| 1 | Clearing light jungle area, bulb weeds, grass including cutting all unwanted plants, branches, twigs, wild growth etc. complete, and disposing the same 100 metres away manually or burning them without disturbing other areas etc., complete all as directed by the Engineer-in-charge. Contractor must be informed to Engineer-in-charge and prior permission shall be obtained from him for burning the wild growth. |
| 2 | Earthwork excavation by mechanical means (Hydraulic excavator) or manual means for foundation, substructures, plinth beam, cess pits & trenches, all kinds of foundation etc.,in all types of soil like hard gravelly soil, sandy soil for the followingdepth from average ground level upto the required founding level, line and grades in both dry and wet conditions including shoring, strutting, bailing out of water if necessary, levelling, ramming and achieving 95% modified proctor density at the bottom of trenches, dressing of sides, stacking the excavated materials away from the edge of trenches, refilling the sides of foundation as required with selected excavated earth and depositing / disposing the surplus excavated earth (Disposed soil to be leveled by breaking clods, if any and neatly dressed and leveled) within the lead specified below all complete as per specifications and as directed by the Engineer-in-charge.(if water encountered during excavation , it shall be drained out by proper dewatering arrangements and power supply required for dewatering shall borne by the contractor.)Note:1. Proper compaction shall be carried out at the founding level with a suitable roller of adequate capacity.2. Refilling shall be done in layers of not more than 300mm. |
| 3 | All kinds of soil with depth upto 1.5m below average Ground level and disposing surplus excavated earth upto a lead of 1Km. |
| 4 | Engineered back fillingwith selected earth including excavation from borrow pits with a lead upto 60 km filling in layer of not more than 300 mm, each layer well rammed and consolidated including water consolidation etc complying with standard specification. 1) Necessary permission from state authorities for bringing the required earth will be the responsibility of the contractor. 2) The quality of earth required for the work shall be got approved for borrow pits outside the property within a lead upto 60 km from EIC before supply. 3) Necessary Testing to be carried out for compaction and as directed by the Engineer all as per specification, including excavation, loading transporting, depositing in loose layers of each 300 mm thickness, after removing / breaking clods etc. watering to optimum moisture content and compacting each layer to 95 % of maximum dry density etc., all as specified and as directed by the EIC. |
| 5 | Providing and laying plain cement concrete M20 grade using 300 kg/cum of PPC, 20mm maximum size graded aggregates and washed crushed stone sand including mechanical mixing, transporting and placing in required position, ramming, compaction, levelling, curing, shuttering, dewatering if any, complete all as per specification for levelling courses in foundation for walls, footings, floor drains etc., encasing pipes and other required works directed by Engineer-in-Charge complete all as per specifications. Dosage of PCE based admixture as per workability requirment at site conditions. Note: 1. The rate of concrete shall include all labour, equipment, charges for mixing & cost of admixture. Polycarboxylate ether (PCE) based chemical admixture confirming to IS 9103 shall be mixed in fresh concrete and prior permission from engineer-in-charge shall be obtained for dosage and compatibility.2. Test certificate of cement, procured from dealer/company to be submitted for all cement related works by the Contractor.3. The rate shall be quoted on the basis of using minimum cement per cu.m. of concrete mentioned below for relevant grade of concrete. Any upward/ downward variation required to obtain the specified strength will be paid for or deducted at the rate of cement specified in Schedule F. |
| 6 | Providing and laying cast insitu controlled reinforced cement concrete of M30 grade with 380 kg of PPCper cu.m. of concrete at all levels and lifts mentioned below using 20mm maximum size hard granite machine washed washed crushed graded stone aggregates and washed washed crushed stone sand including testings as per QAP, weigh batching, charges for mixing & cost of admixture, mechanical mixing, transporting and placing at all lifts, vibrating, consolidating, 14 days curing and finishing smooth of all exposed faces complete for column footing, columns, lintels, sunshades, gutter slabs, beams, slabs, water tank, machine foundation and all other structural elements including dewatering wherever necessary (Formwork and reinforcement will be paid for separately) all as per specification and all as shown in drawings and as directed by the Engineer-in-charge for all insitu item.Note: 1. The rate of concrete shall include all labour, equipment, charges for mixing & cost of admixture. Polycarboxylate ether (PCE) based chemical admixture confirming to IS 9103 shall be mixed in fresh concrete and prior permission from engineer-in-charge shall be obtained for dosage and compatibility2. Test certificate of cement, procured from dealer/company to be submitted for all cement related works by the Contractor.3. The rate shall be quoted on the basis of using minimum cement per cu.m. of concrete mentioned below for relevant grade of concrete. Any upward/ downward variation required to obtain the specified strength will be paid for or deducted at the rate of cement specified in Schedule F. |
| 7 | M30 grade with 380 kg of PPC per cu.m. of concrete upto plinth level |
| 8 | Providing straightening, decoiling wherever necessary bending, cutting, binding and fixing in position steel reinforcement TMT bars of Fe550D grade steel conforming to IS:1786 and tying with approved annealed binding wire of 1.6mm dia in all reinforced cement concrete work at all lifts, including cost of supplying and fixing the spacer/cover blocks and binding wire complete all as per specification and as directed by Engineer-in-Charge at all lifts. Note: The rate shall be including the cost and testing of reinforcement steel at thrid party NABL lab. The reinforcement steel will be procured from dealers with a test certificate as approved by the department. For further details please see Clause 11 of Section VIII, General Information for Guidance of Tenderers. |
| 9 | Supplying, fabricating, erecting and fixing in position at all levels, centering and shuttering to correct line and levels including strutting, propping, etc., with necessary bracings in all axes to give a stable assembly with provision for making the joints in the shuttering fully leak proof and with provision for fixing coil nuts with tie rods along with suitable channel for lateral supports and for inserts, projecting dowels, anchor bolts or any other fixture, including staging, access and working platforms etc., all complete as specified and directed including dismantling and removing the aforesaid assembly after the concrete attains the sufficient strength to self-support itself without cracking and distortion all as per specification, including all materials and labour complete in all respects at all lifts. The measurement for the formwork will be the actual area of forms in contact with concrete surfaces. Shuttering with plywood panels alone will be permitted. |
| 10 | Providing, supplying, cutting, bending to shape, welding, fabricating, hoisting, placing and fixing in position structural steel members like MS structural embedment\"s/pipe and sleeves/penetration etc.Using MS angles, channels, I-sections, plates, tees, flats, rounds, square sections etc. including chamfering and rounding off the edges, applying a coat of Red lead paint primer / Zinc chromate primer of approved make and 2 coats of flat oil paint / sythetic enamel paint of approved colour and make, scaffolding and staging required for fabrication as well as erection complete all as per specifications, drawings and as directed by the Engineer-in-charge.Note: Lifting device arrangements if any required also arranged by the contractor at his own cost. |
| 11 | Dewatering from trenches, sump, foundation structure using electrical submersible or suitable pump of required capasity with necessary arrangements to the nearest storm water drain or at places shown as directed by EIC including HDPE pipe, maintenance of the system, cost of spares, idling, labour for operation etc. Mode of measeurement will be power consumption in KWh. Note: This item will be operated during abnormal bad weather, surface run off from outside scope of work only aslo it shall be estimated for already existing culverts/Strom water drain. |
| 12 | Providing and applying painting Two coats at all levels with Acrylic emulsion paint of (ACE or Equivalent approved brand, colour and manufacturer) to give an even shade including preparation of the surfaces, applying putty, scaffolding complete all as per specifications and as directed by the Engineer-in-charge. |