge thickClass-8 Galvanized Iron (GI) sheet. Galvanised Irton (GI) duct shall be provided for venting hot exhaust air out of the DG room, from radiator hot air outlet point of the DG acoustic enclosure through nearest brick wall(l) Fuel Tank : Inbuilt/internal bottom mounted (with -in DG set or with-in base frame) diesel tank of suitable capacity with mounting brackets, complete with fuel inlet, out let, air vent, drain plug, level indicator, inter connection pipes from tank to diesel generator as required. Suitable barrier shall be provided between diesel tank the engine. The tank shall be designed as per manufacturer\"s specificationhaving sufficient capacity for contineous running at least 10 hrs continuous operation.(m) AMF Control Panel : The control panel shall be designed for automatic ON Mains Failure operations the generator sets. The panel will be totally enclosed. Dust tight, vermin proof, floor mounted. Free standing, cubical compartmentalized type with hinged doors, fabricated from 14 SWG CRCA steel metal having separate compartments. The panel will be epoxypainted powder coated the light grey shade after seven tank treatment, and the panel./compartment will be fitted with the following instrument and pre-wired with colour coded flexible copper cable with ferule numbers for easy identification & maintenance. The panel shall be complete with interconnections insulators, two nos. of earthing lugs and with suitable rating of MCCB at both the end & shall incorporate the following (i) Neutral contactors. (ii) AMF logic unit having protection for every frequency, under voltage, under voltage, Low lube -oil and high water temperature for Engine. The AMF unit will have provision for auto start, auto stop of the DG set with 3 attempts cranking relay (iii) main supply voltage monitor. (iv) combined meter (MFM) for voltage. Current, frequency KVA, KWH & P.F (v) CT’s of suitable rating (vi) static battery charger connected on mains consisting of transformer , Rectifier, D.C Voltmeter, D.C Ammeter, charging rate selector switch (Trickle /boost, indicating lamp, onoff swtich) (vii) auto/manual mode switch (viii) Miniature circuit breaker for Fuses (ix) Hooter 12 Volts (x) Annunciations, Alarms & trips for high water temperature ,. Over speed, set fails to start and DG overload |
| 104 | Item 63.00 Cont.. (xi) push buttons for breaker on off DG Start/Stop Engine Trip Hooter Accept and for rest(xii) Indicating lamps for load on mains, load on DG Set low lube oil pressure and high water temperature (xiii) suitable size of tinned copper bus bar will be provided with current density of 1.2 Amp per mm2. (xiv) Set of relays and contractor of suitable with along with MCCD of capacity 100 Amps (Incoming)- 1 Nos and 63 Amps (2 Nos) for outgoing, 4 pole 4154 Volt 50 KA for automatically shut down of DG Set or as per manufacturer recommendation of suitable rating & capacity (xv) by pass arrangement by providing on loadc hange over switch 125 Amps 4 pole to be installed with AMF – 01 Nos Note 1 AMF Panel shall be installed outside the acoustic enclosure (ii) Cost of DG Set foundation deemed to be included in cost of item (iii) Contractor should submit necessary drawing to GE/Engr-in-Charge before placing the order. |
| 105 | Total amount of Sch \"A\" PART-XVI (STAND BY SUPPLY) |
| 106 | SCHEDULE `A\" PART-XVII(MODULAR KITCHEN FOR MD ACCN FOR SQD LDR) Note : This schedule is not pre priced by MES and the pre priced rate indicated as \"Rs. 0.00\" under Col.5 signifies this fact only. |
| 107 | Supply and fixing factory made 25mm thick solid WPC(wood particle composit) sheet one side UV printed of pattern ( as approved by GE) and other side wood nature colour for cupboard shutter of density 600 kg/Cum bent 90 degreeincl 100% termite/water proof, fire rertradent, Eco friendly, and finish at all edges incl PVC edge binding tape on exposed sides etc. Complete as per direction of Engr-in-charge andas per Manufacture specification. |
