|
| 1 | M&L for servicing of AHU having capacity 10,000 cfm & 9000 cfm forSMC floor mounted -06 Nos and ceiling mounted 06 Nos Make - Air Flow, floor mounting typeand ceiling mounting typeused in central AC plant including M&L for grinding, polishing and balancing the shaft replacement of bearings, bushes and checking alignment and cleaning and washing of cooling coil and filters for smooth functioning of AC plant complete all as specified and directed. |
| 2 | Supply and fixing in replacement shaft seal assembly, neoprene \"O\" rings of service valves, gaskets etc suitable for existing compressor complete all as specified and directed. |
| 3 | Nitrogn leak test of each plant by filling nitrogen gas upto 300 PSI pressure for 24 hours and vaccum the system, with vaccum pump complete all as specified and directed. |
| 4 | Supply and fixing in replacement strip heater 2KW as per the existing at site requirement complete all as specified and as directed by Engineer-in-Charge. |
| 5 | Description all as per ser item No 4 above but strip heater 3 KW complete all as specified and as directed by Engineer-in-Charge. |
| 6 | Supply and fixing in replacement expansion valveas per site requirement suitable for5.5 TR package unit complete all as specified and as directed by Engr-in-Charge. |
| 7 | Supply and fixing in replacement expansion valveas per site requirement suitable for10.5 TR package unit complete all as specified and as directed by Engr-in-Charge. |
| 8 | Supply and fixing in replacement expansion valveas per site requirement suitable for 50 TR Chiller unit complete all as specified and as directed by Engr-in-Charge. |
| 9 | Supply and fixing in replacement expansion valveas per site requirement suitable for75 TR Chiller unit complete all as specified and as directed by Engr-in-Charge. |
| 10 | Supply and fixing in replacement of V belt suitable for blower motor/compressor (as per sample) complete all as specified and as directed by Engineer-in-Charge. Make:- Fenner/ Flexon/ Asian. |
| 11 | Supply and fixing in replacement of contactor Type MNX 32, 3 pole with NO-NC complete all as specified and as directed by Engineer-in-Charge. Make:- L&T/Siemens/C&S |
| 12 | Supply and fixing in replacement of contactor Type MNX 25, 3 pole with NO-NC complete all as specified and as directed by Engineer-in-Charge. Make:- L&T/Siemens/C&S |
| 13 | Supply and fixing in replacement of contactor Type MNX 12/ MNX 18, 3 pole wit NO-NC complete all as specified and as directed by Engineer-in-Charge. Make:- L&T/ Siemens/ C&S |
| 14 | Supply and fixing in replacement of contactor Type NC-1 18, 3 pole without overload relay complete all as specified and as directed by Engineer-in-Charge. Make:- L&T/ Siemens/ C&S |
| 15 | Supply and fixing in replacement of contactor Type NC-1 32 , 3 pole without overload relay complete all as specified and as directed by Engineer-in-Charge. Make:- L&T/ Siemens/ C&S |
| 16 | Supply and fixing in replacement of contactor Type MNX-50, 3 pole with NO-NC complete all as specified and as directed by Engineer-in-Charge. Make:- L&T/ Siemens/ C&S |
| 17 | Supply and fixing in replacement of contactor Type MNX-70, 3 pole with NO-NC complete all as specified and as directed by Engineer-in-Charge. Make:- L&T/ Siemens/ C&S |
| 18 | Supply & fixing in replacement MCB 63 Amps TPN, 415 Volts, 10 kA complete all as specified and as directed. Make:- Havells/HPL |
| 19 | Supply & fixing in replacement MCB 40 Amps TPN, 415 Volts, 10 kA complete all as specified and as directed. Make:- Havells/HPL |
| 20 | Supply & fixing in replacement MCB 32 Amps TPN, 415 Volts, 10 kA complete all as specified and as directed. Make:- Havells/HPL |
| 21 | Supply and filling Refrigerant gas R-407c in any installation of any capacity complete all as specified and as directed. |
| 22 | Supply and filling Refrigerant gas R-22 in any installation of any capacity complete all as specified and directed. |
| 23 | Supply and fixing in replacement of HP/LP cut out assembly complete all as specified and directed. |
| 24 | Opening of the existing shell and tube condenser of cpacity 3x 24 TR complete and refixing the same in the existing position after cleaning & descaling with using necessary chemical brusher with 1 HP acid circulating pump roding to be carried out in a skill manner without puncturing of copper tube etc complete all as specified and as directed by Engr-in-Charge. |
