| 1 | Labour only for attending day to day external/treated water supply complaints of all nature including grey water pipe leakage i.e leakage in water supply pipe lines , fitting/fixture, over flow of overhead tank, no water supply in supply tank/direct kitchen tap and grey water supply in various locations & taking out water from trenches during repair including note downthe complaints in complaint register complete all as specified and as directed(Note:- Any material required for attending complaints shall be measured and paid separately under respective item herein after as \"Supply only\"). |
| 2 | Labour only for attending day to day electric supplycomplaints of day to day maintenance of existing LT Panels involving replacement of meterials including connecting electrical accessories / spares of water supply installation from 0830 hrs to 1730 hrs and electrical fitting & light, short circuits in pump house including Note down the complaints from various locations in complaints register and distribution to the trademen complete all as directed. (Note:- (i) Any meterial required for atteding complaints shall be measured & paid seperately under respective item here after as \"supply only\")(ii) The suitable shift duites as deems fit shall be decision of the Engr-in-charge |
| 3 | Notes for Item No 1.01 & 1.02 :-(i) Any material required for attending complaints shall be measured & separately under respectvie items here - in- after.(ii) The complaints shall be attended and the defetcs shall be rectified by a team of matric qualified having minimum 03 years experienced electrician/Plumber as applicable assisted with adequate number of helpers as directed by Engineer-in-charge.(iii) The complaints shall be attended & defect shall be rectified within 08 hrs commencing from date and time of notifying the complaint failing which a penalty @ Rs 200/- per complaint per day (08 hrs) shall be levied upon/imposed on the contractor and recovery shall be made from contractor\"s dues.(iv) In case, after checking & attending the defect, it is not possible to rectify the defect within 08 hrs, the facts shall be brought to the notice of Engineer-in-charge by the contractor/his rep.IfEngineer-in- charge is satisfied with contractors view, no recovery will be made.(v)While attending the complaint of water supply if earth workis required then the same shall be measured and paid seperately under appropriate itemof Sch \"A\" of BOQ. However, no extra payments shall be made for dewatering.(vi)Cutting of GI pipe in position and threadingis also deemed to be included in the job rate (Fittings and fixtures will be measured and paid separetely under respective items of Sch as \"supply only\").(vii) All T&P required for attending the Complaints shall be provided by the contractor.) |
| 4 | (viii) The Pipe Fitter shall always be in possession of die set complete with cutters,Taps, Pipe wrench, Chain wrench, Caulking tools, complete set of spanners and ladders etc asrequired at site.(ix)The Electrician shall always in possession of all Electrician tools, LT Megger, Earth Tester, Multimeter, Crimpling tool, insulation tape, Hand gloves etc required at site. (x) Rate for taking down/out existing & fittings & fixtures and refixing to make it functional shall be into account. All the fitting & fixtures shall be measured and paid supply only in respective items of BOQ i.e. Ser Item No. 3 to 16, 17, 18.01 to 18.05, 24, 44 to 50 and 54 to 60.(xi) A BOO ordered for material procured by contractor and taken on charge through RV and complaint wise dockets will maintained and USR\"s duly vetted by AO GE (E/M) for procured materials issued for incorporation in work will be mentioned in BOO. BOO will concorn/approved by Accepting Officer in one time for complete materials to be consumed in work and if any balance quantity of material left with contractor the same will received back on credit USR\"s & kept on record. |
| 5 | Supply only GI Socket \"medium grade\" ISI Marked superior / standard of a make of following sizes :- |
| 6 | 15 mm bore |
| 7 | 20mm bore |
| 8 | 25mm bore |
| 9 | 40mm bore |
| 10 | 50mm bore |
| 11 | Supply only GI Elbow \"Medium grade\", ISI Marked superior / standard of a make of following sizes : - |
| 12 | 15 mm bore |
| 13 | 20mm bore |
| 14 | 25mm bore |
| 15 | 40mm bore |
| 16 | 50mm bore |
| 17 | Supply only GI Union \"Medium grade\", ISI Marked superior / standard of a make of following sizes : - |