| 108 | Supply and fixing factory made 20mm thick solid WPC(wood particle composit) without prelam sheet having both side wood nature colour for cupboard partitions/slab of density 600 kg/Cbm bent 90 incl 100% termite/water proof, fire rertradent, Eco friendly, and finished at all edges incl PVC edge binding tape on exposed sides complete as per direction of Engr-in-charge and as per Manufacture specification. |
| 109 | S & F for stainless steel plain basket of size 17” x20” x6” complete all as specified and directed |
| 110 | S & F for stainless steel plain basket for plate partition of size 17” x20” x6” complete all as specified and directed |
| 111 | S & F for stainless steel plain basket for cutlery of size 17” x20” x6” complete all as specified and directed |
| 112 | S & F for stainless steel grain troly with stand of size 21” x17” x10” complete all as specified and directed |
| 113 | S & F for stainless steel basket for cup & soucer of size 17” x20” x4” complete all as specified and directed |
| 114 | S & F 150mm long fancy type stainless steel handels for shutters complete all as specified and directed |
| 115 | S & F high quality Magnet ball catcher for cupboard shutter, complete all as specified and directed. |
| 116 | S & F for soft close concealed steel Auto hinges for cabinet case complete all as specified and directed |
| 117 | S & F for heavy duty 20” long telescope slider to facilitate drawer slide of steel ball bearing fixed with steel screws complete all as specified and directed |
| 118 | Total amount ofSCHEDULE `A\" PART-XVII(MODULAR KITCHEN FOR MD ACCN FOR SQD LDR) |
| 119 | PHASE-III:- OUTSOURCING OF SERVICES FORFOR OPERATION OF LIFTSNote : This schedule is not pre priced by MES and the pre priced rate indicated as \"Rs. 0.00\" under Col.5 signifies this fact only. |
| 120 | SCHEDULE `A\" PART-XVIII :- OUTSOURCING OF SERVICES FORFOR OPERATION OF LIFTS INSTALLED AT AIRMAN MAD ACCN G+6 BLDG AND ITS EQUIPMENTS by providing three electricians/skilled operators for round the clock operation in three shifts each shiftsof 8 hrs per day including sunday and holiday including daily cleaning of Eqpt/Installation, including providing T&P and all other tools required for smooth functioning of lifts including pproviding and maintaing daily log sheet. note :- 1)-electrician/lift operator have 5 years experience of electrical equipment , operation comprising of lifts operation of knowledge of human operation drive, automatic resque device, door sensors, emergency exist etc.(ii) maintain daily log sheets(iii) operator will not leave the installation without proper handing taking with the next shift operator(iv):- cost of reliver deemed bto be included above quoted rates(v) operator have knowledge of operation of equipments installed at location deployed. (vi) a panel recovery of rs 500 per shift per operator shall be recovered in addition no payment for the shft in case of operator found absent from the duty. |
| 121 | SCHEDULE `A\" PART-XIX:- OUTSOURCING OF SERVICES FORFOR OPERATION OF LIFTS INSTALLED AT AIRMAN MAD ACCN G+6 BLDG AND ITS EQUIPMENTS by providing three electricians/skilled operators for round the clock operation in three shifts each shiftsof 8 hrs per day including sunday and holiday including daily cleaning of Eqpt/Installation, including providing T&P and all other tools required for smooth functioning of lifts including pproviding and maintaing daily log sheet. note :- 1)-electrician/lift operator have 5 years experience of electrical equipment , operation comprising of lifts operation of knowledge of human operation drive, automatic resque device, door sensors, emergency exist etc.(ii) maintain daily log sheets(iii) operator will not leave the installation without proper handing taking with the next shift operator(iv):- cost of reliver deemed bto be included above quoted rates(v) operator have knowledge of operation of equipments installed at location deployed. (vi) a panel recovery of rs 500 per shift per operator shall be recovered in addition no payment for the shft in case of operator found absent from the duty. |
