| 1 | Demolition of cement concrete (unreinforced) in any description and in any position not otherwise specially provided for complete all as specified and directed. |
| 2 | Dismantling brick tiles in roof top laid bedded & pointed in any mortar and removing from site all as specified and directed. |
| 3 | Demolition of mud or existing roof treatment of, any thickness, including plastering and leaping and tiling of any description whether part removal or full or as specified and directed. |
| 4 | Disposal of removed/demolished soil/materials exc 1.50km but n. exc 5km and depositing where directed complete all as specified and directed. |
| 5 | M & Lfor preparation of old roof surfaces by brooming and watering, cleaning all dust particles and providing PCC (1:2:4) type B-0,(using 12.5 mm graded crushed stone aggregate) with water proofing compound as per manufacturer instruction asinpaddding/ levelling course of average thickness not exceeding 25mmcomplete all as specified and as directed. Note : Water proofing compound will be measured and paid separately. |
| 6 | M&L Cutting out cracks to V-section in existing roofs or terracing, cleaning out and filling solidly with a hot mixture of bitumen and clean dry sand 1:1 (by weight) complete all as specified and directed. |
| 7 | M&L for water proofing treatment for roof by applying priming coat of epoxy primer with resin and harder in 1:3 ratio with water dilution as per manufacturer instructions, applying two coats of fiber Reinforced Elastomeric Liquid fiber applied water proofing membrane formulated with select elastomeric and resilient acrylic polymers and reinforcing synthetic fibers liquid applied membrane with consumption of 0.93sqm/ltr (each coat). Second coat should be applied once 1st coat becomes dry completely all as specified and directed. Ponding test of the roof surface will be done for 48 hours before and after the roof treatment process to identify the leakage and seepage from the roof surface completeall as specified and directed.Note:-(a) The work under item 03 shall be carried out by the authorised applicator of Manufacturer by using modern techniques. The contractor shall also furnish warrantly of quality, finish work and effectiveness of waterproofing treatment under this item for a period of not less than 7 years from the date of completion along with manufacturer warrantly of material for the same period. (b) From the taking down, preparation of the surface, Eng-in-Charge shall approv each and every stage before applying finishing coats. |
| 8 | Demolition of brick work or stone/boulder masonary, built in cement mortar including all quoins, arches, pillars etc but excluding ashlar facings, dressed stone work and pre-cast concrete articles complete all as specified and directed. |
| 9 | M&L brick work with sub class \"B\" bricks old size, straight or curved on plan exc 6M mean radius, built in CM1:6 complete all as specified and directed. |
| 10 | M&L for brick work with sub class \"B\" bricks old size, straight or curved on plan exc 6M mean radius, built in CM 1:6 complete all as specified and directed. Note:- Bricks obtained from Item No-09shall be reused after cleaning. |
| 11 | Taking down cement or cement lime plaster of any description on brick or stone walls/ceiling etc,including raking out joints, hacking for key, scrubbing down with water etc complete all as specified and diected. |
| 12 | M&L for 15mm thick External ready mix plaster onbrick or concrete surfaces including providing surface finished even and fair, all as specified and as per manufacturers instruction. |
| 13 | M&L for rendering 10mm thick plaster on concrete surfaces of ceiling complete all as specified and directed. |
| 14 | M&L for applying three coats of white wash on newly plastered surfaces of ceiling including preparation of surfaces complete all as specified and directed. |
| 15 | M&L for preparation of new/old plastered surfaces of concrete surface/plastered surfaceand applying three coats of smart care damp proof ultra of asian paint or similar with roller as per manufacturers instruction and directed. |
| 16 | Supply only liquid water proofing compound complete all as specified and directed. |
| 17 | M&L for preparation of new surfaces of wall and applying 1mm thick water proof wall care putty and over two coats of cement base paint complete all as specified and directed. |
| 18 | S&F mild steel joist channel angle or Tee sections fixed independently with out connecting plates etc of grade Fe-410-W(Gde E-250 quality B) complete all as specified and directed. |
| 19 | S&F 5.0 cm thick sand stone slabs in sun shades, chajjas, shelves, roof slabs etc n.exc. 2m in length punched dressed on face and along exposed edges, self faced on other side and set and pointed in CM 1:4 complete all as specified and directed. |
| 20 | S&F in repair 500 ltrs capacity rotational moulded polyethylene water storage tank double layered, ISI engraved (cylindrical vertical with closed top) hoisted and fixed in position complete all as specified & directed. |
| 21 | S&F in repair 1000 ltrs capacity rotational moulded polyethylene water storage tank double layered, ISI engraved (cylindrical vertical with closed top) hoisted and fixed in position complete all as specified & directed. |
| 22 | S&F 20mm dia ball valve high pressure of PTMT with epoxy coated aluminium rod and high density plastic ball screwed for iron pipe 20 mm dia (minimum weight- 210 gm) complete all as specified and directed. |
| 23 | S&F in 1mm thick Steel sheet duccan suitable screws for 500/1000ltr PVC tank (For Monkey mirace), design and size approved by GE |
| 24 | Taking up or down 15mm bore steel tubing and connection complete all as specified and directed. |
| 25 | Taking up or down 20mm bore steel tubing and connection complete all as specified and directed. |
| 26 | S&F 15mm dia bore GI tubing, medium grade, galvanised with all fittings, fixed to walls, ceiling or laid in floors complete all as specified & as directed. |
| 27 | S&F 20mm dia bore GI tubing, medium grade, galvanised with all fittings, fixed to walls, ceiling or laid in floors complete all as specified & as directed. |
| 28 | Refixing old steel tubing 15mm bore and connections in new or old position (Walls, Ceiling, Floors etc) complete all as specified and directed. |
| 29 | Refixing old steel tubing 20mm bore and connections in new or old position (Walls, Ceiling, Floors etc) complete all as specified and directed. |
| 30 | S&F in repair 15mm dia Gun metal globe or gate valves with iron wheel head screwed both end for iron pipe complete all as specified and directed. |
| 31 | S&F in repair 20mm dia Gun metal globe or gate valves with iron wheel head screwed both end for iron pipe complete all as specified and directed. |
| 32 | S & F in repair 110mm bore PVC (SWR) pipes single socketed in any length with rubber ring joints, fixed to wall complete all as specified and directed. |
| 33 | S & F 110 mm bore PVC (SWR) bends of any radius complete all as specified & directed. |
| 34 | S&F110 mm bore PVC (SWR) single T with access door of any radius complete all as specified & directed. |