| 18 | 15 mm bore |
| 19 | 20 mm bore |
| 20 | 25 mm bore |
| 21 | 40 mm bore |
| 22 | 50 mm bore |
| 23 | Supply only \"GI Nipple\" of suitable length as required at site & ordered by EIC both end screwed \"Medium Grade\", ISI marked superior / standard of a make of following sizes: |
| 24 | 15 mm bore |
| 25 | 20mm bore |
| 26 | 25mm bore |
| 27 | 40mm bore |
| 28 | 50mm bore |
| 29 | Supplyonly GI Reducing socket \"medium grade\" ISI marked superior / standard of a make of the following sizes :- |
| 30 | 20 mm x 15 mm bore |
| 31 | 25 mm x 20 mmbore |
| 32 | 50 mm x 40 mmbore |
| 33 | 25 mm x 15 mmbore |
| 34 | Supply onlyGI Solid plug heavy duty ISI Marked superior / standard of a make of following sizes : - |
| 35 | 15 mm bore |
| 36 | 20 mm bore |
| 37 | 25 mm bore |
| 38 | 40mm bore |
| 39 | 50mm bore |
| 40 | Supply onlyGI Tee \"Medium grade\" ISI Marked superior / standard of a make of following sizes : - |
| 41 | 15mm x 15mm x 15mm |
| 42 | 20 mm x 20 mm x 15 mm |
| 43 | 20 mm x 20 mm x 20 mm |
| 44 | 25 mm x 25 mm x 25 mm |
| 45 | 25 mm x 25 mm x 15 mm |
| 46 | 40 mm x 40 mm x 40 mm |
| 47 | 50 mm x 50 mm x 50 mm |
| 48 | 50 mm x 50 mm x 25 mm |
| 49 | Supply onlyPTMTfloat valve of sizes as under, with epoxy coated aluminium rod 250mm length and high density plastic ball of 150mm dia complete all as specified and as directed:- |
| 50 | 15 mm bore |
| 51 | 20 mmbore |
| 52 | 25 mmbore |
| 53 | 50 mmbore |
| 54 | Supply only Gun metal gate valve, with iron wheel head screwed both ends for iron pipe as per IS-778 complete all as specified and as directed of following sizes:- |
| 55 | 15mm |
| 56 | 20 mm |
| 57 | 25 mm |
| 58 | 40 mm |
| 59 | 50 mm |
| 60 | Supply only of following items: |
| 61 | lead pig bar |
| 62 | Spun Yarn |
| 63 | Labour only for run lead joint by using new lead and new spun yarn including jointing material for CI/DI pipes of following size/bore. (Note: Run lead and spun yarnused for repairing the joints following sizes of pipe will be measured and paid seperately under respective items as supply only.) |
| 64 | 80mm |
| 65 | 100 mm |
| 66 | 150 mm |
| 67 | Supply only Nuts ,Bolts and Washers 25 to 150 mm long of 6 to 20 mm dia complete all as specified and as directed. |
| 68 | Supply only 15 mm bore Bib tap of PTMT, any tint, high pressure screwed for male/ female threaded, forpipe of size 15 mm bore complete all as specified and as directed. |
| 69 | Taking up old GI steel tubing of following sizes with connections from Trenches/floors/walls including cleaning for refixing or removal complete all as specified and as directed.Note :- (i) Excavation & earth work shall be measured & paid separetely. |
| 70 | 15mm |
| 71 | 20 mm |
| 72 | 25 mm |
| 73 | 40 mm |
| 74 | 50 mm |
| 75 | Supply & Laying ofGI pipe \"medium grade\" ISI mark including all fittings in old/new positions in trenches/wall/floor complete and making good the distributed surfaces as per existing as directed of following sizes. (Note:- Excavation and earth work will be measured and paid separately.) |
| 76 | 15mm |
| 77 | 20 mm |
| 78 | 25 mm |
| 79 | 40 mm |
| 80 | 50 mm |
| 81 | Taking up CI/DI Pipe of following sizes including all fittings) with spigot and socketed endsand lead tyton joints includingburning out lead jointsand recovering lead and including cleaning for refixing or removal, making good disturbed surface complete all as specified and as directed.(Note:- (i) Excavation & earth work shall be measured & paid separetely.(ii) Layout plan for laying of DI pipe shall be given by EIC in writing.(iii) DI pipe whole quantity of tender shall be procured by contractor for payment in 1st RAR as material lying at site. |
| 82 | 80mm |
| 83 | 100mm |
| 84 | 150 mm |
| 85 | 200 mm |
| 86 | Supply, layingjointing,testingDIpipe with class-K-7 spigot socketed ends , conforming to IS-8329 laid in trenches including providing route indicators of suitable height and laying at spacing of @ 50m center to center at GL mentioning name of contractor, date of execution & CA No with name of workof the following sizes complete all as specified and directed by Engineer-in-Charge.(Note : (i) Tyton Joint, Excavation & earth work shall be measured & paid separetely.(ii) Layout for DI Pipe shall be approved by GE before commencement of work.(iii) DI pipe whole quantity of tender shall be procured by contractor in one time and the same will be paid in 1st RAR as material laying at site.(iv) Cost of route indicator shall be deemed included in quoted unit rate. |