| 122 | SCHEDULE `A\" PART-XX:- OUTSOURCING OF SERVICES FORFOR OPERATION OF LIFTS INSTALLED AT AIRMAN MAD ACCN G+6 BLDG AND ITS EQUIPMENTS by providing three electricians/skilled operators for round the clock operation in three shifts each shiftsof 8 hrs per day including sunday and holiday including daily cleaning of Eqpt/Installation, including providing T&P and all other tools required for smooth functioning of lifts including pproviding and maintaing daily log sheet. note :- 1)-electrician/lift operator have 5 years experience of electrical equipment , operation comprising of lifts operation of knowledge of human operation drive, automatic resque device, door sensors, emergency exist etc.(ii) maintain daily log sheets(iii) operator will not leave the installation without proper handing taking with the next shift operator(iv):- cost of reliver deemed bto be included above quoted rates(v) operator have knowledge of operation of equipments installed at location deployed. (vi) a panel recovery of rs 500 per shift per operator shall be recovered in addition no payment for the shft in case of operator found absent from the duty. |
| 123 | SCHEDULE `A\" PART-XXI:- ANNUAL MAITENANCE /COMPREHENSHIVE MAINTENANCEOF LIFTS ( 13 PASSENGERS =01 No and 08 Passenger =01 No ) Annual maintenance contract of lift 13 Passenger=01 No and 08 passengers =01 Noinstalled at Air force station pathankot. The AMC will cover following works related to the lift (a)All the lift parts which get damaged during the operation will be repaired /replaced during this period from the OEM. (b) AMC willcover routine service of the lift once a month by oiling, cl;eaning, dusting greasing, checking all all the electrical and mechanical parts and all the service as sheduled and required by OEM for the lifts(c). The contractor shall enter into MOU with the OEM for the provision of further maintenance post warranty / defect liability period . (d)Any type of complaints in the lift shall be attended within time as specified in PS.(e) MOU between contractor and OEM shall be submitted at least six months prior to the issue of completion certificate of the main contract.(f) Penalty for not atttending complaints as specified in PS. |
| 124 | SCHEDULE `A\" PART-XXII:- OUTSOURCING OF SERVICES FORFOR OPERATION OF LIFTS INSTALLED AT AIRMAN MAD ACCN G+6 BLDG AND ITS EQUIPMENTS by providing three electricians/skilled operators for round the clock operation in three shifts each shiftsof 8 hrs per day including sunday and holiday including daily cleaning of Eqpt/Installation, including providing T&P and all other tools required for smooth functioning of lifts including pproviding and maintaing daily log sheet. note :- 1)-electrician/lift operator have 5 years experience of electrical equipment , operation comprising of lifts operation of knowledge of human operation drive, automatic resque device, door sensors, emergency exist etc.(ii) maintain daily log sheets(iii) operator will not leave the installation without proper handing taking with the next shift operator(iv):- cost of reliver deemed bto be included above quoted rates(v) operator have knowledge of operation of equipments installed at location deployed. (vi) a panel recovery of rs 500 per shift per operator shall be recovered in addition no payment for the shft in case of operator found absent from the duty. |
| 125 | SCHEDULE `A\" PART-XXIII:- ANNUAL MAITENANCE /COMPREHENSHIVE MAINTENANCEOF LIFTS ( 13 PASSENGERS =01 No and 08 Passenger =01 No ) Annual maintenance contract of lift 13 Passenger=01 No and 08 passengers =01 Noinstalled at Air force station pathankot. The AMC will cover following works related to the lift (a)All the lift parts which get damaged during the operation will be repaired /replaced during this period from the OEM. (b) AMC willcover routine service of the lift once a month by oiling, cl;eaning, dusting greasing, checking all all the electrical and mechanical parts and all the service as sheduled and required by OEM for the lifts(c). The contractor shall enter into MOU with the OEM for the provision of further maintenance post warranty / defect liability period . (d)Any type of complaints in the lift shall be attended within time as specified in PS.(e) MOU between contractor and OEM shall be submitted at least six months prior to the issue of completion certificate of the main contract.(f) Penalty for not atttending complaints as specified in PS. |
