| 1 | Earthwork in excavation of foundation in hard soil including dressing and levelling the bed and depositing the soil away from the working area as directed by the EIC |
| 2 | Providing ,Supplying , filling in foundation and plinth with sand including watering with cost, conveyance , Royality taxesof all materials with all labour , T & Petc. Complete. |
| 3 | Metal concrete (1:4:8) using 40mm size CBG metal with all cost of material, labour, conveyance, royalty, taxes T and P etc. complete. |
| 4 | Supplying all materials, labour, T&P and providing reinforced cement concrete work of M-20 grade with 20mm and down grade black hard granite crusher broken stone chips including hoisting, laying, watering, curing, conveyance of all materials to worksite, payment of royalty, taxes etc all complete as per specification and direction of the E.I.C |
| 5 | pillar base & plinth band |
| 6 | pillar |
| 7 | Foundation |
| 8 | superstructure |
| 9 | Supplying all materials, labour, T&P and providing 12mm thick cement plaster (1:6) on brickwork including watering, curing, conveyance of all materials to worksite, payment of royalty, taxes etc all complete as per specification and direction of the E.I.C |
| 10 | Supplying all materials, labour, T&P and providing 16mm thick cement plaster (1:6) on brickwork including watering, curing, conveyance of all materials to worksite, payment of royalty, taxes etc all complete as per specification and direction of the E.I.C |
| 11 | 6mm thick cement plaster in cm (1:4) finished smooth to brick masonry including racking out joints including watering, curing, cost, conveyance, taxes, royalties, labour with T&P etc. complete in all respect. |
| 12 | Wall painting two coats with weather coat of approved shade & approved make to give an even shade etc including cost of all materials, taxes & labour with T&P etc. complete in all floors as per the direction of EIC. |
| 13 | Wall priming one coat with approved wall primer etc including cost of all materials, taxes & labour with T&P etc. complete in all floors as per the direction of E-I-C. |
| 14 | Supplying fitting and fixing of precast garden chair including all cost and colouring etc complete as directed by the EIC. |
| 15 | Rejuvenation & Renovation of well with excavation of inside slushyearth,garbages,C&D materials etc properly and manually with all costs complete. |
| 16 | Fixing of industrial vertrified tiles in floors, Trades of steps & Landing over 25mm thick bed of cement mortar 1:1 jointed with cement slurry mixed with pigments to match the shade of the tiles, including rubbing & polishing etc. complete including cost, conveyance, taxes & royalties of all materials, labour with T&P complete in all respect. |
| 17 | Supplying, fitting and fixing of GI grill in Door&windows (Frame with Shutter) including screws as may be required etc with cost, conveyance, taxes of all materials, labour, T&P etc. required for the complete in all respect. |
| 18 | Supplying all materials, labour, T&P and providing M.S reinforcement for R.C.C work including cutting, bending, binding, and tying the grills and placing in position including cost of binding wire 18 to 20 gauge, conveyance of all materials to worksite, payment of royalty, taxes etc all complete as per specification and direction of the E.I.C |
| 19 | provision for plantation with pot |
| 20 | Photography and displayboard Please Enable Macros to View BoQ information |