| 87 | 80mm |
| 88 | 100mm |
| 89 | 150 mm |
| 90 | 200 mm |
| 91 | Material & Labour for rubber gasket joint including jointing material for CI/DI Pipe of following sizes complete all as specified and as directed . |
| 92 | 80mm |
| 93 | 100mm |
| 94 | 150 mm |
| 95 | 200 mm |
| 96 | Material and labour for DI specials like bends, tapers any type any radius and angle, Tee pieces single branch `Y\" junction, double branch, cross (all sockets or socket and spigot) collars, DI connecting pieces one end flanged and other end spigot/socket, reducers/bell mouth pieces one end flanged and other end tapering as bell mouth for the size up to 250 mm dia bore comp |
| 97 | Supplying, laying, jointing, welding and testing MS Pipe (Heavy class\"C\") IS : 1239/3589, of followiing sizes laid in trenches or in Horizontal/Vertical/inclined position orlaying on floors for connectionsfor suction, to header andconnected to out going water main CI/DI pipe line, forfollowing size including taking out the old unserviceable pipes :- Note:- (i) MS Flangesincl fabrication work will be measured and paid separately. |
| 98 | 80mm |
| 99 | 100 mm |
| 100 | 150 mm |
| 101 | Supply, fixing, jointing & testing cast Iron Sluice Valve of following size ISI Marked, flanged ends drilled pressure rating PN-1.0, PD Short body,Confirming to IS 14846 -2000, having stainless steel spindle with cast iron operation wheel at top including taking out unserviceable sluice valve complete all as specified and as directed . (Note:- (i) Flanged joints complete with jointing material shall deemed to be included in the unit rate of this item. |
| 102 | 80mmdia |
| 103 | 100mmdia |
| 104 | 150mmdia |
| 105 | 200mmdia |
| 106 | Supply and Fixing in replacement of CI Foot valve offollowing size , Flanged ends, Swing type opration with rubber sheet as per IS-4038 including taking out unserviceable of following sizes complete all as specified and directed by Engineer-in-Charge. (Note :- (i) Flanged joints complete with jointing material shall deemed to be included in the unit rate of this items. |
| 107 | 80mmdia |
| 108 | 100mmdia |
| 109 | 150mmdia |
| 110 | M&L applying painting with two coat of synthetic enamel paint as per existing pattern on pipe surface/header connectionincluding preparation of surfaces by scratching and removing the rust, applying one coat red oxide primer complete all as specified and as directed. |
| 111 | M&L removing weeds and wild grass inside the installations using chemical spray and trimming trees and unwanted plants using petrol operated Tree/Grass cutting tools and dressing of the surface by scrapping high patches and filling low patches with the scrapping soil to give an even and neat look to the site and disposing off all the unwanted grass, bushes and debris complete all as specified and directed by the Engineer-in-Charge. |
| 112 | M&L openning of gland packing coupling and removing the unserviceable gland rope from Sluice valve of size 80 to 300 mm dia and supply & fixing the new gland rope all as per existing size gland rope complete all as specified and directed. |
| 113 | M&L Decorative ultra slim round profile LED lightning fixture 20W,6000K, with extruded polycarbonate environmental friendly energy efficient incl taking down old unserviceable light fitting complete all as specified and as directed. |
| 114 | Supply and fixing in replacement 45 watt LED street light New generation energy saving and environmental friendly long life LED street light made up of pressure die cast aluminium housing with high efficient LED as lighting source and PC cover having TOP Opening seperate driver compartment with IP66 protection and impact resistance of IK07including making connections with providing new GI pipe 0.6mtr on angle bracket fixing on wall and connectng to ceiling rose with apropriate wire |
| 115 | Excavation in trenches not exc 1.5 M wide and not exc 1.5 M indepth for pipe line, etc in soft/ loose soil getting out and levelling of bottom surface to required level all as specified and as directed. |
| 116 | Returning filling in, including spreading, leveling, watering and well ramming in layers not exc 25 cm thick complete all as specified and as directed. |
