|
| 1 | Supply of Decentralized material as per UPCL Norms. |
| 2 | MS NUT & BOLT OFF SIZE |
| 3 | F Clamp |
| 4 | PP & CLAMP WITH N&B ST POLE SP-55 |
| 5 | Stay Clamp for SP-55 With Nut& Bolt |
| 6 | PG CLAMP ALU ALLOY DOG TO DOG |
| 7 | PP & CLAMP WITH N&B PCCPOLE 8.5MTR |
| 8 | Stay Clamp for Pcc Pole |
| 9 | HT Stay Insulator |
| 10 | Earth Clamp off Size |
| 11 | MS CLAMP 65X6 MM WITH N&B |
| 12 | Following work as per UPCL norms & site requirement. |
| 13 | ERECTION OF EARTHING ROD |
| 14 | FABRICATION OF STEEL |
| 15 | EXCAVATION OF PIT FOR STAY SET |
| 16 | ERECTION OF 11 KV STAY SET |
| 17 | GROUTING OF STAY SET |
| 18 | EXCAVATION OF PIT FOR POLE |
| 19 | ERECTION OF SINGLE PCC POLE |
| 20 | ERECTION OF SINGLE SP-55POLE |
| 21 | GROUTING OF POLE |
| 22 | MUFFING OF POLE |
| 23 | DISMANTLING OF 11 KV LINE(WEASEL |
| 24 | ERECTION OF BRACKET IN 11KV LINE |
| 25 | LAYING OF RABBIT CONDUCTOR IN HT LINE |
| 26 | LOPPING & CHOPPINGOF TREE BRANCHES |
| 27 | T-OFF CONNECTION COMPLETE 11 KV LINE |
| 28 | CARTAGE PCC POLE, 51-70 KM |
| 29 | CARTAGE SP-55 POLE, 51-70 KM |
| 30 | CARTAGE OF PETTY MATERIAL,51-70 KM |
| 31 | HEADLOAD CARTAGE PCC POLE(0-1 KM |
| 32 | HEADLOAD CARTAGE SP-55 POLE(0-1 KM) |
| 33 | STRAIGHTENING OF TILTED PCC POLES |
| 34 | TIGHTENING OF STAY SET |
| 35 | RESAGGING OF 11 KV LINE |
| 36 | Laying Earth wire for Earth on 11KV Line |
| 37 | Fixing of MS Clamp |
| 38 | PROVIDING FRESH JUMPERS 11KV/LT LINE |
| 39 | JUMPERING OF D/P TPMO, FUSE SET AND T/F |
| 40 | FIXING ACCESSORIES ON SINGLE POLE SP-55 |
| 41 | Back Carriage of Scrap Material Please Enable Macros to View BoQ information |