|
| 1 | SH-I :- SITC of Gas based Fire Suppression System at Coimbatore Airport SiteDesign, Supply, Installation, Testing & Commissioning of Clean Agent Gas Flooding System for areas specified in the Technical Specifications, complete using Gas Agent as per NFPA 2001.Supply of Cylinder UL listed /FM/VDS/LPCB/CCOE(PESO) Approved, complete with UL/VDS approved valve assembly and arrangement for supervisory switch connection for monitoring cylinder pressure. A pressure gauge with a safety burst disc, electronic control head / Solenoid, pressure operated control, head, flexible hose, strap, NRV and safety cap.Gas - Quantity would be as per the design volume and as per the necessary codal specifications UL/VDS Certifications. Clean agent shall be of FK-5-1-12 Gas flooding System with all cylinders, gas, manifold, Master Cylinder Accessories for above including Electrical Control Head, Discharge Hose and Gas discharge Warning sign, Nozzles including providing, installing, testing and commissioning of Gas Release Panel complete with timer, battery back up, Gas Release/Gas Abort Switch etc complete system as required. item also includes Fire alarm system and supply & laying of Fire survival cable, detector & panels.Note: The Individual system will be provided in specified areas only.The contractor will design the system as per NFPA 2001. The contractor will get the design approved by AAI before execution. Statutory Approvals, if required, will be taken from concerned authorities. The piping design and pressure calculations using manufacturer design software for a given dimension of room duly approved by manufacturer/ distributors shall be submitted prior to starting of the works.(The cost towards refilling of clean agent and replacement of spare parts, if any, towards the real time acceptance testing shall be borne by the contractor and is part of SITC cost. Refer clause 8 of TS) |
| 2 | Supply, Installation, Testing and Commissioning of 40/34 litre capacity, seamless, high pressure, cylinder assembly, conforming to IS - 7285 (PT-2): 2004 or UL - 2166 etc. complete as required including bracket assembly, pressure gauge etc. complete as required. |
| 3 | Supply, Installation, Testing and Commissioning of 80//75 litre capacity, seamless, high pressure, cylinder assembly, conforming to IS - 7285 (PT-2): 2004 or UL - 2166 etc. complete as required including bracket assembly, pressure gauge etc. complete as required. |
| 4 | Supply, Installation, Testing and Commissioning of 140 litre capacity, seamless, high pressure, cylinder assembly, conforming to IS - 7285 (PT-2): 2004 or UL - 2166 etc. complete as required including bracket assembly, pressure gauge etc. complete as required. |
| 5 | Supply, Installation, Testing and Commissioning of 180 litre capacity, seamless, high pressure, cylinder assembly, conforming to IS - 7285 (PT-2): 2004 or UL - 2166 etc. complete as required including bracket assembly, pressure gauge etc. complete as required. |
| 6 | Supply, Installation, Testing and Commissioning of UL/VDS listed Primary Cylinder Accessories such as Electric Cum Manual Actuator, OEM recommended discharge flexible hose and Warning Sign for cylinders upto and including 140 Litre capacity. |
| 7 | Supply, Installation, Testing and Commissioning of UL/VDS listed Primary Cylinder Accessories such as Electric Cum Manual Actuator, OEM recommended discharge flexible hose and Warning Sign for cylinders of 180 Litre capacity. |
| 8 | Supply, Installation, Testing and Commissioning of UL/VDS listed Tertiary Cylinder Accessories such as Pressure operated control head, Flexible Actuation Hose, Master Cylinder Adaptor kit, Elbow connectors for 180 Litre capacity cylinder complete as required. |
| 9 | Supply, Installation, Testing and Commissioning of UL/VDS listed Manifold with check valve of 2\" size for 180 Litre capacity cylinder complete as required. |
| 10 | Supply and filling of clean, odourless, colour less, UL listed and suitable for fire class - A, B & C fire suppression agent (FK-5-1-12 Clean Agent) etc. complete as required. |
| 11 | Supplying and fixing of UL listed suitable size (as per hydraulic flow calculation) Discharge nozzle with orifices etc. complete as required. |
| 12 | Supply and fixing of Cylinder Strap for 34 Lt. Cylinder |
| 13 | Supply and fixing of Cylinder Strap for 80 Lt. Cylinder |
| 14 | Supply and fixing ofCylinder Strap for 140 Lt. Cylinder |
| 15 | Supply and fixing ofCylinder Strap for 180 Lt. Cylinder |
| 16 | Supply and fixing of UL/VDS listed Manifold Discharge Pressure Switch |
| 17 | Supplying, installation, testing and commissioning of UL/VDS listed Low pressure supervisory switch for the cylinder assembly etc. complete as required. |
| 18 | Supply, Installation, Testing & Commissioning of PULL TYPE Manual gas release station having manual break glass push button type call points with auxiliary contacts, hammer etc for FK 5-1-12 System complete as per tender specification, as per site requirement & as per direction of Engineer-In-charge. (UL Listed) |
| 19 | Supply, Installation, Testing & Commissioning of PULL TYPE Manual gas abort station having manual break glass push button type call points with auxiliary contacts, hammer gland etc for FK 5-1-12 System complete as per tender specification, as per site requirement & as per direction of Engineer-In-charge.(UL Listed) |
