| 1 | Excavation in foundation in ordinary soil lift upto 1.5 m & lead up to 30 m all complete without Royalty |
| 2 | Concrete with 4 cm gauge brick ballast, fine sand and cement in proportion of 12:6:1 in foundation, Including all completion of the work. |
| 3 | M-150 Class brick work in 1:6 cement mortar in foundation and plinth Including supply of all materials, labour and T&P etc. required for proper completion of the work |
| 4 | M-150 Class brick work in 1:6 cement mortar in super structure for wall of one brick wall including supply of all materials, labour and T&P etc. required for proper completion of the work [5.i.no.303+309-310) |
| 5 | R.C.C work with 1:2:4 cement.coarse sand and 20 mm stone grit in lintal and sunshade including supply of all materials, labour and T&P etc. required for proper completion of the work (S.i.no.283 |
| 6 | R.C.C work with 1:2:4 cement.coarse sand and 20 mm stone grit in Stab including supply of all materials, labour and T&P etc. required for proper completion of the work (S.i.no.284) |
| 7 | M.S or iron work in plane work as R.C.C including cutting binding etc. all complete (AOR) |
| 8 | 12 mm thick cement plaster in cement and F.sand mortar in 1:4 over brick work including supply of all materials, labour and T&P etc, required for proper completion of the work (S.i.no.584) |
| 9 | 25 mm thick PCC floaring in 1:2:4 with cement, coarse sand and 20 mm gauge stone grit with neat cement finished with 8 cm thick base concrete 1:4:8 with cement, fine sand and 40 mm gauge brick ballast including supply of all materials, labour and T&P etc. required for proper completion of the work (S.i.no.601) |
| 10 | Earth filling in ordinry soil including ramming and dressing the surface to required level & slopes etc. and also i/c cartage 1 km without royalty (AOR) (S.l.no.253) |
| 11 | Finishing of wall with water proofing cement paint of required shade over new brick work i/c base coat of white cement including supply of all materials, labour and T&P etc. required for proper completion of the work (5.1.no.660+661) |
| 12 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 (AOR) |
| 13 | Laying B.O.E soling with 5.0.B bricks including supply of all materials, labour and T&P etc. required for proper completion of the work (AOR) |
| 14 | S/Fixing of Ingraution atone Size 3’*2’ including writing with required pedestal & Photo graphs Please Enable Macros to View BoQ information |