| 1 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work upto plith level - 1:4:8 (1 cement : 4 fine aggregate : 8 graded stone aggregate 40mm nominal size) |
| 2 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns,piers, abutments, pillars, posts,struts, buttresses, string or lacing courses, parapets, coping,bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc. upto floor five level, excluding the cost of centering ,shuttering and finishing - 1:2:4 (1 cement : 2 fine aggregate : 4 graded stone aggregate 20mm nominal size) |
| 3 | Reinforced cement concrete work in beams, suspended floors , roofs having slope up to 15degree landings , balconies , shelves , chajjas , lintels , bands , plain window sills , staircases and spiral stair cases above plinth level up to floor five level excluding the cost of centering ,shuttering, finishing andreinforcement , with 1:1.5:3 (1 cement : 1.5 fine aggregate : 3 graded stone aggregate 20mm nominal size) |
| 4 | Providing ,transporting, hoisting and fixing upto floor five level precast reinforced cement concrete in shelves including setting in cement mortar 1:3 (1 cement : 3 fine aggregate) , cost of required centering , shuttering and finishing with neat cement punning on exposed surfaces but excluding the cost of reinforcement , with 1:1.5:3 (1 cement : 1.5 fine aggregate : 3 graded stone aggregate 20 mm nominal size) |
| 5 | Centering and shuttering including strutting , propping etc and removal of form for - Suspended floors , roofs , landings , balconies and access platform |
| 6 | Steel reinforcement for R.C.C.work including straightening , cutting , bending , placing in position and binding all complete upto plinth level - Thermo -Mechanically treated bars Fe - 500D or more |
| 7 | Brick work with common burnt clay F.P.S. (non modular ) bricks of class designation 3.5 in foundation and plinth in - cement mortar 1:6 (1 cement : 6 fine aggregate) |
| 8 | Provding and laying autoclaved aerated concrete (AAC) blocks masonry with 100mm /125 mm thick with grade - 1 AAC blocks of density 551 to 650 kg/cum conforming to IS:2185 (Part 3 ) in superstructure above plinth level upto floor five level in cement mortar 1:4 (1 cement : 4 fine aggregate) . The rate includes providing and placing in position 2 nos 6 mm dia M.S.bars at every third course of masonry work. |
| 9 | Providing and fixing IS : 12817 marked stainless steel butt hinges with stainless steel screws etc.complete - 100 x 58 x 1.90 mm |
| 10 | Providing and fixing bright finished brass tower bolts (barrel type) with necessary screws etc complete - 150 X 10 mm |
| 11 | Providing and fixing bright finished brass handles with screws etc complete - 100 mm |
| 12 | Providing and fixing factory made uPVC glazed /wire mesh windows /doors comprising of lead free uPVC multichambbered frame, sash and mullion/coupler (where ever require ) extruded profiles having minimum wall thickness of 1.70 mm for series R1 and R2 profiles and 2.10 mm for series R3 and R4 profiles conforming to EN:12608 in any shape, colour and design dully reinforced with galvanized mild steel section made of required shape, and size as per CPWD specification, uPVC extruded glazing beads, interlocks and inline sash adaptor (where ever required) of appropriate dimension, EPDM gasket, hardware, SS 304 grade fasteners of minimum 8mm dia with countersunk head, comprising of matching polyamide PA6 grade sleeve for fixing frame to finished wall as per IS 1367 :Part 1 to 14, plastic packers , plastic caps and necessary stainless steel screws etc. Profile of frame , sash and mullion (if required) shall be mitred cut and fusion welded/mechanically jointed duly sealed at all corners, including drilling of holes for fixing hardware and drainage of water etc. After fixing frame the gap between frame and adjacent finished wall shall be filled with weather proof silicon |
| 13 | sealant over backer rod of approved size and quality, all complete as per approved drawing conforming to CPWD specification & direction of Engineer-in-charge. Section of steel reinforcement and cross sections of uPVC profiles to be as per design approved by Engineer-in-charge . - wire mesh / glazing of plain/ toughened / laminated/ double glass unit with / without high performance coatings as per design rquirements and conforming to IS: 3548 & IS:16231shall be paid separately. Note:- Structural design proof checked from a Government Engineering institute, to be provided by the manufacturer for :(i) Sites with basic wind speed >45m/sec as per IS:875 - Part 3 (ii) Sites with structure height more than 20 m for all wind speeds- Three track three panels sliding window with aluminium channel for roller track, wool pile, nylon |