| 126 | SCHEDULE `A\" PART-XXIV:- OUTSOURCING OF SERVICES FORFOR OPERATION OF LIFTS INSTALLED AT AIRMAN MAD ACCN G+6 BLDG AND ITS EQUIPMENTS by providing three electricians/skilled operators for round the clock operation in three shifts each shiftsof 8 hrs per day including sunday and holiday including daily cleaning of Eqpt/Installation, including providing T&P and all other tools required for smooth functioning of lifts including pproviding and maintaing daily log sheet. note :- 1)-electrician/lift operator have 5 years experience of electrical equipment , operation comprising of lifts operation of knowledge of human operation drive, automatic resque device, door sensors, emergency exist etc.(ii) maintain daily log sheets(iii) operator will not leave the installation without proper handing taking with the next shift operator(iv):- cost of reliver deemed bto be included above quoted rates(v) operator have knowledge of operation of equipments installed at location deployed. (vi) a panel recovery of rs 500 per shift per operator shall be recovered in addition no payment for the shft in case of operator found absent from the duty. |
| 127 | SCHEDULE `A\" PART-XXV :- ANNUAL MAITENANCE /COMPREHENSHIVE MAINTENANCEOF LIFTS ( 13 PASSENGERS =01 No and 08 Passenger =01 No ) Annual maintenance contract of lift 13 Passenger=01 No and 08 passengers =01 Noinstalled at Air force station pathankot. The AMC will cover following works related to the lift (a)All the lift parts which get damaged during the operation will be repaired /replaced during this period from the OEM. (b) AMC willcover routine service of the lift once a month by oiling, cl;eaning, dusting greasing, checking all all the electrical and mechanical parts and all the service as sheduled and required by OEM for the lifts(c). The contractor shall enter into MOU with the OEM for the provision of further maintenance post warranty / defect liability period . (d)Any type of complaints in the lift shall be attended within time as specified in PS.(e) MOU between contractor and OEM shall be submitted at least six months prior to the issue of completion certificate of the main contract.(f) Penalty for not atttending complaints as specified in PS. |
| 128 | SCHEDULE `A\" PART-XXVI :- OUTSOURCING OF SERVICES FORFOR OPERATION OF LIFTS INSTALLED AT AIRMAN MAD ACCN G+6 BLDG AND ITS EQUIPMENTS by providing three electricians/skilled operators for round the clock operation in three shifts each shiftsof 8 hrs per day including sunday and holiday including daily cleaning of Eqpt/Installation, including providing T&P and all other tools required for smooth functioning of lifts including pproviding and maintaing daily log sheet. note :- 1)-electrician/lift operator have 5 years experience of electrical equipment , operation comprising of lifts operation of knowledge of human operation drive, automatic resque device, door sensors, emergency exist etc.(ii) maintain daily log sheets(iii) operator will not leave the installation without proper handing taking with the next shift operator(iv):- cost of reliver deemed bto be included above quoted rates(v) operator have knowledge of operation of equipments installed at location deployed. (vi) a panel recovery of rs 500 per shift per operator shall be recovered in addition no payment for the shft in case of operator found absent from the duty. |
| 129 | Total amount of phase -III (OUTSOURCING AND MAINTENANCE ) |
| SR No | FileName | File Description |
| 1 | Click here to download tender document | Tender Documents |
| 2 | Click here to download tender document | Tender Documents |
| 3 | Click here to download tender document | Tender Documents |
| 4 | Click here to download tender document | Tender Documents |
| 5 | Click here to download tender document | Tender Documents |
| 6 | Click here to download tender document | Tender Documents |
| 7 | Click here to download tender document | Tender Documents |
| 8 | Click here to download tender document | Tender Documents |
| 9 | Click here to download tender document | Tender Documents |
Copyright © 2026 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail