| 1 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved. |
| 2 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. |
| 3 | Nominal concrete 1:4:8 or leaner mix (including equivalent design mix) |
| 4 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: |
| 5 | Cement mortar 1:6 (1 cement : 6 coarse sand) |
| 6 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chaijjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-lIll) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for |
| 8 | Suspended floors, roofs, landings, balconies and access platform |
| 9 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. |
| 10 | Thermo-Mechanically Treated bars of grade Fe-500D or more. |
| 11 | Tile brick masonry with common burnt clay F.P.S. (non modular) tile bricks of class designation 10 in plain arch work in superstructure above plinth and upto floor five level in cement mortar 1:4 (1 cement : 4 coarse sand) including centering and shuttering complete. |
| 12 | Repair to plaster of thickness 12 mm to 20 mm in patches of area 2.5 sqm and under, including cutting the patch in proper shape, raking out joints and preparing plastering the wall surface with white cement based polymer modifiedself curing mortar, including disposal of rubbish, all completeas per the direction of Engineer-In-Charge. |
| 13 | Repairing of damaged RCC roof by hydraulic lifting and alignment of sagged RCC/reinforment portion and exposed reinforcement; including cutting, straightening/cropping of bent reinforcement, removal of loose concrete, and preparing the surface to the proper casting level finish, complete in all respects. |