| 14 | Providing and fixing factory made uPVC glazed /wire mesh windows /doors comprising of lead free uPVC multichambbered frame, sash and mullion/coupler (where ever require ) extruded profiles having minimum wall thickness of 1.70 mm for series R1 and R2 profiles and 2.10 mm for series R3 and R4 profiles conforming to EN:12608 in any shape, colour and design dully reinforced with galvanized mild steel section made of required shape, and size as per CPWD specification, uPVC extruded glazing beads, interlocks and inline sash adaptor (where ever required) of appropriate dimension, EPDM gasket, hardware, SS 304 grade fasteners of minimum 8mm dia with countersunk head, comprising of matching polyamide PA6 grade sleeve for fixing frame to finished wall as per IS 1367 :Part 1 to 14, plastic packers , plastic caps and necessary stainless steel screws etc. Profile of frame , sash and mullion (if required) shall be mitred cut and fusion welded/mechanically jointed duly sealed at all corners, including drilling of holes for fixing hardware and drainage of water etc. After fixing frame the gap between frame and adjacent finished wall shall be filled with weather proof silicon |
| 15 | sealant over backer rod of approved size and quality, all complete as per approved drawing conforming to CPWD specification & direction of Engineer-in-charge. Section of steel reinforcement and cross sections of uPVC profiles to be as per design approved by Engineer-in-charge . - wire mesh / glazing of plain/ toughened / laminated/ double glass unit with / without high performance coatings as per design rquirements and conforming to IS: 3548 & IS:16231shall be paid separately. Note:- Structural design proof checked from a Government Engineering institute, to be provided by the manufacturer for :(i) Sites with basic wind speed >45m/sec as per IS:875 - Part 3 (ii) Sites with structure height more than 20 m for all wind speeds- Two track two panels sliding door with aluminium channel for roller track, wool pile, zinc alloy (Zamak) powder coated handle on every panel along with multipoint locking systems, adjustable nylon rollers with SS 304 body - Using R3 series with frame (55 mm & above) x (40mm & above) & sash (30mm & above) x(74mm & above) (height upto 2.50m) |
| 16 | Providing and fixing factory made uPVC white colour sliding glazed window upto 1.50m in height dimension comprising of uPVC multi - chambered frame with in-built roller track and sash extruded profiles duly reinforced with 1.60 + or - 0.2 mm thick galvanized mild steel section made from roll forming process of required length (shape & size according to uPVC profile), appropriate dimension of uPVC extruded glazing beads and uPVC extruded interlocks, EPDM gasket, wool pile , zinc alloy (white powder coated) touch locks with hook , zinc alloy body with single nylon rollers (weight bearing capacity to be 40 kg), G.I. fastners 100 x8 mm size for fixing frame to finished wall and necessary stainless steel screws etc. Profile of frame & sash shyall be mitred cut and fusion welded at all corners, including drilling of holes for |
| 17 | fixing hardware\"s and drainage of water etc.After fixing frame the gap between frame and adjacent finished wall shall be filled with weather proof silicon sealent over backer rod of required size and of approved quality , all complete as per approved drawing.(Single / double glass panes , wire mesh and silicon sealent shall be paid separately) - Two track two panels sliding window made of (small series) frame 52 x 44 mm & sash 32 x 60 mm both having wall thickness of 1.9 + or - 0.2 mm and single glazing bead of appropriate dimension.(Area of window upto 1.75 sqm) - sliding window size 1.20x1.35 m |
| 18 | Steel work in built up tubular (round,square or rectanglar hollow tubes etc.) trusses etc., including cutting , hoisting,fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete - hot finished welded type tubes |
