|
| 1 | Taking out sample of water supplied by BWSSB from source of receiving station at Banaswadi Garrison and carry out water analysis test for Chemical & biological properties and obtaining test report from any Govt apporoved laboratory. |
| 2 | Taking out sample of water supplied by BWSSB from from source of receiving station at New TB-III in the AOR of MEG and Centre and carry out water analysis test for Chemical & biological properties and obtaining test report from any Govt apporoved laboratory. |
| 3 | Taking out sample of water supplied by BWSSB from at Assaye Parade P/h in the AOR of MEG and Centre and carry out water analysis test for Chemical & biological properties and obtaining test report from any Govt apporoved laboratory. |
| 4 | Taking out sample of water supplied by BWSSB from at Ulsoor Rock P/h in the AOR of MEG and Centre and carry out water analysis test for Chemical & biological properties and obtaining test report from any Govt apporoved laboratory. |
| 5 | Taking out sample of water supplied by BWSSB from at Assaye line P/h in the AOR of MEG and Centre and carry out water analysis test for Chemical & biological properties and obtaining test report from any Govt apporoved laboratory. |
| 6 | Taking out sample of water supplied by BWSSB from at 32 Key Persons Qtrs P/hin the AOR of MEG and Centre and carry out water analysis test for Chemical & biological properties and obtaining test report from any Govt apporoved laboratory. |
| 7 | Taking out sample of water supplied by BWSSB from at 106 Inf Bn P/h and carry out water analysis test for Chemical & biological properties and obtaining test report from any Govt apporoved laboratory. |
| 8 | Taking out sample of Treated water supplied from Sewage Treatement Plantfrom source of STP 100 KLD at TB-I and carry out water analysis test for Chemical & biological properties and obtaining test report from any Govt apporoved laboratory. |
| 9 | Taking out sample of Treated water supplied from Sewage Treatement Plantfrom source of STP 150 KLD at old TB-III and carry out water analysis test for Chemical & biological properties and obtaining test report from any Govt apporoved laboratory. |
| 10 | Taking out sample of water supplied by BWSSB from at ML Pumphouse and carry out water analysis test for Chemical & biological properties and obtaining test report from any Govt apporoved laboratory. |
| 11 | Taking out sample of water supplied by BWSSB from at Vasanth Enclave P/h and carry out water analysis test for Chemical & biological properties and obtaining test report from any Govt apporoved laboratory. |
| 12 | Taking down chlorine Dozing pump 1/2 HP 250 Volt, 50 Hz and transporting frompump house to contractor\"s work shop or at site, dismantling for carrying out necessary repairs / renewal of parts pump and reassembling complete chlorine pump sets & installation ,testing etcthe same after necessary repair to site complete all as directed.Note:- (i) New spares/parts shall be measured & paid separately under appropriate items listed here-in-after. (ii) Quoted rate shall be deemed included of transporting, repair, overhauling and labour component for replacement of spares complete. (iii) Old Unsv items retrieved from this job shall be measured under schedule of credit. |
| 13 | Supplytubing suction / delivery pipe 3/8 \" dia nylon pvc 03 mm thickfor metering pump complete all as specified &directed. |
| 14 | Supply chlorine testing kit stand type all as specified and directed by the Engineer-in-Charge. |
| 15 | Supplyconnecting nut 3/8\" with adapter for dosing pump complete all as specified. |
| 16 | Supplyrotor assembly with bearing brackets and tolerance rings complete all as specified |
| 17 | Supplyroller assembly complete all as specified. |
| 18 | Supply Pump tube (roller type) complete all as specified and directed |
| 19 | Supply injection check valve 3/8\" complete all as specified. |
| 20 | Supplyweighted suction line strainer 3/8\" complete all as specified. |
| 21 | Taking out sample of water supplied by BWSSB from source of receiving station at PARA SF P/h and carry out water analysis test for Chemical & biological properties and obtaining test report from any Govt apporoved laboratory. |
| 22 | Taking out sample of Treated water supplied from Sewage Treatement Plantfrom source of STP 300 KLD at Hebbal Garrison and carry out water analysis test for Chemical & biological properties and obtaining test report from any Govt apporoved laboratory. Note for item No 1 to 11 and item No 21 to 24:- (a) Quality of water shall be as laid down by Policy and test certificate to prove the portablitiy of water issued by a Govt approved laboratory shall be produced by the contactor for each month. The water shall confirm to acceptablity limits of potability as laid down in IS -10500.(b) Monthly water testing reports submmited to this office. |
| 23 | Taking out sample of water supplied by BWSSB from source of receiving station at Guntha vihar P/h and carry out water analysis test for Chemical & biological properties and obtaining test report from any Govt apporoved laboratory. |