| 20 | Supply and Installation of 2 Zone microprocessor based Fire cum gas release panel having (TCP/IP), GSM for remote communication SMS/Realtime monitoring, Modbus connectivity including hardware/Software mechanism to abort/Release Remotely via mobile OR fire control Room Through LAN. Software shall maintain event log of activities like fire /fault at remote Location.( Bidder to enclose panel datasheet along with the technical Bid) |
| 21 | Supplying, installation , testing and commissioning of conventional multi criteria detector {Smoke + heat}, conforming to UL/LPCB, with all accessories viz : indicator, base, base box etc. to be installed on ceiling / false ceiling etc. complete as per site requirement & as per direction of Engineer-In-charge. Cost of plug in common base shall deemed to be included in cost of detectors) |
| 22 | Supply, installation, testing and commissioning of UL / EN listed (Latest Version) Response Indicators for getting fire indications of detectors i/c mounting boxes installed above false ceiling area interconnecting to loop cable etc. as per specification complete as required. |
| 23 | Supply, Installation, Testing & Commissioning of Manual call point station suitable for the above system having manual break glass with auxiliary contacts, hammer gland etc for System complete as per tender specification, as per site requirement confirming to UL/LPCB/EN54. |
| 24 | Supplying, installation , testing and commissioning of conventional strobe cum hooter , conforming to UL/LPCB, with all accessories , base box etc. to be installed on ceiling / false ceiling etc. complete as per site requirement & as per direction of Engineer-In-Charge ( UL Listed) |
| 25 | Supply and laying of 2 core, 1.5 sq.mm. Fire Survival cable, armoured copper conductor of 600/1000V grade, insulated with specially formulated PVC, coated with special fire resistance materials and overall sheathed with special PVC, with special properties as Zero Halogen Low Smoke insulation, cable laying through conduits/ surface/ recess/ above false ceiling/ concealed space/ wall concealed, etc. for control cabling for Fire detection & alarm devices and interconnecting etc. |
| 26 | Supply & Installation of ASTM A 106 Grade B Seamless Manifold as per ASTM A 106 Gr. B, schedule 40 with necessary fittings. |
| 27 | Supply Installation Testing & Commissioning of seamless pipes SCH40 and special threaded fittings with necessary angle / Hitech supports with anchor fasteners including painting of 2 coats of primer with one coat of signal red paint & Nitrogen pressure testing Of installed Piping. Supply, Installation, Testing & Commissioning of GSS. |
| 28 | SH-II :- SITC of Gas based Fire Suppression System at Ooty RCAG Site at DoddabettaDesign, Supply, Installation, Testing & Commissioning of Clean Agent Gas Flooding System for areas specified in the Technical Specifications, complete using Gas Agent as per NFPA 2001.Supply of Cylinder UL listed /FM/VDS/LPCB/CCOE(PESO) Approved, complete with UL/VDS approved valve assembly and arrangement for supervisory switch connection for monitoring cylinder pressure. A pressure gauge with a safety burst disc, electronic control head / Solenoid, pressure operated control, head, flexible hose, strap, NRV and safety cap.Gas - Quantity would be as per the design volume and as per the necessary codal specifications UL Certifications. Clean agent shall be of FK-5-1-12 Gas flooding System with all cylinders, gas, manifold, Master Cylinder Accessories for above including Electrical Control Head, Discharge Hose and Gas discharge Warning sign, Nozzles including providing, installing, testing and commissioning of Gas Release Panel complete with timer, battery back up, Gas Release/Gas Abort Switch etc complete system as required. item also includes Fire alarm system and supply & laying of Fire survival cable, detector & panels.Note: The Individual system will be provided in specified areas only.The contractor will design the system as per NFPA 2001. The contractor will get the design approved by AAI before execution. Statutory Approvals, if required, will be taken from concerned authorities. The piping design and pressure calculations using manufacturer design software for a given dimension of room duly approved by manufacturer/ distributors shall be submitted prior to starting of the works. |
| 29 | Supply, Installation, Testing and Commissioning of 80 litre capacity, seamless, high pressure, cylinder assembly, conforming to IS - 7285 (PT-2): 2004 or UL - 2166 etc. complete as required including bracket assembly, pressure gauge etc. complete as required. |
| 30 | Supply, Installation, Testing and Commissioning of UL/VDS listed Primary Cylinder Accessories such as Electric Cum Manual Actuator, OEM recommended discharge flexible hose and Warning Sign for cylinders of 80 Litre capacity. |
| 31 | Supply and filling of clean, odourless, colour less, UL listed and suitable for fire class - A, B & C fire suppression agent (FK-5-1-12 Clean Agent) etc. complete as required. |
| 32 | Supplying and fixing of UL/VDS listed suitable size (as per hydraulic flow calculation) Discharge nozzle with orifices etc. complete as required. |
| 33 | Supply and fixing of Cylinder Strap for 80 Lt. Cylinder |