| 19 | Providing and laying vitrified floor tiles of size 600 x600 mm (thickeness to be specified by the manufacturer) with water absorption less than 0.08% and conforming to IS: 15622 of approved make , in all colours and shades, laid on 20 mm thick cement mortar 1:4 (1 cement : 4 fine aggregate) ,jointing with grey cement slurry @3.3 kg per sqm including grouting the joints with white cement and matching pigments etc., complete - size of tile 600x600mm |
| 20 | Providing and laying 22 mm thick factory made pre-polished cement concrete flooring tiles of required colour and design over 20 mm thick cement mortar 1:4 (1 cement : 4 sand ) and jointed with cement slurry mixed with an admixture of pigment to match the shade of the tile. |
| 21 | Providing and fixing on wall face unplasticised rigid PVC rain water pipes conforming to IS: 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10mm gap for thermal expansion, (i) Single socketed pipes - 110 mm diameter |
| 22 | Providing and fixing precoated galvanised iron profile sheets (size, shape and pitch of corrugation as approved by Engineerin-Charge) of total coated thickness 0.50mm (base metal of minimum 0.45mm thickness with total coating thickness of 0.05mm) with zinc coating 120 grams per sqm as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns. Sheet should have protective guard film of 25 microns minimum to avoid scratches during transportation and should be supplied in single length upto 12 metre or as desired by Engineer-in-charge. The sheet shall be fixed using self drilling /self tapping screws of size (5.5x 55 mm) with EPDM seal, complete upto any pitch in horizontal/ vertical or curved surfaces, excluding the cost ofpurlins, rafters and trusses and including cutting to size and shape wherever required. |
| 23 | 12mm cement plaster of mix -1:4 ( 1 cement : 4 fine aggregate) |
| 24 | 15mm cement plaster on the rough side of single or half brick wall of mix - 1:4 (1cement : 4 fine aggregate) |
| 25 | Finishing walls with ready mixed Premium acrylic emulsion paint (company depot tinted) having VOC less than 50gm/litre and UV resistance as per IS 15489:2004, Alkali& fungal resistance , dire resistance exterior paint of required shade with silicon additives- New work (Two or more coats applied @ 1.43 litre / 10 sqm over and including priming coat of exterior primer applied @0.90 litre / 10 sqm. |
| 26 | Finishing with deluxe multi surface paint system for interiors and exteriors using primer as per manufacture\"s specification - Two or more coats applied on walls @ 1.25 ltr / 10 sqm over and including one coat of special primer applied @ 0.75 ltr / 10 sqm |
| 27 | Removing white or colour wash by scrapping and sand papering and preparing the surface smooth including necessary repairs to scratches etc., complete |
| 28 | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade- One or more coats on old work |
| 29 | Repairs to plaster of thickness 12mm to 20mm in patches of area 2.5 sq.metres and under including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete including disposal of rubbish to the dumping ground as per direction of Engineer-in-charge - with cement mortar 1:4 (1 cement : 4fine aggregate) |
| 30 | Providing and fixing double scaffolding system (cup lock type) on the exterior side, upto seven story height made with 40 mm dia .M.S.tube 1.5m centre to centre , horizontal & vertical tubes joining with cup & lock system with M.S.tubes, M.S.tube challies, M.S.clamps and M.S.staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after. The scaffolding system shall be stiffened with bracings, runners, connection with the buildingetc wherever required for inspection of work at required locations with essential safety features for the workmen etc.complete as approved. The elevational area of the scaffolding shall be measured for payment purpose. The payment will be made once irrespective of duration of scaffolding. (Note: This item to be used for maintenance work judicically, necessary deduction for scaffolding in the existing item to be done.) |
| 31 | Demolishing lime concrete manually / by mechanical means and disposal of material within 50 metres lead as per direction of Engineer-in-charge. |
| 32 | Grading roof for water proofing treatment with - Cement concrete 1:2:4 (1 cement : 2 fine aggregate : 4 graded stone aggregate 20 mm nominal size) |