| 24 | Taking out sample of water supplied by BWSSB from source of receiving station at NTG / NLC and carry out water analysis test for Chemical & biological properties and obtaining test report from any Govt apporoved laboratory. |
| 25 | Comprehensive maintenance of8passenger lift (G+5) @ 0.5m/s manufactured by OMEGA Elevatorsregularly and systematically including inspection adjustment, repair of machine motor and controller parts including worms, bearing gears, brake magnet coilsor break motors, break shoes, brushes, windings, commutators, rotating elements, contacts, coil resistance for operating and motor circuits, magnets frames and other mechanical parts, Door shoes existing capacity of batteries etc as per the direction of Engineer- in charge and as per the written directon of Govt lift inspecter and lubrication as required including emergency call back services and over time examination etc complete all as specified and as directed. Location : ADMC Ph-I |
| 26 | Comprehensive maintenance ofGoods lift (G+5) @ 0.5m/s manufactured by OMEGA Elevators regularly and systematically including inspection adjustment, repair of machine motor and controller parts including worms, bearing gears, brake magnet coilsor break motors, break shoes, brushes, windings, commutators, rotating elements, contacts, coil resistance for operating and motor circuits, magnets frames and other mechanical parts, Door shoes existing capacity of batteries etc as per the direction of Engineer- in charge and as per the written directon of Govt lift inspecter and lubrication as required including emergency call back services and over time examination etc complete all as specified and as directed. Location : ADMC Ph-I |
| 27 | Comprehensive maintenance of Dum weighter Lift (G+2) @ 1m/s manufactured by Heera Engg co Ltd bearing No- 7736 (Phase-I) regularly and systematically including inspection adjustment, repair of machine motor and controller parts including worms, bearing gears, brake magnet coilsor break motors, break shoes, brushes, windings, commutators, rotating elements, contacts, coil resistance for operating and motor circuits, magnets frames and other mechanical parts, Door shoes existing capacity of batteries etc as per the direction of Engineer- in charge and as per the written directon of Govt lift inspecter and lubrication as required including emergency call back services and over time examination etc complete all as specified and as directed. Location : ADMC- Ph -I |
| 28 | Comprehensive maintenance of 8 passenger lift (G+6) @ 1 m/smanufactured bySupriya lift bearing No - 20010 (Phase-II) regularly and systematically including inspection adjustment, repair of machine motor and controller parts including worms, bearing gears, brake magnet coilsor break motors, break shoes, brushes, windings, commutators, rotating elements, contacts, coil resistance for operating and motor circuits, magnets frames and other mechanical parts, Door shoes existing capacity of batteries etc as per the direction of Engineer- in charge and as per the written directon of Govt lift inspecter and lubrication as required including emergency call back services and over time examination etc complete all as specified and as directed. Location - ADMC Ph-II |
| 29 | Comprehensive maintenance of 8 passenger lift (G+6) @ 1.5m/smanufactured bySupriya lift bearing No - 20011 (Phase-II) regularly and systematically including inspection adjustment, repair of machine motor and controller parts including worms, bearing gears, brake magnet coilsor break motors, break shoes, brushes, windings, commutators, rotating elements, contacts, coil resistance for operating and motor circuits, magnets frames and other mechanical parts, Door shoes existing capacity of batteries etc as per the direction of Engineer- in charge and as per the written directon of Govt lift inspecter and lubrication as required including emergency call back services and over time examination etc complete all as specified and as directed. Location - ADMC Ph-II |
| 30 | Comprehensive maintenance of 13 passenger lift (G+5) @ 1m/smanufactured by ESCON Elevators bearing No 16010571, regularly and systematically including inspection adjustment, repair of machine motor and controller parts including worms, bearing gears, brake magnet coilsor break motors, break shoes, brushes, windings, commutators, rotating elements, contacts, coil resistance for operating and motor circuits, magnets frames and other mechanical parts, Door shoes existing capacity of batteries etc as per the direction of Engineer- in charge and as per the written directon of Govt lift inspecter and lubrication as required including emergency call back services and over time examination etc complete all as specified and as directed. Location : Chowdhary Line, Block - A. |
| 31 | Comprehensive maintenance of 13 passenger lift (G+5) @ 1m/smanufactured by ESCON Elevators bearing No 16010562, regularly and systematically including inspection adjustment, repair of machine motor and controller parts including worms, bearing gears, brake magnet coilsor break motors, break shoes, brushes, windings, commutators, rotating elements, contacts, coil resistance for operating and motor circuits, magnets frames and other mechanical parts, Door shoes existing capacity of batteries etc as per the direction of Engineer- in charge and as per the written directon of Govt lift inspecter and lubrication as required including emergency call back services and over time examination etc complete all as specified and as directed. Location:Chowdhary Line, Block - B. |
