| 1 | De-Watering:-Suplying all materials, labours, T&P, 5.00 HP Diesel Pump set with POL, Pump Operator etc. and De-watering the clear water/muddy water etc. all complete as per the required specification and direction of Engineer in charge |
| 2 | Deweeding:-Uprooting rank vegetation and weeds by digging the area to a depth of 60cm, removing all weeds and other growth roots by forking repeatedly beraking clods rough dressing flooding with water uprooting fresh growths after 10 to 15days and then fine dressing for planting new grass etc as per the required specification and direction of the Engineer-in -charge |
| 3 | Providing and laying moorum and sand admixture in sub-base including watering and compacting with PRR etc. including cost of all material etc. complete. |
| 4 | Supplying all materials , Labour, T&P and Fine dressing of earthwork in odinary or hard soil in road / Embankment formation including cost of cutting of filling earth upto 0.15 depth of surface etc all complete as per the required specifications and direction of Engineer in Charge (AoR-2006, Page no-7, item No.10) |
| 5 | Pathway:- Earth work in excavation in hard soil for foundation trenches to a depth of 300mm including fine dressing and leveling the bed depositing the excavated earth/soil within initial lead of 50m and initial lift of 1.5m etc all complete as per the required specificaton and direction of Engineer In Charge. |
| 6 | Providing, laying, spreading, and compacting stone agreegate of specific size to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 8-10 tones PRR to proper grade and camber, applying and brooming requisite type of screening / binding materials to fill up the interstices of course agreegate, watering and compacting to the required density as per Clause 404 of MoSRT&H Specification for road and Bridge work (4th Revision) UNIT = CUM, Taking Output = 360 cum |
| 7 | Supplying and filling in foundation and plinth with good quality river sand well watered and rammed, including all cost, conveyance, taxes of all materials and labour etc all complete as per the specification and direction of the Engineer-in- Charge ( Measurements will be taken on finished compacted section) |
| 8 | Supplying all materials, labour, T&P and providing cement concrete (1:4:8) with 4cm size hard granite metal including watering, curing, conveyance of all materials to worksite, payment of royalty, taxes etc all complete as per specification and direction of the E.I.C |
| 9 | Supplying all materials, labour and T&P for laying, fitting & fixing 80mm thick Cement Concrete inter locking paver blocks of M 30 grade of approved make, design, colour and size made by block making machine with proper compaction by mechanical means , cutting of paver blocks as per required size and pattern and laying the blocks in required pattern over the prepared hard base surface , finishing and sweeping extra sand in pathway including all cost, conveyance, taxes, royalities of all materials and T&P etc all complte confirming to IRC:SP-63:2018 and its ammendments if any etc all complete as per the required specifications and directions of the Engineeer-in- Charge. |
| 10 | Cement concrete of proportion (1:2:4) in F&F using 12mm size cb/hb chips of approved quality including cost, conveyance, taxes & royalty of all materials and labour with T&P etc. complete in all respect. |
| 11 | Supplying & fixing of Rough stone dry packing in approns & revetments with hard granite stones of min 30 cm size all complete. |
| 12 | Provision for GI Railing with all costs complete.(paid as per actual voucher) |
| 13 | Provision forGarden chairs etc with all costs complete. |
| 14 | Photography and displayboard with site clearance Please Enable Macros to View BoQ information |