| 33 | Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer-in-charge. - Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) |
| 34 | Demolishing R.C.C work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer-incharge. |
| 35 | Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.- in cement mortar |
| 36 | Taking out doors, windows and clerestory window shutters (steel or wood) including stacking within 50 metres lead - of area 3 sqm and below |
| 37 | Taking out doors, windows and clerestory window shutters (steel or wood) including stacking within 50 metres lead - of area beyond 3 sqm |
| 38 | Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead - for thickness of tiles 10mm to 25mm |
| 39 | Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead |
| 40 | Acid cleaning for the existing Mosaic floors , glazed tiles work and removing the stains and decays to give a glassy look etc complte (The Acid used shall be 32% concentrated hydrochloric acid after taking on the precautionary measures) |
| 41 | Providing and fixing water closet squatting pan (Indian type W.C.pan) with 100 mm Sand Cast Iron P or S trap, 10 litre low level white P.V.C flusing cistren, including flush pipe with , manually controlled device (handle lever) conforming to IS : 7231 , with all fittings and fixtures complete , including cutting and making good the walls and floors wherever required. Stainless steel AISI -304 (18/8) Orissa pattern W.C.pan of size 585 x 480 mm with flush pipe and integrated type foot rests |
| 42 | Providing and fixing white vitreous china pedestal type water closet (European type W.C.pan) with seat and lid, 10 litre low level white P.V.C. flusing cistern, including flush pipe, with manually controlled device (handle lever), conforming to IS: 7231,with all fittings and fixtures complete, including cutting and making good the walls and floors wherever required - W.C. pan with ISI marked white solid plastic seat and lid |
| 43 | Providing and fixing wash basin with C.I. brackets, 15mm C.P. brass pillar taps ,32 mm C.P.brass waste of standard pattern , including painting of fittings and brackets ,cutting and making good the walls wherever required - white Vitreous China wash basin size 630x450 mm with a single 15 mm C.P.brass pillar taps |
| 44 | Providing and fixing G.I. inlet connection for flush pipe connecting with W.C.pan |
| 45 | Providing and fixing white vitreous china flat back or wall corner type lipped front urinal basin of 430x260x350mm or 340x410x265mm sizes respectively |
| 46 | Providing and fixing CP brass health faucet of approved quality - 15 mm nominal bore |
| 47 | Providing and fixing Chlorinated Polyvinnyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings including fixing the pipe with clamps at 1.00m spacing.This includes jointing of pipes & fittings with one step CPVC solvent cement and testing of joints complete as per direction of Engineer-incharge - internal work - exposed on wall - 20 mm nominal dia pipes |
| 48 | Providing and fixing Chlorinated Polyvinnyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings including fixing the pipe with clamps at 1.00m spacing.This includes jointing of pipes & fittings with one step CPVC solvent cement and testing of joints completeas per direction of Engineer-incharge - internal work - exposed on wall - 25mm nominal dia pipes |
| 49 | Providing and fixing ASTM pipes including all ASTM plain & brass threaded fittings i/c fixing the pipe with clamps at 1.00m spacing . This includes jointing of pipes & fitting with one step ASTM solvent cement and testing of joints complete (Internal work exposed on wall ) - 63mm nominal outer dia pipes |
| 50 | Providing and fixing rectangular high density polyethylene water storage loft tank with cover ISI: 12701 marked, colour of opaque white or as approved by Engineer-in-charge. The rate includes making necessary holes for inlet, outlet & over flow pipes. The base support including fittings and fixtures for tank shall be paid separately |
| 51 | Providing and fixing C.P.brass long body bib cock of approved quality conforming to IS standards and weighing not less than 690 gms - 15 mm nominal bore |
| 52 | Providing and fixing C.P.brass angle valve for basin mixer and geyser points of approved quality conforming to IS: 8931- 15 mm nominal bore |