| 32 | Comprehensive maintenance of 13 passenger lift(G+5) @ 1m/s manufactured by ESCON Elevators bearing No 16010575, regularly and systematically including inspection adjustment, repair of machine motor and controller parts including worms, bearing gears, brake magnet coilsor break motors, break shoes, brushes, windings, commutators, rotating elements, contacts, coil resistance for operating and motor circuits, magnets frames and other mechanical parts, Door shoes existing capacity of batteries etc as per the direction of Engineer- in charge and as per the written directon of Govt lift inspecter and lubrication as required including emergency call back services and over time examination etc complete all as specified and as directed. Location : Chowdhary Line, Block - C. |
| 33 | Comprehensive maintenance of 13 passenger lift (G+5) @ 01m/smanufactured by ESCON Elevators bearing No 17110462, regularly and systematically including inspection adjustment, repair of machine motor and controller parts including worms, bearing gears, brake magnet coilsor break motors, break shoes, brushes, windings, commutators, rotating elements, contacts, coil resistance for operating and motor circuits, magnets frames and other mechanical parts, Door shoes existing capacity of batteries etc as per the direction of Engineer- in charge and as per the written directon of Govt lift inspecter and lubrication as required including emergency call back services and over time examination etc complete all as specified and as directed. Location : RC Line, Block P-80 |
| 34 | Comprehensive maintenance of 13 passenger lift (G+5) @ 1m/smanufactured by ESCON Elevators bearing No 16010570, regularly and systematically including inspection adjustment, repair of machine motor and controller parts including worms, bearing gears, brake magnet coilsor break motors, break shoes, brushes, windings, commutators, rotating elements, contacts, coil resistance for operating and motor circuits, magnets frames and other mechanical parts, Door shoes existing capacity of batteries etc as per the direction of Engineer- in charge and as per the written directon of Govt lift inspecter and lubrication as required including emergency call back services and over time examination etc complete all as specified and as directed.Location : RC Line, Block P-81 |
| 35 | Comprehensive maintenance of 13 passenger lift (G+5) @ 01m/s manufactured by ESCON Elevators bearing No 16010573, regularly and systematically including inspection adjustment, repair of machine motor and controller parts including worms, bearing gears, brake magnet coilsor break motors, break shoes, brushes, windings, commutators, rotating elements, contacts, coil resistance for operating and motor circuits, magnets frames and other mechanical parts, Door shoes existing capacity of batteries etc as per the direction of Engineer- in charge and as per the written directon of Govt lift inspecter and lubrication as required including emergency call back services and over time examination etc complete all as specified and as directed. Location : RC Line, Block P-82 |
| 36 | Comprehensive maintenance of 13 passenger lift (G+5) @ 01m/s manufactured by ESCON Elevators bearing No 17110461, regularly and systematically including inspection adjustment, repair of machine motor and controller parts including worms, bearing gears, brake magnet coilsor break motors, break shoes, brushes, windings, commutators, rotating elements, contacts, coil resistance for operating and motor circuits, magnets frames and other mechanical parts, Door shoes existing capacity of batteries etc as per the direction of Engineer- in charge and as per the written directon of Govt lift inspecter and lubrication as required including emergency call back services and over time examination etc complete all as specified and as directed. Location : RC Line, Block P-83Note for item no 25 to 36 :-(i) The Comprehensive maintenance shall be done through OEM of the lift or from their authorizrd agency.(ii) The contractor shall enter into an MOU with OEM or their authorized agency for maintenance of lifts. The above comprehensive AMC certificate shall be provided by the contractor in favour of GE before commencement of work, after acceptance of CA.(iii) All the parts required shall be genuine/original from OEM only and Approved by Engg-in-Charge.(iv) All the stainless steel parts such as Lift car enclosure, opening doors, jamps,cills etc shall be thoroughly cleaned to remove rust, stains etc with suitable solution. The contractor shall also clean and properly maintain machine room, machineries and lift well as directed by the Engg-in-Charge. The rate quoted deemed to be included in the item .CONTD/---37 |
