| 1 | Earthwork in hard soil with initial lead and lift including rough dressing and breaking clods upto 5cm to 7cm size and laying in layers each layer not exceeding 0.3m in depth etc. complete. |
| 2 | Filling foundation and plinth with filling sand laying in layers including ramming, watering, compacting including cost, conveyance and royalty of sand from approved quarry and other taxes if any with all leads, lifts, T&P etc complete the items of work in all respect as per specification and direction of Engineer in charge. |
| 3 | CC (1:4:8) using 40 mm size and down graded crusher broken HG stone metal free from weathered surface of approved quality from approved quarry in foundation and plinth including laying concrete in layers with due compaction, watering and curing including cost, conveyance, royalty and taxes of all materials with all lead, lifts and delifts, T&P etc required for completion of the work in all respect as per direction of the Engineer-in-charge. |
| 4 | RCC work of M-20 grade with 20 mm and down grade black hard granite chips including cost, conveyance, royalty and all taxes of all materials with all leads, lifts, T&P etc including rigid and smooth centering, shuttering and dismantling the same after the curing of RCC work for 28 days complete the item of work in all respect as per specification and direction of Engineer-in-charge. RCC Plinth Beam |
| 5 | RCC Column |
| 6 | RCC Lintel |
| 7 | RCC Wall Beam |
| 8 | RCC Chhaja |
| 9 | Stair Case |
| 10 | RCC Roof Slab |
| 11 | Brickwork with Fly Ash bricks in cement mortar (1:6) in Foundation and Plinth including watering curing etc |
| 12 | Fly ask brick work(1:6) for superstructure with cost carriage etc |
| 13 | Labour charges for straightening coiled or bent up MS rods including cutting, bending and welding if required and tying the grills, laying and placing in proper position as per design including cost, conveyance, taxes etc of tested MS/TS rod with testing data of required specification & cost of binding wires of 18 to 20 gauge, labour, T&P required for the work complete and as per the specification and direction of the Engineer-in-charge. |
| 14 | 12mm thick cement plaster (1:6) including Cement Punning including watering curing to required period including cost conveyance, royalty of all materials, T&P complete etc. as per specification and direction of Engineer in charge. |
| 15 | 16mm thick C.P(1:6) cm below plinth and (above ground level) |
| 16 | 16mm thick CP (1:6) cm for 10\" wall |
| 17 | 12mm thick C.P (1:4) C.M for 5\" wall |
| 18 | 6mm thick C.P (1:4)cm will all cost, carriage etc. complete |
| 19 | 12mm thick (1:4) cm with cement punning over wall to receive roof slab |
| 20 | Fixing vertified tiles in fIoors,treads (600mm x 600mm) and landings on 25mm thick bed of cement mortar (1:1) joined with neat cement slurry mixed with pigment to match the shade of the tiles including rubbing and polishing including cost of tile. |
| 21 | Fixing vertified tiles in fIoors,treads (600mm x 600mm) and landings on 25mm thick bed of cement mortar (1:1) joined with neat cement slurry mixed with pigment to match the shade of the tiles including rubbing and polishing including cost of tile. |
| 22 | Fixing glazzed tiles in dados,skirting and in rises of steps on 12mm thick bed of cement plaster (1:3) joined with neat cement slurry mixed with pigment to match the shade of the tiles including |
| 23 | Fixing glazzed tiles in dados,skirting and in rises of steps on 12mm thick bed of cement plaster (1:3) joined with neat cement slurrv mixed with oiament to match the shade of the tiles includina |
| 24 | Fixing PVC door to the toilet |
| 25 | Supplying M.S Door & Window with cost, carriage etc. complete |
| 26 | Painting two coats enamel paint over one coat primer on M.S doorand window |
| 27 | Cement washing one coat including cost of materials etc. complete |
| 28 | Wall painting two coats with weataher coat paint over a coat of primer ofapproved shade including cost of paint. |
| 29 | Wall painting two coats with plastic emulsion paint over a coat of primer ofapproved shade including costof paint. |
| 30 | Supplying ,fitting, stainless steel 304 grade hand railing using 50mm dia of2mm thick circular pipe of size 32mm x 2mm three rows |
| 31 | Add for Site Development |
| 32 | Electrfication 10% |
| 33 | PH Work 10% |
| 34 | Fly ash bricks works (1:6) for superstructure with all cost, carriage etc. complete |
| 35 | RCC work of M-20 grade with 20 mm and down grade black hard granite chips including cost, conveyance, royalty and all taxes of all materials with all leads, lifts, T&P etc including rigid and smooth centering, shuttering and dismantling the same after the curing of RCC work for 28 days complete the item of work in all respect as per specification and direction of Engineer-in-charge.RCC COLUMN & RCC WALL BEAM |
| 36 | RCC LINTEL |
| 37 | RCC Chhaja |
| 38 | Stair Case |
| 39 | RCC Roof Slab |
| 40 | Cutting,bending & binding of MS Rod with all cost, carriage etc. complete |
| 41 | 12mm thick C.P (1:6)CM complete outside wall |
| 42 | 16mm thick CP (1:6) CM Complete inside for 10\" wall |
