| 1 | Supply of Intelligent addressable Multi-sensor Smoke Detector with base Model (FSP-951T +B-501) and all other accessories. |
| 2 | Supply of Intelligent addressable Manual Call Point (NBG-12 LX) with base and all accessories. |
| 3 | Supply of Horn Cum Strobe Model-P1224MC (P2RL) with all accessories. |
| 4 | Supply of Module for Connecting Horn Model (FCM-1) with all accessories. |
| 5 | Supply of Loop Control Module (LCM-320) |
| 6 | Supply of Loop ExpanderModule (LEM-320) |
| 7 | Supply of REFLECTIVE TYPE PROJECTED BEAM SMOKE DETECTOR (FS-OSI-RI) along with reflector compatible with Notifier 3030 with all accessories. |
| 8 | Supply ofRTS151KEY Switch forreset and testing of beam detector from ground level along with wall mounting baseforbeam detector |
| 9 | Supply of ISO-X (Fault Isolator Module) |
| 10 | Supply of Spare Power Supply (AMPS-24E Power Supply) Compatible with Notifire 3030. |
| 11 | Supply of Junction Box for installation of smoke detector along 2 number required size SS cable Glands. |
| 12 | Supply of metallic 4\" (H) X 4\" (W) X 2\" (D) Junction Box for installation of FCM, MCP, Horn Cum Strobe, Isolator along with 2 number required size SS cable Glands. |
| 13 | Supply of weather proof JB500(H) X 300(W) X 100(D) along with DIN rail and 20 TBS and 6 number required size SS cable Glands. |
| 14 | Supply of approved make Red color Armoured 1 pair X1.5 sq mm Twisted pair FRLS Cable |
| 15 | Supply of approved make Black color Armoured 1 pair X1.5 sq mm Twisted pair FRLS Cable |
| 16 | Installation of Intelligent Addressable Multi-Sensor Smoke Detector with base Mode with all accessories. Any material required for the same shall be in the scope of vendor. |
| 17 | Installation of Intelligent Addressable Manual Call Point (NBG-12 LX) with all accessories. Any material required for the same shall be in the scope of vendor. |
| 18 | Installation of Horn Cum Strobe Model-P1224MC (P2RL) and FCM-1 with all accessories. Any material required for the same shall be in the scope of vendor. |
| 19 | Installation of LEM. Any material required for the same shall be in the scope of vendor. |
| 20 | Installation of LCM. Any material required for the same shall be in the scope of vendor. |
| 21 | Installation of REFLECTIVE TYPE PROJECTED BEAM SMOKE DETECTOR (FS-OSI-RI) along with reflector. Any material required for the same shall be in the scope of vendor. |
| 22 | Installation of Isolator Module (ISO-X). Any material required for the same shall be in the scope of vendor. |
| 23 | Installation of Junction Box with all accessories along with cable glading and termination. Any material required for the same shall be in the scope of vendor. |
| 24 | Installation of weather proof JB500(H) X 300(W) X 100(D) and cable glanding and termination. Any material required for the same shall be in the scope of vendor. |
| 25 | Installation and configuration of RTS151KEY reset switch along with base for resting of beam detector. Any material required for the same shall be in the scope of vendor. |
| 26 | laying of red and black Armoured 1 pair X1.5 sq mm Twisted pair FRSL Cable These cables shall be laid on wall surface / ceiling / existing trenches/in GI pipe/cable tray and on structures etc by proper clamping arrangement as directed by EIC. (GI pipe, trenching is separate item) |
| 27 | Trench cutting of 400Depth mm X 450 Width mmin hard/ soft soil including road cutting for laying ofGI pipe and cables and concreting the cable trench with concreting layer with ratio of cement concreting material (1*2*4) (It means 4 parts of crushed stones mixed with 2 parts of sand and 1 part of cement ) as directed by EIC of the work. Supply of Cement, sand and crushed stones and other required material shall be in the scope of vendor. |
| 28 | Installation, and Commissioning of complete system. it also includes Up gradation of firmware and Software of exiting system including Spare, re-programming and integration of new device in existing system. It also Include drilling, Re-termination of panel wiring in existing panel, testing of all existing device and new device.Configurations of Hooter cum flasher and testing of same. Configuration of Notifier 3030 Fire Alarm system and ensure trouble free system.Documentation of Testing of complete system.Documentation charge Site TrainingSupply and installation of any other material required for integration of new supply device ,proper working of all device and to make existing system trouble free. |