| 25 | Description all as per ser item No 24 above but for capacity 3x75 TR complete all as specified and directed. |
| 26 | Description all as per ser item No 24 above but for capacity 3x50 TR complete all as specified and directed. |
| 27 | Description all as per ser item No 24 above but for capacity 2x50 TR complete all as specified and directed. |
| 28 | Taking out existing burnt induction motor complete and material and labour for rewinding of electric motor coupled with chiller and condensor pumps of central AC plants with super enamelled copper winding wire of existing gauge of capacity 10 HPof any make including replacement of necessary ball bearings complete all as specified and as directed. |
| 29 | Description all as per srl item No 28 above but for capacity of pump 5 HP complete all as specified and directed. |
| 30 | Servicing of AHU-02 Nos of capacity 3 x 24 TR central AC plant including M&L for grinding, polishing and balancing the shaft replacement of bearings, bushes and checking alignment and cleaning and washing of cooling coil and filters for smooth functioning of AC plant complete all as specified and as directed. |
| 31 | Description all as per ser No 30 above but for capacity2 x 50 TR central AC Plant complete all as specified and directed. |
| 32 | Description all as per ser No 30 above but for capacity 3x50 TR Package AC Plant complete all as specified and directed. |
| 33 | Supply and filling/Top up of compressor oil suitable for refrigerant R-407Ccomplete all as specified and directed. |
| 34 | M&L for painting of central AC plant of capacity 3 x 75 TR incl AHU\", cooling tower all connected pipes, monoblock pumps etc where required to match with the existing colour with two coats of approved colours after preparation old existing surface (including repairing of existing insulation materials of refrigerant piping) complete all as per existing pattern including writing/marking complete all as specified and directed. |
| 35 | Description all as per Srl item No 34 above but central AC plant of capacity 3 x 24 TR complete all as specified and directed. |
| 36 | Description all as per Srl item No 34 above but central AC plant of capacity 3 x50 TR complete all as specified and directed. |
| 37 | Description all as per Srl item No 34 above but central AC plant of capacity 2 x 50 TR complete all as specified and directed. |
| 38 | M&L for opening of chilled water and condenser water Y strainers and filter pots cleaning complete and refixing the same in position after cleaning of central AC Plant of capacity 3x75 TR complete all as specified and directed. |
| 39 | Description all as per Srl item No 38 above but central AC plant of capacity 3 x 50 TR complete all as specified and directed. |
| 40 | Description all as per Srl item No 38 above but central AC plant of capacity 3 x 24TR complete all as specified and directed. |
| 41 | Description all as per Srl item No 38 above but central AC plant of capacity 2 x 50 TR complete all as specified and directed. |
| 42 | Disconnecting and removing old rusted chasis of monoblock pump set and material and labour for new MS chasis of condensor and chiller pump sets and chasis made with MS channel of size upto MC 80mm x 450mm long - 02 Nos including painting with two coats of black colour synthetic enamel paint over a coat of red oxide primer including foundationbolts of size 12 mm x 100 mm with nuts, washers etc and chasis bolts of size 12 mm x 50 mm long with nuts, washers etc, including chipping of PCC for grouting of foundation bolts and grouting complete including necessry PCC and cement plaster work for repair of existing PCC foundation of monoblock water water pump sets of capacity upto 10 HP complete all as specified and as directed. |
| 43 | M&L for cleaning of cooling tower FRP natural draft round bottle type of capacity 3 x 75 TR, removing scale from bottom and wall of cooling tower andfungus etc complete all as specified and as directed. |
| 44 | M&L for cleaning of cooling tower FRP natural draft round bottle type of capacity 3 x 50 TR, removing scale from bottom and wall of cooling tower andfungus etc complete all as specified and as directed. |
| 45 | M&L for cleaning of cooling tower FRP natural draft round bottle type of capacity 2 x 50 TR, removing scale from bottom and wall of cooling tower andfungus etc complete all as specified and as directed. |
