| 1 | Earth work in excavation of foundation in hard soil with all lead and lift including levelling the bed of the foundation to the required width and depth & depositing the excavated earth away from works site etc.complete.as per specification and direction of the Engineer-in-charge |
| 2 | Filling foundation and Plinth with sand well watered and rammed including cost carriage and royalty of sand etc.complete as per the specification and direction of the Engineer-in-charge. |
| 3 | Cement Concrete (1:4:8) using 40mm size C.B.H.G. chips including cost carriage royalty and taxes of all materials etc. complete as per specification and direction of the Engineer-in-charge. |
| 4 | Flyash Brick masonary in C.M (1:6) in foundation and plinth including cost, carriage royalty taxes all labour, T&P etc required for the work etc complete.as per specification an direction of the Engineer-in-charge. (a) In Foundation and Plinth |
| 5 | Flyash Brick masonary in C.M (1:6) in Superstructure including cost, carriage royalty taxes all labour, T&P etc required for the work etc complete.as per specification an direction of the Engineer-in-charge. (b) In Superstructure |
| 6 | 16mm thick cement plaster in C.M (1:6) for brick work including cost carriage royalty and curring etc.complete as per specification and direction of the Engineer-in-charge. |
| 7 | 12mm thick cement plaster in C.M (1:6) for brick work including cost carriage royalty and curring etc.complete as per specification and direction of the Engineer-in-charge. |
| 8 | Supplying, fitting & fixing Vitrified Tiles in flooring using special plain / printed series Ceramic Floor Tile of premium grade ( having minimum thickness 7 mm to 8 mm & size 600 mm x600 mm, confirming to I.S 13755 of approved quality and shade in floors, treads on steps and landings on 20 mm thick bed of cement mortar of mix (1:4) laid in proper slope and gradient with screened & washed sharp river sand for mortar and fixing with neat white cement slurry,grouting the joints with neat white cement slurry mixed with required quantities of pigments (Tiles are to be immersed in the water for required time before use) of approved make to match the shades of the Ceramic Floor Tiles if required including cost, conveyance, loading, unloading, stacking, royalties , all taxes, cost of all Labour, Labour cess ,Sundries, T&P required for the work , Watering , Curing for required days , cleaning the flooring space manually etc. complete in all respect as directed by the Engineer-in-charge |
| 9 | Supplying, fitting & fixing Vitrified Tiles in flooring using special plain / printed series Ceramic Floor Tile of premium grade ( having minimum thickness 7 mm to 8 mm & size 600 mm x600 mm, confirming to I.S 13755 of approved quality and shade in floors, treads on steps and landings on 20 mm thick bed of cement mortar of mix (1:4) laid in proper slope and gradient with screened & washed sharp river sand for mortar and fixing with neat white cement slurry,grouting the joints with neat white cement slurry mixed with required quantities of pigments (Tiles are to be immersed in the water for required time before use) of approved make to match the shades of the Ceramic Floor Tiles if required including cost, conveyance, loading, unloading, stacking, royalties , all taxes, cost of all Labour, Labour cess ,Sundries, T&P required for the work , Watering , Curing for required days , cleaning the flooring space manually etc. complete in all respect as directed by the Engineer-in-charge |
| 10 | Supplying,fitting and fixing vetrified tiles in dados skirting and risers of steps on 12mm thick cement plaster (1:3) jointed with neat cement slurry mixed with pigment to match the shades of the tiles including rubbing and polishing complete. |
| 11 | Supplying,fitting and fixing vetrified tiles in dados skirting and risers of steps on 12mm thick cement plaster (1:3) jointed with neat cement slurry mixed with pigment to match the shades of the tiles including rubbing and polishing complete. |
| 12 | R.C.C. M-20 using 20mm and down graded Chips of approved quality from approved quarry for RCC works including hoisting and laying with cost, conveyance & royalty of materials T&P articles required for the work etc. complete as per direction of the Engineer-in-Charge.(a) Column Base |
| 13 | Column Sup/Beam |
| 14 | Plinth band |
| 15 | Lintel |
| 16 | Lintel bearing chajja |
| 17 | Roof Slab |
| 18 | Supplying, fitting and placing HYSD bar reinforcement for R.C.C work including cutting,bending,binding and tying grills and placing in position including cost of steel and binding wire etc.complete as per specification and direction of the Engineer-in-charge. |
| 19 | 2.5 thick grading concerete (1:2:2) on roof slab with 6mm size H.G Chips including cost, carriage royanty, taxes , all labour and T & P etc complete as per specification and direction of the Engineer-in- charge. |
| 20 | Providing, fitting and fixing of false ceiling with aluminum anodised T section no 3215 with 2\"0\" centre to centre, L section no 1705 upto 15 micron on four walls to be fixed by means of steel screw and PVC plug and the aluminium grid 2\"0\"x2\"0\" suspended from ceiling etc. complete. |
| 21 | Supplying, fitting, fixing of iron grill in doors, windows, ventilators including fitting, fixing etc. all complete. |
| 22 | Supplying , fitting and fixing of openable UPVC doors with door frame of approved make with 6mm thick glass of approved quality complete with frame, shutters and all fitting and fixtures. UPVC Doors |
| 23 | PVC Door |
| 24 | Supplying, fitting and fixing up window (sliding type) made up Aluminium section 9778 as window frame, section no. 4095,4096,9777,3994 as shutter frame with 5mm thick black glass as panel fitted with rubber beading including locking arrangement including all fitting including cost of material all taxes labour T&P excluding cost of glass etc. complete as per direction of Engineer-in-charge. |
| 25 | Finishing wall surface with Acrylic wall putty( water based) of approved make and finished smooth and even surface to receive painting including cost of scaffolding staging charges with cost of all materials, taxes, labour, T&P etc complete as per specification and direction of the Engineer-in-charge. |
| 26 | Painting two coats with weather coats of approved shade on old work to give an even shade including cost of paint etc complete as per specification and direction of the EIC. |
| 27 | Priming one coat with approved water bound wall cement primer to the plastered surface including cost of primer and all labour T&P articles required for the wok etc complete as per specification and direction of the Engineer-in-charge. Please Enable Macros to View BoQ information |