| 1 | Supply and planning of hedge shrubbery (Inermi Hedge boundary plantation trees) 1 to 2 feets plants minimum 1 year old including creation of beds by excavating 60cm deep and 60cm wide trenching excavated base to a further depth of 30cm, refilling the excavation earth after breaking of clods and mixing with manure of sludge on the ratio 1:8 (8parts of staked volume of earth after reducing 20% with one part of stacked volume of sludge or manure after reduction by 8%) flooding with water filling with earth if necessary and finally fine dressing, levelling etc including removal of surplus earth if any and declared unservicable earth to a distance not excedding 100m and depositing where directed by spreading and levelling at a level not exceeding 1 metre above the starting point complete all as specified and directed.Note : -(i) Distance between two hedge shall not be more than 15cm.(ii) The contractor\"s quoted rate shall be inclusive of excavation, earthwork, manure, sludge, antitermite treatment, pesticide, supply of good earth from outside MD land if not found suitable from the excavated earth, etc. Nothing extra shall be paid on this account. |
| 2 | Material and labour for digging holes of 60cm dia and 60cm depth in ordinary soil and refilling the same with the excavated earth mixed manure or sludge in the ratio of 2:1 by volume (2 parts if stacked volume of earth after reduction by 20% : 1 part of stacked volume of manure after reduction by 8%) flooding with water filling with earth ifnecessary and finally fine dressing, levelling etc including removal of surplus earth if any and declared unservicable earth to a distance not exceeding 100m and depositing where directed by spreading and levelling at a level not exceeding 1 metre above the starting point including anti termite treatment by digging pits 30 cms deep and 4 cm dia, 6 to 7 holes around the tree using chemical emuslion at the rate of 1.5 ltr per hole in two time or more application to get the trees free from termite infection chemical using Chlorpyriphos 20% EC in the ratio of 1% concentration incluing supplying, stacking and planting of following trees/plant of height 100-110cm in big polybag of size 25cm complete all as specified and directed.(i) The contractor\"s quoted rate shall be inclusive of excavation, earthwork, manure, sludge, antitermite treatment, pesticide, supply of good earth from outside MD land if not found suitable from the excavated earth, etc nothing extra shall be paid on this account.(a) Rose (Different Colour) |
| 3 | (b) Bougainvilla |
| 4 | (c) Palm tree |
| 5 | (d) Ashoka Potala tree |
| 6 | (e) Neem Tree |
| 7 | (f) Tecoma tree |
| 8 | (g) Bottle Brush |
| 9 | (h) Madhu Malti |
| 10 | (j) Cassia Bifora |
| 11 | (k) Guava Tree |
| 12 | (l) Rat ki rani |
| 13 | (m) Bakul Plant |
| 14 | (n) Bottle Plam |
| 15 | (o) Pulmeria |
| 16 | (p) Araucaria cookit of height 3-4 feet |
| 17 | (q) Foxtail Palm |
| 18 | (r) Red palm |
| 19 | (s) Areca palm |
| 20 | Material and labour for laying of lawn selection 1 grass in rows 5cm apart in both direction including digging oflawn are upto 30cm depth, breaking of clods, removal of stone etc. mixing of vermi compost @ 3kg/Sqm and insecticides, mixing in all, levelling, watering and cutting and dressing and maintenance of the lawn for 60 days or more till the grass forms a thick lawn, free from weeds and fit for mowing complete all as specified and directed.Note: (i) Distance between two hedge shall not be more than 15cm.(ii) The contractor\"s quoted rate shall be inclusive of excavation, earthwork, manure, sludge, antitermite treatment, pesticide, supply of good earth from outside MD land if not found suitable from the excavated earth, etc nothing shall be paid on this account. |
| 21 | Surface dressing n exc 15cm deep in any type of soil, complete all as spd and directed. |
| 22 | Excavation in trenches n.exc 1.5m deep and n.exc 1.5m wide in manholes,Drains & Post hole pipe, cables etc. getting out in soft/ loose soil complete all as spd and directed |
| 23 | Excavating over areas, n exc 1.5 m deep and getting out complete all as spd and directed. |
| 24 | Returningfilling in soft/loose soil including spreading, levelling and well ramming in layers n.exc 25cm thick in layer etc complete all as spd and directed |
| 25 | Removing excavated material (soil)n exc. 50m and depositing where directed at a level n exc. 1.5 m above the starting point complete all as spd and directed |
