| 1 | M&L for preventive and comprehensive maintenance ofCentral AC chiller plant of capacity 3 x 80 TR strictly through OEM i.e. M/S Blue Starforthe plant and equipment ofModel No. XAC2YS-080A. The scope of work is as under Section I & Section IISECTION I1. All equipment under contract will be serviced four times during contract period as per standard checklists2. All breakdown calls will be attended to during the contract period.SECTION II1. The compressor will be checked for proper functioning and if any defect is found, the same will be repaired. cost of compressor will be borne by customer2. Safety controls such as pressure cut outs will be tested for proper functioning and in case of any malfunctioning they will be either repaired or replaced accordingly.3. Air filters will be inspected and cleaned or replaced, if necessary. Cost of filters will be borne by the customer.4. Cooling coil will be inspected and cleaned, if necessary.5. The blower motor will be checked and any defects noticed will be attended to. Cost of repair will be borne by the customer. |
| 2 | 6. The driver set of the blower section will be inspected, belt tension adjusted and belts changed, if necessary. Cost of belt will be borne by customer7. Any defect in the electrical items and control wiring will be attended to. Cost of spares will be borne by customer8. Refrigerant gas will be topped up in the system as & when necessary. Cost of gas will be borne by customer9. Activities applicable to Air cooled units:a.The Condenser fan motor will be attended to. Cost of repair will be borne by the customer.b.The condenser coil will be inspected and cleaned.c. Any repairs in the condensor coil will be attended to. d. Repairs to refrigerant piping due to system problems will be attended to. Cost of spares will be borne by customere. Descaling of hot water and cold water pipelinesf. Controller & Actuater resetting, reprogramming & recommissioning. Control panel & hot water generater panel temperature settings updation as per load to increase COP of plant.NOTE :-(a) Scope of work also include all type of materials . |
| 3 | M&L foropening Head of Open Type reciprocating Compressor 20 TR Capacity (DB20) of MAKE : ACCEL and MODEL: SMC-6-65, dismantling completely 20 TR Capacity Compressor Parts in presence of MES Representative and display all the Parts/Components of Compressor for inspection of Engineer-in-Charge to ascertain the Serviceability of existing Parts for Repair/ Replacement of Unserviceable/Defective Parts, Re-assembling and Re-installation of Compressor in Original Position after repaire, Reconnecting and Making Functional in all respect, complete all as specified and as directed.NOTE:- Spare parts shall be measured and paid for separately under item No. 4to 14 here-in after. |
| 4 | Suction valve ring plate |
| 5 | Discharge valve ring plate |
| 6 | Oil filter assembly |
| 7 | Loading/Unloading frame |
| 8 | Shaft seal assembly |
| 9 | Piston |
| 10 | Sunction valve & retaing plate |
| 11 | Piston Pin & Ring |
| 12 | Cylinder liner without Suctoin valve |
| 13 | Supply,assembly and erection of GI sheet with TDF flange rectangular/square duct (as per existing size & shape) made out of\"L\"shaped hollow profile, duly factory boxed inclall acdcessories such as cornet, cleat, cattiage bolt, gasket and appropriate sealqant on longitudinal joints etc complete of size 22 gauge. |
| 14 | M &L for duct insulation withresin bonded fibre glass wool rollof density 24 Kg/cum, withfactory laminated aluminiumvapour barrier, thickness ofinsulation as 25 mmand the following:-(a) M&L for cleaning the ductsurface (to be insulated) by scrapping carefully with wirebrush etc to make the surface completely free of millscale, dirtdust, grease and other foreigntaterials, taking special care sothat all duct joints are sealedagainst any leakage.(b) M&L for applying rubberbased adhesive CPRX compound.(c) M&L for sealing of alllongitudinqal joints and circularoverlaps with and includingaluminium foil tape 50 mm wideto make the insulation leakproof.(d) M&L for securing theinsulation with and includingmechanically fastened nylon/steel straps of size 12mm/50mmat maximum intervals of 1.2 mtr. |
| 15 | M&L for MS frame work forcross arms, bracings, supports, clamps and back plates fabricated form structural steel sections including nuts, bolts, washers,, welding, bending cold or hot drilling holes for bolts in any shape or size as indicated or directed and inclusive of one primer coat, one under coat and one finishing coat of paint. |
| 16 | S&F \"V\" belt B-76 as suitable and approved after taking down the old unserviceable One, complete all as specified and as directed. |