| 53 | Providing and fixing on wall / column face unplasticed - PVC soil and waste pipes (type - B) conforming to IS : 13592- 1992 including jointing with seal ring conformation to IS : 5382 leaving 10mm gap for thermal expansion - single socked pipes - 110mm diametre |
| 54 | Providing and fixing on wall face unplasticised - PVC moulded fittings / accessories for unplasticised rigid PVC rain water pipes conforming to IS:13592 Type A, including jointing with seal ring conforming to IS: 5382, leaving 10mm gap for thermal expansion - bend 87.5 degree - 110 mm bend |
| 55 | Providing and fixing on wall face unplasticised - PVC moulded fittings / accessories for unplasticised rigid PVC rain water pipes conforming to IS:13592 Type A, including jointing with seal ring conforming to IS: 5382, leaving 10mm gap for thermal expansion - shoe (plain) - 110mm shoe |
| 56 | Providing and fixing unplasticised - PVC pipe clips of approved design to unplasticised- PVC rain water pipes by means of 50x50x50mm hard wood plugs , screwed with M.S. screws of required length, including cutting brickwork and fixing in cement mortar 1:4 ( 1 cement : 4 fine aggregate) and making good the wall etc., complete - 110mm |
| 57 | Providing and laying water proofing treatment in sunken portion of WCs , bathroom etc., by applying cement slurry mixed with water proofing cement compound consisting of applying :- a) First layer of slurry of cement @0.488 kg / sqm mixed with water proofing cement compound @ 0.253 kg / sqm . This layer will be allowed to air cure for 4 hours - b) second layer of slurry of cement @ 0.242 kg / sqm mixed with water proofing cement compound @ 0.126 kg /sqm . This layer will be allowed to air cure for 4 hours followed with water curing for 48 hours. The rate included preparation of surface, tratment and sealing of all joints, corners, junctions of pipes and masonry with polymer mixed slurry |
| 58 | Chipping of unsound / weak concrete material from slabs , beams , columns etc. with manual Chisel and / or by standard power driven percussion type or of approved make including tapering of all edges , making square shoulders of cavities including cleaning the exposed concrete surface and reinforcement with wire brushes etc. and disposal of debris for all lead and lifts all complete as per direction of Engineer-incharge- 50 mm average thickness |
| 59 | Cleaning of reinforcement from rust from the reinforcing bars to give it a total rust free steel surface by using alkaline chemical rust remover of approved make with paint brush and removing loose particles after 24 hours of its application with wire brush and thoroughly washing with water and allowing it to dry , all complete as per direction of the Engineer-in-chargeBars above 12mm diameter |
| 60 | Providing , mixing and applying SBR polymer (of approved make ) modified Cement mortar in proportion of 1:4 (1 cement : 4 graded fine aggregate with polymer minimum 2% by wt.of cement used) as per specifications and direction. Note: Measurement and Payment : The Pre-meaurement of thickness shall be done just after the surface preparation is completed and payment under this item shall be made only after proper wet curing has been done and surface has been satisfactorily evaluated by sounding / tapping with a blunt metal instrument and / or the 75mm size cube crusing strength at the end of 28 days to be not less than 30 N / Sqmm) - 25 mm average thickness in two layers |
| 61 | Providing and applying white cement based putty of average thickness 1mm of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete |
| 62 | Providing and fixing factory made single extruded WPC (Wood Polymer composite) solid door / window / Ceosetory windows and Other frames/ Chowkhat comprising of virgin PVC polymer of K value 58-60 ( Suspension Grade) calcium carbonate and natural fibers (wood powder/ rice husk/ wheatusk) and non toxic additives (maximum toxicity index 12 for 100 gms) fabricated with miter joints after applying PVCsolvent cement and screwed with full body threaded star headed SS screws having minimum frames density of 750 kg / cum, screw withdrawal strength of 2200 N (Face) and 1100 N (Edge), minimum compresssive strength of 58N/sq.mm, modulus of elasticity 900 N/sq.mm and resistance to spread of flame of class A category with property of being termite / borer proof, water / moisture proof and fire retardant and fixed in position of with M.S hold fast/lugs /SS dash fasteners of required dia and length complete as per direction of Engineerin-charge (M.S hold fast/lugs or SS dash fastners shall be paid for separately) Note: For WPC solid door / window frames, minus 5mm tolerance in dimensions i.e. depth and width of profile shall be acceptable . |
