| 1 | Demolition of Cement concrete Roofs, floors (other than ground floors), beams, staircases, landing, chajjas and similar suspended work . |
| 2 | Demolition of Concrete in ground floors and pavings n exc 15 cm thickness (below or above ground level) . |
| 3 | M&L Rendering 15mm thick 1:3 cement plaster finish even and smooth w/o using extra cement with cement slurry @3kg per sqm |
| 4 | Cement concrete tvjpe B2 1:2:4 (40mm Graded aggregate) in foundations, filling and mass concrete |
| 5 | Liquid water proofing compound |
| 6 | Framed work as in doors or gates of angle or other section with gusset plates, rails, braces, etc., complete, drilled for fixing of steel sheeting or other covering. Doors, etc. to be prepared for hanging or sliding with and including either hooks and hinges or steel hanging door fittings (exclusive of steel sheeting or other covering, running rails and guides) and hanging; also fastening and fixing complete |
| 7 | S&FExpanded metal, cut to length, bent to shape required and tying with and including annealed mild steel wire not less than 0.9mm dia or fixing with galvanised steel staples supplied and fixed complete to wood or steel members. |
| 8 | M&L Reinforced cement concrete (nominal mix) in TypeB0 1:2:4 Type B1 1:2:4 (20mm graded aggregate)Slabs supported on walls, beams and columns in floors, roofs, landings, balconies, canopies, deck slabs and in shelves and the like . |
| 9 | Plain colour PVC sheet fixed or laid on to flush doors by using rubber based adhesive, supplying & fixing at site as per specification 2mm thick. |
| 10 | S&F TMT Mild steel bars 10mm dia and over, cut to length, bent to shape required, including cranking, bending spirally for hooping for columns, hooking ends and binding with and including mild steel wire (annealed) not less than 0.9mm dia or securing with clips |
| 11 | M&L Rendering 15mm thick 1:4 cement plaster finish even and smooth w/o using extra cement with cement slurry @3kg per sqm including taking down old plaster. |
| 12 | M&L 3mm thick wall care putty on wall. |
| 13 | M&L Preparing of surfaces and applying two coats of oil bound distemper (Wall/ceiling). |
| 14 | M&L Preparation of old wooden surfaces and apply two coats of syntheticenamelpaint. |
| 15 | M&L Preparation of old steel surfaces and apply two coats of syntheticenamelpaint |
| 16 | Supply, and fixing 30 mm thick factory made Polyvinyl Chloride (PVC) door shutter made of styles and rails of a uPVC hollow section of size 60x30 mm and wall thickness 2 mm (± 0.2 mm), with inbuilt decorative moulding edging on one side. The styles and rails mitred and jointed at the corners by means of M.S. galvanised/ plastic brackets of size 75x220 mm having wall thickness 1.0 mm and stainless steel screws. The styles of the shutter reinforced by inserting galvanised M.S. tube of size 25x20 mm and 1 mm (± 0.1 mm) wall thickenss. The lock rail made up of \"H\" section, a uPVC hollow section of size 100x30 mm and 2 mm ( + 0.2 mm) wall thickness fixed to the shutter styles by means of plastic/ galvanised M.S. \"U\" cleats. The shutter frame filled with a uPVC multichambered single panel of size not less than 620 mm, having over all thickness of 20 mm and 1 mm (± 0.1 mm) wall thickness. The panels filled vertically and tie bar at two places by insering horizontally 6 mm galvanised M.S. rod and fastened with nuts and washers, complete as specified by the manufacturer and as per directions of Engineerin-charge. Complete all fittings |
| 17 | Supply and fixing Fiber Glass Reinforced plastic (FRP) Door Frames of cross section 90 mm x 45 mm having single rebate of 32 mm x 15 mm to receive shutter of 30 mm thickness. The laminte shall be moulded with fire resistant grade unsaturated polyester resin and chopped mat. Door frame laminate shall be 2mm thick and shall be filled with suitable wooden block in all the three legs. The frame shall be covered with fiber glass from all sides. M.S. stay shall be provided at the bottom to steady the frame., complete as specified by the manufacturer and as per directions of Engineer-in-charge |
| 18 | S&F Flush shutters,30mm thick solid core construction, with block board core and plywood face panels, commercial type on both sides Complete all fittings |
| 19 | S&FGalvanised mild steel wire cloth, 0.63mm nominal dia of wire and average width of aperture 1.40mm and fixed with tinned tacks, or galvanised wire staples. |
| 20 | S&F Sheet glass, ordinary quality and glazing with oil putty in square n exc 0.5 sq. m in each pane 3mm thick. |
| 21 | Welding in repairs n. exc 2.5cm in lengthN.exc. 6mm . |
| 22 | Butt hinges, 100mm medium weight, cold rolled mild steel, and fixed. |
| 23 | PVC (SWR) pipes single socketed in any length with rubber ring joints fixed to walls 110mm |
| 24 | PVC (SWR) bends any radius 110mm. |
| 25 | Taking up or down steel tubing and connections, including cleaning for refixing or removal to storeand refixing old steel tubing and connections in new or old position (Walls, ceiling, floors, etc.)15mm. |
| 26 | Taking up or down steel tubing and connections, including cleaning for refixing or removal to storeand refixing old steel tubing and connections in new or old position (Walls, ceiling, floors, etc.)20mm. |
| 27 | S&FTubes, \"mediumgrad\", galvanised, with all fitting; laid in trenches 15mm. |
| 28 | S&FTubes, \"mediumgrad\", galvanised, with all fitting; laid in trenches 20mm. |
| 29 | Hardcore (Brocken brick)of gauge n exc. 63 mm, deposited, spread and levelled in layers n exc. 15 cm thick, watered and rammed to a true surface. |
| 30 | Rough excavation not exceeding 1.5 m deep and getting out. |
| 31 | M&L Preparing of surfaces and applying two coats of cement paint. |
| 32 | M&L Glazed ceramic tiles in vertical surface 300x 200x 7 mm thick set cement to match. |
| 33 | Virified Ceramic tiles 10 mm thick (square/ rectangular) polished, area of each tiles not exceeding 0.36 sqm, in floors etc. set and jointed in neat cement slurry and pointed in white or coloured cement to match . |
| 34 | Roof water proofingtreatment in 3 layers at roof,Make:- Nerolac, Asian |
| 35 | Removal of debris up to 5 km. |