| 17 | S&F RefrigerantHigh Pressure Gauge as approved and suitable including Taking down Old Unserviceable One, complete all as specified and as directed. |
| 18 | S&FRefrigerant Low Pressure Gauge as approved and suitable including Taking down Old Unserviceable One, complete all as specified and as directed. |
| 19 | S&F LP/HP Cut Out with Operating Range at 0/PSI to 30/PSI as approved and suitable including Taking down Old Unservice able One complete all as specified and as directed. |
| 20 | S&F Oil Pressure Gauge as approved and suitable including Taking down Old Unserviceable One, complete all as specified and as directed. |
| 21 | S&F Safety Valve for Condenser as approvedincluding Taking down Old Unserviceable One, complete all as specified and as directed. |
| 22 | S&F \"V\" Belt B-75 as approved and suitable including Taking down Old Unserviceable One, complete all as specified and as directed. |
| 23 | Supply & Filling only Compressor Oilas approved and suitable for Compressor of CENTRAL TYPE AC PLANT complete all as specified and as directed |
| 24 | Supply & filling only Refrigerant Gas R–22as approved and suitable for Compressor of CENTRAL AC PLANT/UNIT of Various Locations, complete all as specified and as directed. |
| 25 | Supply & filling only Refrigerant Gas R–407 Cas approved and suitable for Compressor of CENTRAL AC PLANT/UNITof various location complete all as specified and as directed. |
| 26 | S&F \"V\" Belt B 50 as approved and suitable including Taking down Old Unserviceable One, complete all as specified and as directed. |
| 27 | Taking down Defective Compressor Sealed Unit 12.5TRcapacitysuitable for R-407C/22 Refrigerant, 3 Phase 415 Volt after disconnecting all Electrical Connections and replaced the Same with New Com -pressor of Same Capacity and including Flushing old Gas and recharging with Appropriate Quantityof R-407C/22 Refrigerant Gas after nitrogen pressure testing upto 300 PSI for 24 hours & vaccuming to 500 Micrometer Hgcomplete all as specified and as directed.Make -Danfoss or equivalent |
| 28 | All as per Item No. 27 here-in-before but20 TR Capacity complete all as specified and as directed. |
| 29 | S&F \"V\" Belt B 72,as approved and suitable for Air blower motorincluding Taking down Old Unserviceable One, complete all as specified and as directed. |
| 30 | S&F PCB with display panel for Bluestar air 80 TR Central AC Plant complete all as specified and as directed. |
| 31 | S&F in repair 415V 10KA C -curveMCB TP 25 to63 Amp in the DB /LT/ Control panel with connection testing incl taking town old one complete all as specified and directed . |
| 32 | S&F in repair 240V 10KA C -curveMCB SP 6 to32 Amp in the DB /LT panel with connection testing incl taking town old one complete all as specified and directed.Make -L&T/Havells or equivalent. |
| 33 | S&F in repair 415V 10KA C -curveMCB TPN 25 to 63 Amp in the DB /LT panel with connection testing incl taking town old one complete all as specified and directed .Make -L&T/Havells or equivalent |
| 34 | Supply & fix pre filter box typpe having dust filtration capacity 90% efficiency down to 10 micron of size 600 x 450mm x 50 mm |
| 35 | S&F in repair MCCB 25 to 160 Amp 4 pole, 16 KA, 415V, 50Hz Capacity as approved and suitable for LT Panelof CentralAC Plant including Taking down Old Unserviceable One, complete all as specified and as directed. Make- L&T/GE/Havells/siemens |
| 36 | S&F in repair MCCB 250 Amp 4 pole, 25 KA, 415V, 50Hz Capacity as approved and suitable for LT Panel of Central and package AC Plant including Taking down Old Unserviceable One, complete all as specified and as directed. Make- L&T/GE/Havells |
| 37 | S&F in repair MCCB 400 Amp 4 pole, 36 KA, 415V, 50Hz Capacity as approved and suitable for LT Panel of Central and package AC Plant including Taking down Old Unserviceable One, complete all as specified and as directed. Make- L&T/GE/Havells |
| 38 | S&F in repair MCCB 630 Amp 4 pole, 36 KA, 415V, 50Hz Capacity as approved and suitable for LT Panel of Central and package AC Plant including Taking down Old Unserviceable One, complete all as specified and as directed. Make- L&T/GE/Havells |
| 39 | Supply & fix in repair pressure gauge with gauge pressure reading range between 0 kg/cm2 to 14 kg/cm2 complete all as as specified & directed. |
| 40 | Supply & fix in repair temperature gauge with temperaturereading range between 0 C to 50 Ccomplete all as as specified & directed. |
| 41 | S&F in repair temprature and humidity metarsuitable for readingfor temprature and humidity complete all as as specified & directed. |