| 34 | Supplying, installation, testing and commissioning of UL listed Low pressure supervisory switch for the cylinder assembly etc. complete as required. |
| 35 | Supply, Installation, Testing & Commissioning of PULL TYPE Manual gas release station having manual break glass push button type call points with auxiliary contacts, hammer etc for FK 5-1-12 System complete as per tender specification, as per site requirement & as per direction of Engineer-In-charge. (UL Listed) |
| 36 | Supply, Installation, Testing & Commissioning of PULL TYPE Manual gas abort station having manual break glass push button type call points with auxiliary contacts, hammer gland etc for FK 5-1-12 System complete as per tender specification, as per site requirement & as per direction of Engineer-In-charge.(UL Listed) |
| 37 | Supply and Installation of 2 Zone minimum, microprocessor based Fire cum gas release panel having (TCP/IP), GSM for remote communication SMS/Realtime monitoring, Modbus connectivity including hardware/Software mechanism to abort/Release Remotely via mobile OR fire control Room Through LAN. Software shall maintain event log of activities like fire /fault at remote Location.(Bidder to enclose panel datasheet along with the technical Bid) |
| 38 | Supplying, installation, testing and commissioning of conventional multi criteria detector {Smoke + heat }, conforming to UL/LPCB, with all accessories viz : indicator, base, base box etc. to be installed on ceiling / false ceiling etc. complete as per site requirement & as per direction of Engineer-In-charge. Cost of plug in common base shall deemed to be included in cost of detectors) |
| 39 | Supply, installation, testing and commissioning of UL / EN listed (Latest Version) Response Indicators for getting fire indications of detectors i/c mounting boxes installed above false ceiling area interconnecting to loop cable etc. as per specification complete as required. |
| 40 | Supply, Installation, Testing & Commissioning of Manual call point station suitable for the above system having manual break glass with auxiliary contacts, hammer gland etc for System complete as per tender specification, as per site requirement confirming to UL/LPCB/EN54. |
| 41 | Supplying, installation , testing and commissioning of conventional strobe cum hooter , conforming to UL/LPCB, with all accessories , base box etc. to be installed on ceiling / false ceiling etc. complete as per site requirement & as per direction of Engineer-In-Charge ( UL Listed) |
| 42 | Supply and laying of 2 core, 1.5 sq.mm. Fire Survival cable, armoured copper conductor of 600/1000V grade, insulated with specially formulated PVC, coated with special fire resistance materials and overall sheathed with special PVC, with special properties as Zero Halogen Low Smoke insulation, cable laying through conduits/ surface/ recess/ above false ceiling/ concealed space/ wall concealed, etc. for control cabling for Fire detection & alarm devices and interconnecting etc. |
| 43 | Supply & Installation of ASTM A 106 Grade B Seamless Manifold as per ASTM A 106 Gr. B, schedule 40 with necessary fittings. |
| 44 | Supply Installation Testing & Commissioning of seamless pipes SCH40 and special threaded fittings with necessary angle / Hitech supports with anchor fasteners including painting of 2 coats of primer with one coat of signal red paint & Nitrogen pressure testing Of installed Piping. Supply, Installation, Testing & Commissioning of GSS. |
| 45 | SH-III :- AMC of Gas based Fire Suppression System at Coimbatore International AirportAnnual maintenance contract of gas based suppression system by providing quarterly inspection, checking, repair, maintenance and replacement of unserviceable components, i/c cleaning of detection systems, verify control panel functionality, check cylinder pressures, and perform a dry system test and all other associated maintenance job as per maintenance schedule and recommendation of OEM to keep the system under serviceable condition including attending any numbers of breakdown as and when required. |
| 46 | First Year after Completion of 01 (One) year DLP |
| 47 | Second Year after DLP |
| 48 | Third Year after DLP |
| 49 | Fourth Year after DLP |
| 50 | Fifth Year after DLP |
| 51 | SH-IV :- AMC of Gas based Fire Suppression System at Ooty RCAG Site at DoddabettaAnnual maintenance contract of gas based suppression system by providing quarterly inspection, checking, repair, maintenance and replacement of unserviceable components, i/c cleaning of detection systems, verify control panel functionality, check cylinder pressures, and perform a dry system test and all other associated maintenance job as per maintenance schedule and recommendation of OEM to keep the system under serviceable condition including attending any numbers of breakdown as and when required. |
| 52 | First Year after Completion of 01 (One) year DLP |
| 53 | Second Year after DLP |
| 54 | Third Year after DLP |
| 55 | Fourth Year after DLP |
| 56 | Fifth Year after DLP |
| 57 | Supply and filling of clean, odourless, colour less, UL listed and suitable for fire class - A, B & C fire suppression agent (FK-5-1-12 Clean Agent) etc. complete as required as per Engineer -in Charge instructions during the AMC period. |