| 117 | Removing excavated material to a distance not exc 50 m and depositing where directed not exc 1.5 meters above the starting point complete all as specified and as directed. |
| 118 | Labour work required for taking out suction pipe from sump of any capacity 80 mm to 200 mm size screw/ flanged typeand relowering after refixing in position the same duly cleaned / minor repair if any required such as replacement of rubber gasket / lifting bolts & nuts including making thread for the suction pipes off sizes etc complete all as specified and directed by Engineer - in - charge |
| 119 | Testing of drinking water being collected from local source (bore wells/shallow wells/under ground sumps) in the area under AGE(U) W/S No I and submission of detailed test reqport to the office of Engineer-in-Charge.(a)Collection of water from different sources of water ie Sump, bore wells& shallow wells in sterilized bottle for testing of water of different sources from Govt Approvedlaboratory as mentioned in PS.(b)Carrying out minimum essential testing of water as per IS 10500-1991 mandatory for chemical colour, odour, taste, turbidity, Lead, PH value TDS total hardness, iron, chloride, fluride and residual free chlorine and Bacteriological total Collie from organisms per 100 ml (MPN) and E Collie in 100 ml) and submission the test report to EIC and after ward the same will be submit by EIC to AO with their specific recommendation regarding suitability of water for drinking purpose. |
| 120 | Supply only following electrical items : |
| 121 | PVC insulation tape role 15mm wide, 20 Running meter long |
| 122 | PVC insulated multistranded copper conductor wire of size 1.5 Sqmm, 1100 volts grade \"FRLS type\" |
| 123 | PVC insulated multistranded copper conductor wire of size 2.5 Sqmm, 1100 volts grade \"FRLS type\" |
| 124 | Suppply & fixing in replacementMCCB 200Amps, 3 pole , breaking capacity36 kA, connection complete all as specifed & directed |
| 125 | Suppply & fixing in replacementMCCB 100Amps, 3 pole , breaking capacity25 kA, connection complete all as specifed & directed |
| 126 | Suppply & fixing in replacementMCCB 63Amps, 3 pole , breaking capacity16 kA,connection complete all as specifed & directed |
| 127 | Suppply & fixing in replacementanalog type time switch FM 1/Quartz daily 240 volts , AC, 50 Hz code J 6107B 204connection complete all as specifed and directed. |
| 128 | Supply , installation, commissioniong and testing of soft starter suitable for motor capacity 15HP 3 phase 415 Volts 50 Hz with Compact design, with built-in bypass contactor, Essential motor protection, Selectable soft starting profiles, Flexible communication options, Excess start time settling including taking down old starter and related accessories and deposited to MES store yard complete all as specified and directed. |
| 129 | Supply, Installation Testing & Commissioning of ULTRASONIC LEVEL SENSORS Water Level Sensor for underground tanksuitable forup to 6 meter water level depth of U/G sump, with dead band of less than 0.6meter, IP66 protection, accuracy of 0.25% of F.S. and RS485 Modbus RTU communication protocol, Capable for working in ambient temperature of 0 degree Centigrade to 75 degree Centigrade, non-condensing at 25 degree Centigrade and humidity up to 95% with response time of less than 1 sec with 230VAC to 24VDC, 50Hz power supply, LCD display type, vertical type mounting on top of OHTswith all connectionsand fixing includingclamp, nut-bolt etccomplete all asspecified and as directed. |
| 130 | Supply and fixing in replacement 3 pole power contactor ML-1.5, 25 Ampssuitable for fixing in existing panel complete all as specified and as directed. |
| 131 | Supply and fixing in replacement 3 pole power contactor ML-2, 32-40 Ampssuitable for fixing in existing panel complete all as specified and as directed. |
| 132 | Supply and fixing in replacement of over load relay, type ML 1.5 relay, range 10-16 Amp complete all as specified and as directed. |
| 133 | Supply and fixing in replacement of over load relay, typeML-2 starter range 9-14 Amps complete all as specified and as directed. |
| 134 | Supply and fixing in replacement of over load relay, typeML-2 starter range 13-21 Amps complete all as specified and as directed. |
| 135 | Supply and fixing in replacement of over load relay, typeML-2 starter range 20-32 Amps complete all as specified and as directed. |
| 136 | Supply and fixing in replacement single phase preventor, type VSP-IIcomplete all as specified and as directed. |
