|
| 1 | I-A. Skilled Workers - 6 Nos. Supervisor, Electrician, Carpenter and Plumber |
| 2 | Total of Basic + VDA for a month (26 X minimum wages per day) |
| 3 | EPF (Subject to maximum ceiling of ₹15000/ salary per month or any amount specified by EPFO from time to time) |
| 4 | ESI (Payable only for employees receiving salary upto ₹21,000/- per month or any amount specified by ESIC from time to time) |
| 5 | Bonus (The contributions are payable only for employees receiving salary upto ₹21,000/- per month or any amount specified by competent authority from time to time) (To be paid on reimbursement basis) |
| 6 | Total wages per month |
| 7 | Total wages per year |
| 8 | Total wages for contract (01.04.2026 to 31.03.2028) |
| 9 | I-B. Semi-Skilled Workers - 01 No Gardener |
| 10 | Total of Basic + VDA for a month (26 X minimum wages per day) |
| 11 | EPF (Subject to maximum ceiling of ₹15000/ salary per month or any amount specified by EPFO from time to time) |
| 12 | ESI (Payable only for employees receiving salary upto ₹21,000/- per month or any amount specified by ESIC from time to time) |
| 13 | Bonus (The contributions are payable only for employees receiving salary upto ₹21,000/- per month or any amount specified by competent authority from time to time) (To be paid on reimbursement basis) |
| 14 | Total wages per month |
| 15 | Total wages per year |
| 16 | Total wages for contract (01.04.2026 to 31.03.2028) |
| 17 | I-C. Un-Skilled Workers - 11 Nos. Housekeeping Workers |
| 18 | Total of Basic + VDA for a month (26 X minimum wages per day) |
| 19 | EPF (Subject to maximum ceiling of ₹15000/ salary per month or any amount specified by EPFO from time to time) |
| 20 | ESI (Payable only for employees receiving salary upto ₹21,000/- per month or any amount specified by ESIC from time to time) |
| 21 | Bonus (The contributions are payable only for employees receiving salary upto ₹21,000/- per month or any amount specified by competent authority from time to time) (To be paid on reimbursement basis) |
| 22 | Total wages per month |
| 23 | Total wages per year |
| 24 | Total wages for contract (01.04.2026 to 31.03.2028) |
| 25 | (Unskilled + Semi-Skilled + Skilled) Sub-total |
| 26 | GST 18% on 25 |
| 27 | Total - Part I |
| 28 | II. Service Charges (Service charges should not be less than 3.85%(inclusing of applicable GST) on Sr.No. 25 |
| 29 | Service Charges - Percentage (%) rate to be quoted over Sr.No.25 |
| 30 | Total - Part II |
| 31 | III.A. Two Years Supply of cleaning material, tools, equipment, cleaning disinfectants, other consumables, etc.(Including applicable GST) |
| 32 | Soft Broom |
| 33 | Hard Broom |
| 34 | SASA |
| 35 | Kil Nol ( white phenyl) |
| 36 | Liquid Soap Hand Wash (1can 5 lt.) |
| 37 | Glass Duster white |
| 38 | Ordinary Duster |
| 39 | Garbage Bag(Small) |
| 40 | Garbage Bag(Big)29×39 |
| 41 | Ball Pen |
| 42 | Wet Mop With Rod |
| 43 | Room Freshner |
| 44 | Harpic |
| 45 | Hand Gloves |
| 46 | Pencil Cell(AAA) |
| 47 | Pencil Cell(AA) |
| 48 | Toilet Paper Roll |
| 49 | Glass Cleaner Wiper 10.83 inch |
| 50 | Scrubber Scrub pad 10×7.5 cm |
| 51 | Colin Glass & Surface Cleaner |
| 52 | Scrubber Steel |
| 53 | Black Hit |
| 54 | Red Hit |
| 55 | Bleaching Powder |
| 56 | Gala Double Hockey Toilet Brush |
| 57 | Dust Pan plastic |
| 58 | T Brush Road With Stick |
| 59 | Floor Wiper With Road |
| 60 | Naphthalene Ball 200 mg |
| 61 | Good Night Refill 45ml With Machine |
| 62 | Bucket |
| 63 | Plastic Mug |
| 64 | Vim bar |
| 65 | Air Pocket (Godrej aer power packet) |
| 66 | Plastic Drum (80 litre) |
| 67 | Tissue paper Box Single Packet |
| 68 | Pitambari |
| 69 | Dustbin with Pedestal |