| 46 | M&L for cleaning of cooling tower FRP natural draft round bottle type of capacity 3 x 24 TR, removing scale from bottom and wall of cooling tower andfungus etc complete all as specified and as directed. |
| 47 | M&L for servicing of indoor and outdoor unit of Package type AC plants including oiling, greasing of fan motor and replacement of synthetic filter & checking of electric circuit 5 to 10 TR Compressorfor smooth functioning of complete circuit complete all as specified and directed. |
| 48 | Taking out existing burnt induction motor complete and material and labour for rewinding of electric motor of outdoor units of package type AC plants with super enamelled copper winding wire of existing gauge of capacity 3 HP to 7.5 HP of any make including replacement of necessary ball bearings complete all as specified and as directed. |
| 49 | Supply and fixing in replacement cast aluminum fan blades with housing of size 48\" dia suitable for FRP cooling tower of central AC plant complete all as specified and as directed. |
| 50 | Supply and fixing in replacement cast aluminum sprinkler with PVC distribution pipes, Tie Bolts with clamps and bearingssuitable for FRP cooling tower of central AC plant of any capacity complete all as specified and as directed. |
| 51 | Supply and fixing in replacement PVC filling of size 450mm x 300mm x 150mm suitable for FRP cooling tower of central AC plant of capacity 45 TR to 225 TR complete all as specified and as directed. |
| 52 | Taking out microprocessor PCB of Central type AC plant of capacity 45 TR to 225 TR checking, adjusting and updating with software configuration and repairing where required including refixing to its original position after repair complete all as specified and directed. Make of Central AC Plant - Voltas. |
| 53 | Taking out microprocessor PCB of Package type AC plant of capacity 10 TR to 45 TR checking, adjusting and updating with software configuration and repairing where requiredincluding refixing to its original position after repair complete all as specified and directed. Make of Package AC Plant - Blue Star |
| 54 | Taking out PCB of Central type AC plant of capacity 45 TR to 225 TR and supply and fixing new in replacement including checking, adjusting and updating with software configuration complete all as specified and directed. Make of Central AC Plant - Voltas |
| 55 | Taking outPCB of Package type AC plant of capacity 10 TR to 45 TR and supply and fixing new in replacement including checking, adjusting and updating with software configuration complete all as specified and as directed. Make of Package AC Plant - Blue Star |
| 56 | Supply & fixing in replacement of scroll type compressor of capacity 22TR for package type AC plant complete all as specified and directed by Engineer-in-charge. Make:- Danfoss |
| 57 | Supply & fixing in replacement of scroll type compressor of capacity 10.5 TR for package type AC plant complete all as specified and as directed by Engineer-in-charge. Make:- Copeland |
| 58 | Supply & fixing in replacement of scroll type compressor of capacity 5.5 TR for package type AC plant complete all as specified and as directed by Engineer-in-charge. Make:- Copeland |
| 59 | Supply and fixing of front handle operated switch disconnector fuse unit type FN 415 Volt 100 Amp complete all as specified and as directed by Engineer-in-charge |
| 60 | S&F in replacement of butterfly valve CI 150 mm dia including rubber gasket, nuts & bolts of suitable size and existingtype as per site requirement complete all as specified and as directed. |
| 61 | S&F in replacement of butterfly valve CI 100 mm dia including rubber gasket, nuts & bolts of suitable size of existingtype and as per site requirement complete all as specified and as directed. |
| 62 | S&F in replacement of butterfly valve CI 80 mm dia including rubber gasket, nuts & bolts of suitable size as existingtype and as per site requirement complete all as specified and as directed. |
| 63 | Supply and fixing in replacement of unserviceable balance valve of size 100 mm bore dia including nut, bolt, washer etc complete all as specified and as directed. |
| 64 | Description all as per ser item No 63 but size 125 mm bore complete all as specified and as directed. |