| 137 | Supply and fixing rotational moulded polyethylene water storage tank, cylindrical vertical with closed top, 500 ltrs capacity, tripple layered hoisted and fixed in position after taking down as existing at site (of any capacity) complete all as specified and as directed. Note: (i) For Pump Priming purpose in pump house. |
| 138 | Taking down cement plaster or cement lime plaster on PCC/Stone Surface/Brick surfaces including raking out joints hacking for keyscrubbing down with water etc complete all as specified and directed . |
| 139 | M&L Rendering 15 mm thick in CM (1:4) on fair faces of brickwork or concrete surfacesfinished even & smooth complete all as specified and directed . |
| 140 | Demolition of brick work or stone/boulder masonry built in cement mortar including all quoin jambs pillars etc complete all as specified and directed. |
| 141 | M&L Brick work with sub class \"B\" old size bricks bricks straight or curved on plan exceeding 6 m mean radious built in cement mortar 1:6 complete all as specified and directed. |
| 142 | Dismantling of cement concrete in ground floors and pavings n exc 15 cm thickness below or above ground level complete all as specified and directed. |
| 143 | M & L PCC (1:3:6) type C2 using 40mm graded aggregate as in foundation for including fair finish even and fair to exposed surfaces without using extra cement complete all as specified and as directed |
| 144 | M&L Tank Cover/Valve Chamber Cover made out of mild steel plain sheet of any thickness as in cover for existing valve chamber along with provision of angle iron frame cut to length, bent to shape, welding and fabricate to requiredd shape/ size incl necessary fixing materials like hinges, nut/ bolts etc withtwo coat of synthetic enamel paint overa coat of red oxide primarand incl lifting handle andtaking out the old unsv valve chamber cover complete all as specified and directed. |
| 145 | M&L Testing the cables with high voltage DC testing machine and locating the fault in the cables by fault locating machine to pin point exact position of fault, disconnecting faulty 1100 volts LT cables of different sizes from both ends , removal of fault , Reconnection and testing of cables after removal of fault complete all as specified and directed by Engr-in-charge. NOTE:(a) 1100 volt cables and joints shall be measured and paid for seperately under respective items of schedule (b) Retrieved old serviceable cable cover/ bricks will be laid in trenches for cable protection. If extra PCC cover / bricks and sand required at site shall be measured and paid separately under respective items of BOQs. (c) Exacavation and earth work will be measured and paid for separately under respective items of schedule. |
| 146 | Supply and fixing in replacement heat shrinkable jointkit suitable for XLPE cableinsulated screened PVC bedded armoured electric power cable heave duty1100 volts grade, with straded aluminium conductor, cross sectional area 25/35 Sqmm, 3.5 core after taking down/out faulty portion as exists compete all as specified and as directed. |
| 147 | M&L fabrication (welding work) of MS Header /any size upto 300 mm MS pipe at various pump house for arresting leakages on header complete all as specified and directed. |
| 148 | Supply and installation of flanged ends Water Meterwoltman type of size 50mm dia including testing and making good connection with flanged ends, with gasket rubber sheet and nut & bolts etc ISI Marked fixing in horizontal/incline/vertical position,including taking out unserviceable of following sizes complete all as specified and as directed at site by the Engineer-in-Charge. |
| 149 | Supply , installation, commissioniong and testing of smart water pump control system in borewell up to 10 HP including varun controller, remote, 02 no. of antennas (RF+GSM), user manual M2M SIMcomplete all as specified and as directed at site by the Engineer-in-Charge.Features: LCD Display, Dry run and over run protection, Smart Scheduling, App based control & Notifications, Internet free control with GSM and app control. |
| 150 | M&L for cleaning of dewatering/rain water, any storage capacity of waterby removing mud, grits, debris etc and through out not less than 50 mtr complete all as specified and as directed. |
| 151 | An amount of Rs 1,62,025.00 shall be deducted from BOQ on account of schedule of credit |