|
| 1 | Ward-01 me Kasbarajpur me mandir (Dev Isthan) ka nirman karya (As per Estimate) |
| 2 | Earth work in foundation or embankment in ordinary soil including earth from 5 km to the site. Chap-04 SR No.251 |
| 3 | Earth work in filling or embankment in ordinary soil including earth from 5 km to the site. Chap-04 SR No |
| 4 | Cement concrete with 4 cm gauge brick ballast with fine sand of 1.25 FM and cement in 1:2:6:1 stone including labour, material, T&P etc. complete. (SR No. 279) |
| 5 | M-150 brick work in 1:4 cement and coarse sand mortar including all cost of materials, labour and T&P etc. required for proper completion of work. (SR No. 305)BOUNDARY WALLKIRTAN HALL + PUJARI ROOMBURJTIN SHEDDEDUCT DOOR & WINDOW |
| 6 | 12 mm thick plaster in 1:4 cement coarse sand mortar over brick work including all cost of materials, labour and T&P etc. required for proper completion of work. (SR No. 584)KIRTAN HALL + PUJARI ROOMBURJ |
| 7 | Providing wall putty on new surface with approved quality material of Berger / J.K / Birla or similar make, 2 coats. As per S.I. No. Ch-15 A.11Same as itemdKIRTAN HALL + PUJARI ROOM |
| 8 | Finishing of wall with superior quality waterproof cement paint (Snowcem) of approved make and quality on new work with three coats of given shade, including all material, labour, T&P required for proper completion of work. S.I. No. 660 + 661Same as item no. 5 |
| 9 | Applying primer coat over new wood work and on plaster surface with two coat paint including preparing the surface by thorough cleaning of oil, grease, dirt and other foreign matter, scouring with wire brushes, steel/wood scrapers, sandpapering and knotting. Includes supply of all materials, labour, and T&P etc. required for proper completion of the work. Ch. 15 No.1(a)+2DOORWINDOWVENTILATOR |
| 10 | Concrete with 4 cm gauge stone ballast with fine sand of 2.25 FM and cement in 6:3:1 in foundation including supply of labour, material, T&P etc. complete. (SR No.279A) |
| 11 | Providing & fixing of interlocking CC tiles, 80mm thick, M-30 grade over 20 to 40 mm sand layer and joints filled by dry fine sand including all cost of labour, T&P etc. complete. |
| 12 | RCC work 1:1.5:3 with cement, approved coarse sand & 20 mm gauge stone grit etc. including centering & shuttering etc. complete. SI No. 283COLUMNSLABBURJTIN SHED |
| 13 | Supply & fixing of flush door, commercial quality conforming to IS 2202 Part (1)1983 including fixing of wooden cleats and stoppers, adjustment of bolts, handles, spring fittings with necessary screws to be supplied. 40 mmDOORWINDOW |
| 14 | Providing and laying vitrified floor tiles (Bell / Kajariya / Somani) 600x600 mm in flooring and skirting with 1:3 approved cement and coarse sand mortar, finished with slurry jointing and polished. Includes supply of all material, labour, T&P etc. complete.HALL + PUJARI ROOMDADO |
| 15 | Mild steel or iron work in plain work such as RCC or RB work including bending for proper shape and including supply of steel and its wastage & authorised overlapping etc. shall be measured. (SI No. 504) |
| 16 | Mild steel in small size and section in fabrication of door, window, & shutter including bending for proper completion of work. (SR No. 502) |
| 17 | Supply and fixing of 7 meter GI octagonal pole of approved make, top dia 70 mm, bottom dia 130 mm, base plate 12 mm, having 3 mm thickness. Single arm bracket on RCC foundation, bolts, excavation and filling, and required T&P complete in all |
| 18 | Construction of information pillar in brick with black granite stone (3 x 2.5) Please Enable Macros to View BoQ information |