| 65 | Supply and fixing in replacement of rotational moulded PVC water storage tank cylindrical, vertical with close top hoisted and fixed in position, three layer of capacity 5000 ltrs complete all as specified and as directed by Engineer-in-Charge |
| 66 | Description all as per ser item No 65 but 1000 lts capacity complete all as specified and as directed. |
| 67 | Supply & fixing in replacement of scroll type compressor of capacity 19 TR for chiller type AC plant complete all as specified and directed by Engineer-in-charge. Make Danfoss |
| 68 | S&F in replacementsolenoid coil kit suitable for any type of AC Plant installation complete all as specified and as directed. |
| 69 | S&F in replacement temperature sensor MCS T 100-20 for chiller AC Plants with syphon complete all as specified and as directed. |
| 70 | S&F in replacement water pressure gauge with syphon of range 0 to 100 PSI complete all as specified and as directed. |
| 71 | S&F in replacement of volt meter 0 to 500 Volts (Square type) complete all as specified and asdirected. |
| 72 | S&F in replacement of Amps meter 0 to 200 Amps with CT of appropriate ratio (Square type) as per existing size complete all as specified and as directed. |
| 73 | M&L for replacement of MS pipe of size 50 mm dia heavy duty including jointing with electric arc welding including jointing material and fittings like flanges, gaskets etc. complete all as specified and as directed. |
| 74 | Description all as per ser item No 73 here-in-before but size of pipe 65 mm bore complete all as specified and as directed by Engr-in-Charge. |
| 75 | Description all as per ser item No 73 here-in-before but size of pipe 80 mm bore complete all as specified and as directed by Engr-in-Charge. |
| 76 | Description all as per ser item No 73 here-in-before but size of pipe 100 mm bore complete all as specified and as directed by Engr-in-Charge. |
| 77 | Description all as per ser item No 73 here-in-before but size of pipe 125 mm bore complete all as specified and as directed by Engr-in-Charge. |
| 78 | Description all as per ser item No 73 here-in-before but size of pipe 150 mm bore complete all as specified and as directed by Engr-in-Charge. |
| 79 | Supply and fixing in replacement Refrigerant Accumulator suitable for package type AC Plant complete all as specified and as directed by Engr-in-Charge. |
| 80 | Supply and fixing in replacement drier filter suitable for package type AC Plant complete all as specified and as directed by Engr-in-Charge. |
| 81 | Supply and fixing in replacementcompressor contactor 100 Amp complete all as specified and as directed by Engr-in-Charge. |
| 82 | Disconnecting electrically, isolating the existing unserviceable MCCB TP of any make and capacity and Supply, fixing, connecting, testing and commissioning MCCB three phase, 440 volts fixed in existingpanel including necessary modification for fixing of new MCCB 630 Amp 415 V 50Hz capacity, breaking capacity 50 kA conforming to relevant IS including all jointing and connecting materials complete all as specified and as directed. Make:- Schnider/Havells/L&T. |
| 83 | Description all as per srl item No. 82 here-in-before but 400 Amps, breaking capacity 36 kA complete all as specified and as directed by Engr-in-Charge. |
| 84 | Description all as per srl item No. 82 here-in-before but 250 Amps, breaking capacity 36 kA complete all as specified and as directed by Engr-in-Charge. |
| 85 | Description all as per srl item No. 82 here-in-before but 200 Amps, breaking capacity 36 kA complete all as specified and as directed by Engr-in-Charge. |
| 86 | Description all as per srl item No. 82 here-in-before but 125 Amps, breaking capacity 16 kA complete all as specified and as directed by Engr-in-Charge. |
| 87 | Supply and fixing in replacement of fan blade of outdoor unit of package type AC Plant of capacity 10 TR to 45 TR complete all as specified and as directed by Engr-in-Charge. |
| 88 | Supply and fixing in replacement of nozzle for cooling tower as per existing at the site complete all as specified and as directed by Engr-in-Charge. |
| 89 | Supply and filling Refrigerant gas R-22 in any installation of any capacity complete all as specified and as directed. |
| 90 | M&L for replacement of bearings of pump motor assembly of capacity upto 10 HP complete all as specified and as directed by Engr-in-Charge. |
| 91 | Supply and fixing in replacement of scroll type compressor of capacity 18 HP for VRF type AC plant complete all as specified and as directed by Engr-in-Charge. |
