| 1 | SCHEDULE-A Filling in foundation & plinth with sand including watering & ramming etc complete as per the direction of the Engineer-incharge. |
| 2 | Filling in foundation & plinth with sand including watering & ramming etc complete as per the direction of the Engineer-incharge. |
| 3 | Cement concrete (1:4:8) with 4cm size h.g.b. hand broken metal of approved quality from approved quarry with ramming watering and curring etc. complete including cost, taxes, royalty convence charge of all worksite, supply of cement T&Pmaterial to required etc. complete as per the direction of the Engineer-incharge. |
| 4 | Cement concrete (1:2:4) with 12mm size black C.B. hand broken chips of size black C.B. hand broken chips of approved quality from approved quarry with ramming watering and curring etc. complete including convence charge of all material tocost, taxes, royalty worksite, supply of cement T&P required etc complete as per the direction of the Engineer-incharge. |
| 5 | Brick work with K.B. Brick 25cm x 12cm x 8cm size having crushing strength not less than 75kg / cm2 with dimensional tolerrance + 8% in cement mortar (1:6) in foundation & plinth etc. complete as per the Engineer-incharge. |
| 6 | 12mm cement plaster in cement mortar (1:6) finished smooth to brick work after racking out joints including waterring and curring with cost, taxes, royalty and conveyance charges of all material to the worksite and supply of all labour and T&P required for the work etc complete as directed by the Engineer-incharge. |
| 7 | Filling F&P with excavated materials, including watering and ramming. |
| 8 | Writing charge of required information and data on both side of the transperancy pillar including supplying of approved paints and required material for writing etc. complete as per the direction of the Engineer-incharge. |
| 9 | Labour charges for installation of 10HP Motor including fitting & fixing of base frame, fitting & fixing suction and delivery pipe to motor, NR Valve, Foot Valve, Sluice Valve and other fitting materials including cutting, welding and construction of supporting pillar etc. complete as per the direction of the Engineer-incharge. |
| 10 | 100 mm Ø C.I. Foot Valve should be of swing type friction less with single disc confirming to IS – 4038/1979 of reputed brand |
| 11 | Monoblock pump set total head of 18 mtrs capable to discharge 1700 LPM with 10HP/7.5KW squirrel cage induction motor fitted with bronze impeller TB-2 of IS 318/1981, companion flanges & Class \"F\"insulation suitable for operation 415 volt +6%-15% 3 phase, 50Hz AC poweer supply suction/deliveery =100mmx100mm with BEE Star rated energy efficiency Pump & as per IS-9079/2002 with overall efficiency 62 to 65% of reputed brand having wide dealership net work for easy availability of spares. |
| 12 | Control Pannel with Automatic Star delta Starter, sheet steel enclosure suitable for operation of Squirrel cage induction motor up to 10 HP with 16 Amp (AC -3) duty contractor at 415 Volt+6%-15%, 3 phase, 50 Hz AC supply with over load relay range 6.00 to 9.50 Amp & no volt coil with electronic timer suitable for operation at voltage range of 300 to 440 V. The Starter should provide dependable protection against over load and single phasing fitted with Volt meter,Ameter,MCB in complete shape including Indicator Lamp |
| 13 | 63 Amp Main Switch Triple pole & neutral of voltage range 440 volt of re-wirable fuse and shall confirm to IS 4064 part I & with ISI mark. |
| 14 | 4KVA Capacitor as per IS specification |
| 15 | 3 x 10 sqmm Tarpodar cable XLPE (Cross link polyethylin) conforming to IS: 7098 (Part-II) including laying below .9mtr. of the ground and filling the excavated materials including watering and ramming. |
| 16 | SCHEDULE-BConstruction of 3 phase 11KV line as per REC standard confirming to RE Rules 1956 with 300 kg 9mtr long PSC pole support in 60M span, with interposing of 300kg 9mtr long PSC pole-1no, 55 Sqmm AAA Conductor,11 KV \"V\" Cross arm,with required No.of 11 KV T& C Disc.Insulators & 11 KV Pin insulators,Couping & Padding of Poles. Danger Board at each Pole,Anti Climbing Devices,Stay Set at Bending point & double stay at end point with 18mm G.I.H.T. Stay, concerting of Pole & Stay with Anchor plate,guarding at Road Crossing etc. including cost of all materials,labour transportation, errection,inspection & commissioning etc. complete as per direction of Engineer-in -Charge |
| 17 | Construction and erection of 11/0.4KV ,25KVA D.P. Substation confirming RERules1956,mounted on 2.80mtr Long channel2nos,supported in 300 Kg 9mtr long PSC pole 2nos alongwith AB switch, HG fusemountingchannel, cantiliver channel, Tranaformer belting with 2.80mtr long angle 2nos,insulator, hard wire fitting, lightning arrestor-3nos , stay accessories danger board, provision for anti climbing devices to D.P. ,LT distribution box with kit kat fuse with MCCB 25 KVA *** rated tansformer ,35mm2 x3 1/2 core PVC cable and other materials required ,earthing with G.I. pipe , G.I. wire and G.I. flat and other materials like nut bolt, washer etc.,socket with concreting of poles and stay including barbed wire fencing(size 15\" x10\"),construction of retaining wall, errection of RCC fencing post, Sand filling and metal spreading around the S/S ,fixing of iron gate etc. including cost of all materials, labour, transportation ,errection, testing and commissioning & inspection etc. as per direction of Engineer-in -charge |
| 18 | 11 KVA line protecting guarding for road crossing as per estimate of TPCODL |
| 19 | Construction of 90 degree cutpoint angle with 10mtr PSC polewith required materials like Disc insulater,pin insulater ,Polymer,angles & cross arm etc as per specification & estimate of TPCODL |
| 20 | Electrical Installation including labour charges for fitting of Control Pannel ,danger board,capacitor ,wiring of motor and laying of T.D. cable in underground trench including Power supply commissioning etc. complete so as to energised the pumpset as per design and drawing of OLIC as per direction of Engineer-in-charge |
| 21 | 40mm dia G.I.pipe earthing(2nos) for Pump and Pannel board near fixed foundation using 18gauge G.I. wire including all labour and required materials i.e. G.I.Socket charcoal ,salt,small size huts & bolts and any other petty items as required in the field including excavation of earth pits and fitting thereoff in complete as per the direction of Engineer-in charge Please Enable Macros to View BoQ information |