| 1 | Supply and erection of 36\" (11 Mtrs) Spun pole including supply of materials as required. |
| 2 | Concreting of 36\" (11 Mtrs) Spun Poles by excavation of pole pit (by 2.5’x2.5’x6’) (length x breadth x depth) and base concreting with 40 mm Blue metal for a height of 10 cm from Ground level and pole concretingwith 20mm Blue metal including supply of materials. |
| 3 | Supply and erection of33 KV \"V\" cross arm (GI) with pole clamp(GI) for spun poles and bolts & nuts including supply of materials as required. |
| 4 | Supply and erection of 33 KV Top cleat with bolts & nuts including supply of materials as required. |
| 5 | Supply and erection of 33 KV Tapping channel cross arm (GI) set with bolts & nuts including supply of materials as required. |
| 6 | Supply and erection of GI back clamps for spun poles with bolts & nuts and other materials as required. |
| 7 | Supply and erection of 33 KV Porcelain pin insulator with GI pin. |
| 8 | Supply and erection of 11 KV Porcelain disc insulator including supply of materials as required. |
| 9 | Supply and erection of 33 KV disc metal part including supply of materials as required. |
| 10 | Supply and erection of 33 KV 800 A DC AB Switch with porcelain insulators on 36\"(11 Mtrs.) spun poles and jumpering on both sides with AAA 100 Sq.mm. conductor, bolts & nuts and other materials as required. |
| 11 | Supply and erection of 30’ RCC stud poles including supply of materials. |
| 12 | Supply and erection of HT stay complete set including excavation of stay pit, erection of stay block with rod ,bolts & nuts and other materials as required. |
| 13 | Supply and erection of 33 KV GI Stay clamps with bolts & nuts and other materials as required. |
| 14 | Stringing of 33 KV line with 100 Sq.mm. AAA conductor including supply of conductor as required |
| 15 | Supply and erection of GI channel 100x50mm for DP structure over spun poles, clamps with bolts & nuts and other materials as required. |
| 16 | Supply and erection of GI angle 50x50x6mm for DP structure and cut points over spun poles, clamps with bolts & nuts and other materials as required. |
| 17 | Supply and erection of GI flat 50x6mm for earthing of AB switches and other materials as required. |
| 18 | Supply and erection of CI Earth pipe 2.75x80 mm for AB switchesincluding supply of materials as required. |
| 19 | Supply and erection ofGI earth flat 25x6 mm for earthing switches and other materials as required. |
| 20 | Labour charges for dismantling of damaged spun pole. |
| 21 | Labour charges for dismantling of damaged line. |
| 22 | Labour charges for dismantling of 33KV damaged insulators. |