| 1 | Installation of twin Moose ACSR conducto |
| 2 | String&Termin of moose conductor at CT |
| 3 | String&Term cnductor at cbl sealing end |
| 4 | String&Termin of moose conductor at LA |
| 5 | String&Term cnductor at Trfr bush term |
| 6 | Installation of LA and 220KV cable seali |
| 7 | Installation of Cable seal end structure |
| 8 | Installation of LA and LA structure |
| 9 | Installation of End termination of 220 K |
| 10 | laying of 220 KV, 1CX 400 sq.mm Cu. cabl |
| 11 | Laying of 220 KV 1CX 400 sq mm XLPE Cu c |
| 12 | Installation of 11KV side Cable Adaptor |
| 13 | Installation of 11KV Cable Adaptor box |
| 14 | laying of 11 kV, 1Cx630 Sqmm AL Cable |
| 15 | laying 11 kV,1Cx630 AL undergro |
| 16 | laying 11 kV,1Cx630 AL Cbl on cbl tray |
| 17 | Supply and exeution of 11 kV Cable Joint |
| 18 | S&E of 11kV Straight Through Joint 630 |
| 19 | S&E of 11kV End Terminations kit 630 |
| 20 | Installation of GI Cable Tray Ladder Typ |
| 21 | Installation of C1 Channel |
| 22 | G.I.Cantilever Arm fixing-750mm |
| 23 | GI Ladder Type Cable Tray fixing-600mm i |
| 24 | Laying & Termination of Power & control |
| 25 | 3CX2.5Sq.mm cu cable Laying & Terminatio |
| 26 | 5CX2.5Sq.mm cu cable Laying & Terminatio |
| 27 | 10CX2.5Sq.mm cu cable Laying & Terminati |
| 28 | 8PX0.5 pair cable Laying & Termination |
| 29 | Erection of Control & relay pannel |
| 30 | installation, and mounting of Control & |
| 31 | Supply & installation of Earthing system |
| 32 | Installation & cnt of earth cable trays, |
| 33 | Supply and installation earth pit-pipe |
| 34 | testing & commissioning |
| 35 | testing & commissioning |