| 26 | Forming embankment including raising (or lowering) earth, spreading in layers n exc. 30 cm thick; watering, ramming/rolling and finishing to required size, shape,etc., n exc. 1.5 m high from base (R) complete all as spd and directed |
| 27 | M&L for PCC block masonry with soild blocks Type C1 1 :3:6 (20mm gr agg) exc 10 cm in width and setting in CM 1 :6 complete all as spd and directed |
| 28 | M&L for Rendering 12mm thick on fair faces of brick work or concrete surfaces in CM 1:4 and making the surface even and fair without using extra cement complete all as spd and directed |
| 29 | Material and labour in repairfor Granite(of any type) 18 to 20 mm thick work (table rubbed and polished) in steps, jambs, pillars, window- cills, cooking platforms and like in cement mortar (1:4) including pointing in white cement (1:2) using marble dust with admixture of pigment to match withshade including noising and rounding edges of stone slab andcomplete all as spd and directed |
| 30 | M&L for 75mm thick in plain cement concrete (1:3:6) type C2 (using 40mm graded stone aggregate) in plinth protections/ path including necessary form work complete all as spd and directed |
| 31 | S&F 20 mm bore steel water tubing, ‘medium grade’ galvanised, with all fittings and fixed complete to walls and ceilings or laid in floors complete all as specified and directed. |
| 32 | M&L for plain cement concrete 1:2:4 (using 40mm graded stone agrregate) type B2 in hardstanding, mass filling surface channels and drains including rounding and chamfering to edges complete all as spd and directed |
| 33 | M&L for plain cement concrete 1:2:4 (using 20mm graded stone agrregate) type B1 as in coping concrete including necessary formwork complete all as spd and directed |
| 34 | M&L for coloured industrial exterior tiles of selected premium quality area n.exc 0.09 sqm fixed with tiles adhesive jointed and pointed in neat cement slurry in floors, laid over and including 15mm thick screed bed in CM 1:6 complete all as spd and directed |
| 35 | M&L for providing and laying in repairs precast kerb stone of M-25 grade cement concrete in position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement: 3 coarse sand), including making joints with or without grooves (thickness of joints except at sharp curve shall not to more than 5 mm), including making drainage opening wherever required complete all as spd and directed |
| 36 | M&L for plain Cement concrete 1:3:6 (using 40mm graded stone agrregate) type C2 in foundations, filling and mass concrete complete all as spd and directed. |
| 37 | Supply of 1 inch branded rubber hose pipe of good quality for watering in garden complete all as spd and directed. |
| 38 | S&F heavy duty garden patio bench of size (CI Fiber bench 3 seater of size 143.51x58.42x78.74 Cm black & brown) complete all as shown in sketch and with following specifications :- Bench side frame Cast iron standSeating material4mmthick & strong FRPshade and colour as approved by Engr-in- Charge. |
| 39 | S&F G.I. pipes of 20 mm dia complete with G.I. fittings laid in trenches complete all as specified and as directed.Note : Excavation and earthwork will be measurred and paid for seperately. |
| 40 | S&F Gun metal gate valve of 20 mm dia with C.I. wheel of approved quality (screwed end) ISI Marked complete all as specified and as directed. |
| 41 | M&L for complete maint of planted trees and shrubs (Hedges) items covered under item 01 to 03 above including hoeing, wedding pruning, removal of garden rubbish, spraying manure vermin-compost, neem cake & micro nutrients etc as per standardprocedure and as directed by Engr-in-Charge/ GE, protecting the trees and shrubs, keeping good health of plants so as to keep the plant live in entire period of 12 months and replacing the dead trees and shrubs with the size as per time grown new live trees and shrubs (within 48 hrs) etc and make all necessary arrangement to keep the plant live and healthy for entire period of 12 months starting from completion date of work.Note:-(a) Manpower to be deployed 01 Nos of experienced gardener / Maliin a shift of 08 hrs per day including necessary tools and plants (T&P) per day (Except sunday & holiday) for the period of 12 Months starting from completion date of work. (b) Attendance register shall be maint by contractor and put up to Engr-in-Charge & GE for their inspection. |