| 37 | CONTD/-36(v) The rates quoted for the above items shall be included for replacement of minor spares, consumables, accessories like fan, light / cabin light, emergency alarm and other connected items becoming unserviceable during the period and nothing extra shall be allowed.(vi) Major spare parts if any found defective during the period of contract to be replaced as catered hereinafter and shall be measured and paid separately under relevant items.(vii) The contractor is responsible to carryout periodical routine checkup through OEM ( once in a month ) or as per the direction of Engg-in-Charge to ensure the serviceability and proper functioning of lift in all respect.(viii) If any water collected in the lift well shall be drain out with suitable capacity of pumpset with out any extra cost (ix)The contractor is responsible for repair/replacement of LED spot light /light fitting/fan/exhaust fan/call bell/limit switch, main cable and branch cable without any extra cost etc.(x) The contractor is responsible for internal painting of lift cabin once in a contract period without any extra costas per the direction of Engr-in-charge.(xi)The contractor is also responsible for deployed his lift mech daily to report Engr-in-Charge at 0830hr morning without fail for routing check of each lift and handover the daily report of each lift for countersignature. If the lift mech not report to the Engr-in-Charge then necessary recovery will be carriedout i.eRs. 1000/day as a penelty of each lift upto 3 days afterthat Rs.1500/day for next 3 days and after that Rs. 2500/day will be carriedout for each lift.(xii) If the contractor not attend /resolve the logged/given complain within 24 hours then Rs. 1000/day as a penelty will be carriedout upto 3 days afterthat Rs. 1500/day for next 3 days and after that Rs. 2500/day will be carriedout for each lift. |
| 38 | Carrying out the inspection of lift by Govt lift inspector for worthiness certificate all as specified and as directed. |
| 39 | Supply and Fixing in replacement of existing control system to CANBAS Integrated Controller based on collective control panel for trouble free maximum efficieny and longer life to the lift of 08/13 Passengers (G+6/G+5) Lift at different location complete all as specified and as directed. |
| 40 | Supply and Fixing in replacement of Car Operating Panel with all accessories suitable for 08/13 Passenger (G+6/G+5) Lift at different location complete all as specified and as directed. |
| 41 | Supply and Fixing in replacement of Dynamic Breaking Resistor with all accessories suitable for installed at 08/13 Passengers (G+6/G+5) Lift at different location complete all as specified and as directed. |
| 42 | Supply only Rotary Encoder for Speed feedback of Main Drive complete all accessories suitable for 08/13 Passenger (G+6/G+5) Lift at different location complete all as specified and as directed. |
| 43 | Supply and Fixing in replacement of Shaft Information System with all accessories suitable for 08/13 Passenger (G+6 / G+5) Lift at different location complete all as specified and as directed. |
| 44 | Supply and Fixing in replacement of Full Curtain Infra red door sensor commplete all accessories of suitable for 08/13 Passenger (G+6/G+5) Lift at different location complete all as specified and as directed. |
| 45 | Supply and Fixing in replacement of AUto Rescue Device commplete all accessories of suitable for 08/13 Passenger (G+6/G+5) Lift at different location complete all as specified and as directed. |
| 46 | Supply and Fixing in replacement of Floor Annoucement System suitable for 08/13 Passenger (G+6/G+5) Lift at different location complete all as specified and as directed. |
| 47 | Supply and Fixing iof Main Rope dia 13 mm, 8/19 construction in and including necessary connection with clamps, nuts, bolts and washer etc suitable for 08 Passenger Capacity Lift with 08/13 Passenger (G+6/G+5) Lift at different location complete all as specified and as directed. |
| 48 | Supply and Fixing iof Main Rope dia 8mm, 8/19 construction in and including necessary connection with clamps, nuts, bolts and washer etc suitable for 08 / 13 Passenger Capacity Lift with (G+6/G+5) Lift at different location complete all as specified and as directed. |
| 49 | Supply and Fixing of Overload Warning Indicator for 08 / 13 Passenger Capacity Lift with (G+6/G+5) Lift at different location complete all as specified and as directed. |
| 50 | Overhauling of Machine & Gear Box installed at 08 / 13 Passenger Capacity Lift with (G+6/G+5) Lift at different location complete all as specified and as directed. |
| 51 | Supply and Fixing in replacement of Landing Operating Panel with all accessoriessuitable for 08/13 Passenger(G+6/G+5) Lift at different location complete all as specified and as directed. |
| 52 | Supply and Fixing in replacement of shaft wiring with all accessories suitable for 08/13 Passenger (G+6/G+5) Lift at different location complete all as specified and as directed. |
| 53 | Supply and Fixing in replacement of Traveling Cable with all accessories suitable for 08/13 Passenger(G+6/G+5) Lift at different location complete all as specified and as directed. |
| 54 | Supply and Fixing in replacement of Hose Reel Drum 30m complete all as specified and as directed |