| 1 | Earth work in hard soil or gravelly soil within 50 m initial lead and 1.5 m initial lift, including rough dressing and breaking clods up to maximum 5 cm to 7 cm in size, laying in layers not exceeding 0.30 m in depth and as per the direction of the Engineer-in-Charge, etc., complete. |
| 2 | Filling foundation and plinth with sand, well watered and rammed hard, etc., complete. |
| 3 | Plain Cement Concrete (1:3:6) using 40 mm size C.B.H.G. metal in foundation and base, including cost, conveyance, carriage and royalty, etc., complete. |
| 4 | Brick work with FLY ASH bricks having crushing strength between 35 kg/cm² to 149 kg/cm² in Cement Mortar (1:6) in foundation and plinth, including cost, carriage and royalty, etc., complete. |
| 5 | R.C.C. work of M‑20 grade with 20 mm and down‑graded black hard crusher broken granite chips, including Centering & Shuttering work hoisting and laying in position, compacting to specified design, curing for proper period, including cost, conveyance, royalty, taxes of all materials, labour charges, T&P, etc., complete as per direction of the Engineer‑in‑Charge. (COLUMN FOOTING) |
| 6 | COLUMN UPTO PLINTH |
| 7 | GRADE BEAM |
| 8 | LINTEL BAND |
| 9 | COLUMN UPTO ROOF LEVEL |
| 10 | WALL BEAM |
| 11 | CHAJJA |
| 12 | ROOF SLAB |
| 13 | Brick work with FLY ASH bricks having crushing strength between 35 kg/cm² to 149 kg/cm² in Cement Mortar (1:6) in superstructure, including cost, carriage and royalty, etc., complete. |
| 14 | Supply of HYSD reinforcement for R.C.C. work including cutting, bending, binding and tying the grills and placing in position including cost of reinforcement and binding wire 18 to 20 gauge for work of ground floor including all materials and labour as per direction of Engineer-in-charge.Footing to roof level |
| 15 | Cement Concrete (1:4:8) using 40mm size metal to recive A.S flooring including cost, conveyance of all material and labour etc complete. |
| 16 | 12 mm thick cement plaster with Cement Mortar (1:6) including all cost, conveyance and royalty, etc., complete. |
| 17 | 12 mm thick cement plaster with Cement Mortar (1:6) including all cost, conveyance and royalty, etc., complete. |
| 18 | Supplying & Fixing Kota tiles in floors treads or steps and landing on 25 mm thick bed of cement mortar 1:1 ( 1 cement : 1 sand ) jointed with neat cement slury mixed with pigment to match the shades of the tiles including rubbing & polishing etc complete including cost of precast tiles. |
| 19 | Supplying, fitting and fixing of M.S. door and window, etc., complete. |
| 20 | Painting two coats of Synthetic Enamel paint of approved make and shade to give an even surface over a priming coats over steel/ metal/ wooden surfaces including preparation of surfaces by thoroughly cleaning oil, grease, dirt and other foreign matter and scoured with wire brush, fine steel wool, scrapers and sand papers etc complete as per specification and direction of Engineer-in-Charge. |
| 21 | Finishing walls with water proofing cement paint of approved shade on new work 2 coats to give an even shade including all materials and labour as per direction of Engineer-in-charge.(Ground Floor) |
| 22 | Distempering Two coat to walls with distemper of approved shade on new work to give an even shade including cost of distemper.(Substtute Items ) |
| 23 | Provision for display board Please Enable Macros to View BoQ information |