| 43 | 12mm thick C.P (1:4) cm compleye (inside wall) for 5\" wall |
| 44 | 6mm thick C.P (1:4) cm complete (celing) |
| 45 | Fixing vertified tiles in fIoors,treads (600mm x 600mm) and landings on 25mm thick bed of cement mortar (1:1) joined with neat cement slurry mixed with pigment to match the shade of the tiles including rubbing and |
| 46 | 12mm thick C.P in cm(1:4) with cement punning over wall top to receive roof slab |
| 47 | Fixing glazzed tiles in dados,skirting and in rises of steps on 12mm thick bed of cement plaster (1:3) joined with neat cement slurry mixed with pigment to match the shade of the tiles including rubbing and polishing including cost of tile. |
| 48 | Fixing vertified tiles in fIoors,treads (600mm x 600mm) and landings on 25mm thick bed of cement mortar (1:1) joined with neat cement slurrymixed with pigment to match the shade of the tiles including rubbing and polishing including cost of tile. |
| 49 | Fixing glazzed tiles in dados,skirting and in rises of steps on 12mm thickbed of cement plaster (1:3) joined with neat cement slurry mixed with |
| 50 | Supplying MS Door & Window with cost carriage etc. |
| 51 | Fixing PVC door to the toilet |
| 52 | Painting two coats enamnel paint over one coat primer on MS Door & Window |
| 53 | Cement washing one coat including cost of all labour and materials etc. complete |
| 54 | Wall painting two coats with weataher coat paint over a coat of primer of approved shade including cost of paint. |
| 55 | Wall painting two coats with plastic emulsion paint over a coat of primer of approved shade including costof paint. |
| 56 | 25mm grading (1:2:2) to the roof on the 1st floor, portico & open terrace |
| 57 | Fitting, fixing stainless steel 304 grade hand rifling using 50mm dia of 2mm circular pipe of size 32mm x 32mm x 2mm three rows |
| 58 | Electrfication 10% |
| 59 | PH Work on LS |
| 60 | Earthwork in hard soil with initial lead and lift including rough dressing and breaking clods upto Scm to 7cm size and laying in layers each layer not exceeding 0.3m in depth etc. complete. |
| 61 | Filling foundation and plinth with well watered and rammed to recevied maetal concrete. Including cost ,carriage,roayIty taxes of materials etc.complete. |
| 62 | Providing C.C(1:4:8) using 4cm metal with cost carriage etc |
| 63 | Brickwork with Fly Ash bricks in cement mortar (1:6) in superstructure including watering curing etc. |
| 64 | RCC wok of M-20 grade with 20mm downgraded size hard granite chips including hoisting and laying complete in layers watering, curing, centering, shuttering with all cost labour T & P etc. complete.RCC Slab |
| 65 | PCC (1:2:4) including hoisting and laying complete in layers watering, curing, centering, shuttering with all cost labour T & P etc. complete. |
| 66 | Straightening cutting M.S. rod or steel to required size and out of either stright or coil rod bending , binding taying the grills for R.C.C work and hosting and placeing in postion including cost and conveyance of M.S. rod cost and conveyance and of binding wire 18 to 20 gauge required for binding and tying the grills and including all labour charges complete.(No separate payment will made towards weight or binding wire paymentswill be made on weight of M.S.Rod only) Roof Slab |
| 67 | 12mm thick (1:4) cm with cement punning over wall to receive roof slab |
| 68 | Add for Site Development |
| 69 | Fly ash bricks works (1:6) for superstructure with all cost, carriage etc. complete |
| 70 | RCC wok of M-20 grade with 20mm downgraded size hard granite chips including hoisting and laying complete in layers watering, curing, centering, shuttering with all cost labour T & P etc. complete.RCC column |
| 71 | RCC Lintel |
| 72 | RCC Chhaja |
| 73 | RCC Roof Slab |
| 74 | Straightening cutting M.S. rod or steel to required size and out of either stright or coil rod bending , binding taying the grills for |
| 75 | 12mm thick cement plaster in cement mortor (1:6) over brick work including all cost conveyance etc.complete |
| 76 | 16mm thick cement plaster in cement mortor (1:6) over brick work including all cost conveyance etc.complete |
| 77 | 12mm thick C.P (1:4) C.M for including all cost conveyance etc.complete |
| 78 | Fixing vertified tiles in fIoors,treads (600mm x 600mm) and landings on 25mm thick bed of cement mortar (1:1) joined with neat cement slurry mixed with pigment to match the shade of thé tiles including rubbing and polishing including cost of tile. |
| 79 | Providing and fixing Glazed Ceramic tiles in dados,skirtin9 and in rises of steps on 12mm thick bed of cement plaster (1:3) joined with neat cement slurry mixed with pigment to match the shade of the tiles including rubbing and polishing including cost of tile |
| 80 | Wall painting two coats with weataher coat paint over a coat of primer of approved shade including cost of paint. |
| 81 | Wall painting two coats with plastic emulsion paint over a coat of primer of approved shade including costof paint. |
| 82 | Supplying M.S Door & Window with cost, carriage etc. complete |
| 83 | Electrfication 10% Please Enable Macros to View BoQ information |