| 63 | Variation in profile dimension on plus side shall be acceptable but no extra payments on this account shall be made. - Frame size 45 x 85 mm (Wood Polymer composite) solid door / window / Ceosetory windows and Other frames/ Chowkhat comprising of virgin PVC polymer of K value 58-60 ( Suspension Grade) calcium carbonate and natural fibers (wood powder/ rice husk/ wheat husk) and non toxic additives (maximum toxicity index 12 for 100 gms) fabricated with miter joints after applying PVC solvent cement and screwed with full body threaded star headed SS screws having minimum frames density of 750 kg / cum, screw withdrawal strength of 2200 N (Face) and 1100 N (Edge), minimum compresssive strength of 58N/sq.mm, modulus of elasticity 900 N/sq.mm and resistance to spread of flame of class A category with property of being termite / borer proof, water / moisture proof and fire retardant and fixed in position of with M.S hold fast/lugs /SS dash fasteners of required dia and length complete as per direction of Engineerin-charge (M.S holdast/lugs or SS dash fastners shall be paid for separately) Note: For WPC solid door / window frames, minus 5mm tolerance in dimensions i.e. depth and width of profile shall be acceptable . Variation in profile dimension on plus side shall be acceptable but no extra payments on this account shall be made. - Frame size 50 x 100 mm |
| 64 | Providing and fixing factory made single extruded WPC (Wood Polymer Composite) solid board one side white color and other side of board laminated with PVC foil of minimum 14 micron thickness of approved design pasted with hot melt adhesive for cup boards, work stations and bathroom/ kitchen cabinet etc. of required sizes comprising of virgin polymer of K value 58-60 (Suspension Grade), calcium carbonate and natural fibers (wood powder/ rice husk/ wheat husk) and non toxic additives (maximum toxicity index of 12 for 100 gms) having minimum density of 650 kg/cum and screw withdrawl strength of 1800 N (Face) and 900 N (Edge), minimum |
| 65 | compressive strength 50N/sq.mm , modulus of elasticity 850 N/sq.mm and resistance to spread of flame of class A category with property of being termite/borer proof, water/moisture proof and fire retardant and fixing with stainless steel piano hinges/ soft close clip on concealed hinges of required size with necessary full body threaded star headed counter sunk S.S.screws, all as per direction of Engineer-in-charge. (Note: Stainless steel piano hinges/ soft close clip on concealed hinges and necessary S.S.screws shall be paid separately) - 25 mm thick |
| 66 | Providing and fixing in position UPVC moulded equal Tee (0.6 Mpa) conforming to IS 7834 part II and ISI marked,including labour charges for jointing, jointing materials etc,complete - 110mm dia |
| 67 | Providing and fixing in position UPVC moulded plain coupler (0.6 Mpa) conforming to IS 7834 part II and ISI marked,including labour charges for jointing, jointing materials etc,complete - 110mm dia |
| 68 | Providing and fixing in position UPVC moulded elbow (0.6 Mpa) conforming to IS 7834 part II and ISI marked,including labour charges for jointing, jointing materials etc,complete - 110mm dia |
| 69 | Providing and fixing in position UPVC moulded endcap (0.6 Mpa) conforming to IS 7834 part II and ISI marked,including labour charges for jointing, jointing materials etc,complete - 110mm dia |
| 70 | Providing and laying of Non shrink free flow micro concrete Renderco RG or equivalent in the proportion 1:1 (One Renderco RG: One graded stone aggregate of 12.5mm and below through the drilled holes till the voids and damaged area are completely filled and set to an avergae thickness of 50mm as directed by the Engineer-In-charge. |
| 71 | Providing leak proof centering and shuttering using 25mm thick plywood for damaged slab / beam to carrying out micro concreting work including sealing the gaps if any with Renderoc plugging compound and removal of form work. |