| 42 | M & L for overhauling of condenser pump, hot water pump & chilled water pump monoblock pumpset complete with cleaning of impeller strainer and including replacement of rubber gasket, gland packings, bearing etc for following capacity - |
| 43 | a) 5 HP Capacity. |
| 44 | b) 7.5 HP Capacity. |
| 45 | Taking down Defective Burn out cooling tower motor of3 HP/720 RPM capacity after disconnecting all Electrical Connections and replaced the Same with New cooling tower motor of same capacityincluding testing and commissioning complete all as specified and as directed. |
| 46 | M&L Nitrogen gas pressure testing by pressurising with nitrogen gas upto 300 psi the complete system to find out the leakage & maintaining pressure for 24 hours and rectifying leakages in the system, vaccumising complete system of central A/C plant with double stage vaccum pump of - 2kg/Sq cm pressure & Vaccuming to 500 Micrometer Hg & then refilling with suitable gas as specified & directed by Engr in charge. |
| 47 | Taking down carefully burnt out Electric Driven motor of 7.5 HP Capacityfrom Foundation Channel after disconnecting Main Electric Supply from the Motor Starter Panel, dismantling Motor carefully for Checking, removing to Work-shop for repairing, Taking out burnt,Coils from the Slots of Stator, Other Accessories such as Ball Bearing, Rotor, Cleaning the Stator Slots and rewinding the same with New Supper Enameled Copper Winding Wire, Make - Devidayarwith appropriate Gauge and Quantity, Heating, Varnishing with Doctor Beck\"s insulated Varnish, Re-assembling the same after changing theold with new Ball Bearing & refixingto Original Position after repairing from Workshop, Re- installation on existing Channel and Re-connecting to Electric Supply, Commissioning and Testing, complete all as specified and as directed. |
| 48 | All as per Item No. 45 here-in-before but5 HP CapacityMotor. |
| 49 | All as per Item No. 45 here-in-before but3 HP CapacityMotor. |
| 50 | All as per Item No. 45 here-in-before but 10 HP Motor. |
| 51 | All as per Item No. 45 here-in-before but 15 HP Motor. |
| 52 | All as per Item No. 45 here-in-before but 25 HP Motor. |
| 53 | M&L for descaling of copper tubes of condensor suitable for 20 TR& 12.5 TR capacity compressor by circulating discaling solution ( diluted HCL) with pump and rodding into the tubes for removing all deposited materials complete all as specified and as directed. |
| 54 | Supply and replacing of liquid line filterdrier for use with CFC, HCFC & HFC , R22, R407C,of any capacity complete all as specified and directed.Make : EMERSON /CatchAll /Indfoss |
| 55 | Supply & fix in repair single phase preventer working on 3 phase 440 supply complete all as specified and as directed. |
| 56 | Supply & fix in repair electronic timer working on 240 V AC, 50 Hz with timing range 3sec - 120sec complete all as specified and as directed. |
| 57 | Supply & fix in repair thermal overload relay suitable for fixing with contactor withrelay range suitable for 3 hp Dol starter motor, 5 hp, 7.5 hp, 10 hp & 15 hp star delta starter complete all as specified and as directed. |
| 58 | Supply & fix in repair thermal overload relay suitable for fixing with contactor withrelay range suitable for 25 hpstarter delta starter motor complete all as specified and as directed. |
| 59 | Supply & fix in repair contactor with AC3 rating 25 Amps & AC1 rating 45 Amps complete all as specified and as directed. |
| 60 | Supply & fix in repair universal controller suitable for controlling the rotational movement of damper actuators complete all as specified and as directed. Make Siemens, Model No. RLU222 |
| 61 | Supply & fix in repair electrically controlled damper actuators suitable for controlling flow rate of water in either hot or cold water line complete all as specified and as directed.Make Honeywell, Model No. CN72202007 |
| 62 | Supply & fix in repair contactor with AC3 rating 65 Amps & AC1 rating 100 Amps complete all as specified and as directed. |
| 63 | Supply and replacing expansion valve including taking down of following sizes |
| 64 | (a)valve of capacity up to 11 TR |
| 65 | (b)valve of capacity up 30 TR |
| 66 | (c)valve of capacity up 40 TR |
| 67 | S&F25 KW water heating element suitable in size for use in hot water generator complete all as specified and as directed. |
| 68 | S&F direct reading ammeter with measuring range 0 Amps to 40 Amps complete all as specified and as directed. |
| 69 | SCHEDULE OF CREDIT |
| 70 | DEDUCT \"TOTAL AMOUNT OF CREDIT\" AGAINST \"SCHEDULE OF CREDIT\"Bidder(s) shall/ will Quote the EQUAL AMOUNT (as per SCHEDULE OF CREDIT of Tender Documents) under Column \"UNIT RATE\" (M) against Row No. 162 . |