| 70 | III.B. Rental Charge for Deployment of machinery and tools as indicated in Scope of Work (Quote for Two Years of Rent).(Including applicable GST) |
| 71 | Single disc machine(01) |
| 72 | Vaccum Cleaner(02) |
| 73 | Jet spray Machine (01) |
| 74 | Hose water pipe - 30 mt. |
| 75 | Handheld air blowers for deep cleaning of office desks/workstations/other spots |
| 76 | III.C. Façade Cleaning as indicated in Scope of Work (Quote for two years).(Including applicable GST) |
| 77 | Façade cleaning and cleaning of main logo and its adjoining area on terrace as mentioned in the scope of work. The work shall be carried out on quarterly basis. The building as approx 2000 sq.mt glass area. If extra service is done, the same will be done at the same rate. (Including 18% GST) |
| 78 | IV. Tank Cleaning (Quote for two years). (Including Applicable GST) |
| 79 | Under Ground Slump/tank - 01 Nos (9.70 M x 3.80) (2.77 M deep) Total approx. capacity 0.96 lakh ltr |
| 80 | Overhead Tanks (Domestic) - 03 Nos. with inner partition wall (6.25 M x 5.12 M) (2.77 M deep) Total approx. capacity 0.88 lakh ltr |
| 81 | V : Gardening - Pruning + Garden Plants(Quote for two years). (Including Applicable GST) |
| 82 | Consumables, Fertilizers and Equipments etc (as indicated in the scope of work charges on monthly basis): a) Supply of consumbales, fertilizers, and Equipments, etc. As indicated in the scope of work charges on monthly basis. (24 Months) |
| 83 | b) Supply of all seasonal flowering plants ans shrubs with hedges (min. height 0.25mtr) as indicated in the scope of works |
| 84 | c) Supply and laying of Grass and turf along with laying of Sand base with gravels etc complete in all respects as per requirment and scope of work (Area Appox 3800 sqft) |
| 85 | d) Supply and laying of Bamboo (min. height 2 mtr) in the soil with making necessary bedding as per the scope of the work |
| 86 | e) Supply, laying and sowing Medicinal Plants (min. height 1 mtr) in the soil / sand with making necessary bedding as per the scope of work |
| 87 | Tree Trimming and Pruning of Plants as specified in the Scope and Terms and conditions of the Contract: NABARD House - 15 Nos. of Trees |
| 88 | VI : Pest Control Treatment (Quote for two years). (Including Applicable GST) |
| 89 | Pest Control Works - Disinfestation Treatment using baits / chemical spray internal: Carrying out bait treatment in the flats by using non-toxic (harmless to human beings) products. Keeping sufficient nos. of baits in each room which should be effective till next treatment falls due. The treatment shall aim to control house-hold pests like, cockroaches, silver fish, bed bugs, red and black ants, spiders, flies, fleas, mosquitos, similar other crawling/flying insects, etc. and lizards. The treatment includes removal and disposal of old baits etc.: a) 3 BHK Periodicity: Monthly (13 flats x 24) |
| 90 | 4 BHK with study Periodicity: Monthly (7 flats x 24) |
| 91 | Disinfestation / Pest Control in common areas using chemical sprays: Carrying out Pest Control Treatment in all the common areas in the residential complex such as staircase / lobbies / passage / corridors / manholes / inspection chambers / etc. the item of work includes opening of manholes / inspection chambers / gully traps etc. covers and replacing the same in position to restore normalcy after spraying approved chemicals.: a) Entire Building and Compound (Periodicity: Once in a Fortnight) |
| 92 | b) Entire Building and Compound - Rodent Control Treatment for controlling Rats, Mice & Bandicoots [Periodicity: Once in a Fortnight] |
| 93 | c) External Fogging Treatment: For Entire Building and common areas [Periodicity: Once in a Fortnight] |