| 92 | Supply and fixing in replacement of scroll type compressor of capacity 10 HP for VRF type AC plant complete all as specified and as directed by Engr-in-Charge. |
| 93 | Supply and fixing in replacement AHU filter of size 610mm x 610mmx50mm for AC plant complete all as specified and as directed by Engr-in-Charge. |
| 94 | Supply and fixing in replacement AHU filter of size 610mm x 305mm x 50mm for AC plant complete all as specified and as directed by Engr-in-Charge. |
| 95 | Supply and fixing in replacement AHU filter of size 305mm x 305mm x 50mm for AC plant complete all as specified and as directed by Engr-in-Charge. |
| 96 | M&L for servicing of indoor and outdoor unit of Package type AC plants including oiling, greasing of fan motor replacement of synthetic filter & checking of electric circuit 22 TR Compressor for smooth functioning of complete circuit complete all as specified and directed. |
| 97 | M&L for servicing of indoor and outdoor unit of Package type AC plants including oiling, greasing of fan motor, replacement of synthetic filter & checking of electric circuit 5.5 TR compressor for smooth functioning of complete circuit complete all as specified and directed. |
| 98 | M&L for servicing of indoor and outdoor unit of Package type AC plants including oiling, greasing of fan motor replacement of synthetic filter & checking of electric circuit 10.5 TR compressorfor smooth functioning of complete circuit complete all as specified and as directed. |
| 99 | Supply, installation, testing and commissioning of new card for SITC of main PCB card for VRF AC plant capacity 48 x 3 HP of Make Voltas complete all as specified and as directed. |
| 100 | Supply, installation, testing and commissioning of new card for SITC of invertor card for VRF AC plant capacity 48 x 3 HP of Make Voltas complete all as specified and as directed. |
| 101 | Supply, installation, testing and commissioning of new card for SITC of outdoor motor for VRF AC plant capacity 48 x 3 HP of Make Voltas complete all as specified and as directed. |
| 102 | Supply, installation, testing and commissioning of new card for SITC of T2B sensor for VRF AC plant capacity 48 x 3 HP of Make Voltas complete all as specified and as directed. |
| 103 | Supply, installation, testing and commissioning of new card for SITC of T2 sensor for VRF AC plant capacity 48 x 3 HP of Make Voltas complete all as specified and as directed. |
| 104 | M&L for pressure testing of VRF unit of capacity 48 x 3 HP of make Voltas by holding pressure of nitrogen, vacuumizing, refrigerant charging and recommissioning of AC plant complete all as specified and as directed. |
| 105 | Comrehensive maintenance of VRF type AC plant of capacity 48 x 3 HP Make Voltas Cassette type with capacity 1.7 TR and 2.6 TR for carrying out quarterly inspection as a part of preventive maintenance in accordance with relevant preventive maintenance check list and as per schedule. The salient features in the check list are as follows:-(a) Checking and repair/ maintenance the VRF system of capacity 48x3 HP and equipments such as compressor, indoor/ outdoor fan motors and their electrical controls on the respective equipments.(b) Checking and repair/ maintenance the refrigeration system for any leaks.(c) Checking and repair/ maintenance the electrical and refrigeration system for operation and adjustments of set values as necessary.(d) Lubrications of all necessary points in the system and its components in line with check list.(e) Cleaning of air filter.(f) Inspect and clean control panel of indoor and outdoor unit.(g) Inspect drain pan for any blockage in the deain opening.(h) Changing of parts or calibration of items which are required at the site.(i) Carrying out once external cleaning (Chemical/ with plane water) of condensor coil of outdoor unit.(j) Attending the break down calls. The contractor should respond immediately to the break downs in case of normal wear and tear and get rectified the defective items. (k) Servicing of above mentioned AC plant complete with connected accessories before start of the operation during summer season. Note:- The above comrehensive maintenance of AMC for VRF AC plant should be done by OEM/ authorised by OEM (Voltas) and submit the contract agreement within ten days after work order. |